Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date28 Dec 2024
Closing Soon10 Jan 2025
Tender Amount₹ 1,50,85,000
Costs
EMD
₹ 1,51,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_515094_1Tender No
DIPR/5603/TENDER/2024 dt 26.12.2024Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Picking the existing black top/ WBM surface to 50 MM depth including labour, hire charges d plants and all other incidental charges etc. complete as per MOST specification.
-
-
-
... More
KM 0/0 -2660
2251.3
-
-
... More
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out
-
-
-
... More
KM 0/0 -2660
1218.83
-
-
... More
Construction of subgrade for 300mm depth by using picked material obtained from the existing surface by mechanical means and then adding 50% of defict materials by using stone dust obtained from quarry with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.( subgrade using stone dust to improve CBR 7 to 9))
-
-
-
... More
0/0 - 1/0
270
-
-
... More
1/0 - 2/0
269.22
-
-
... More
2/0 - 2/660
313.2
-
-
... More
Providing US Gravel with a lead of KM including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc
-
-
-
... More
0/0 - 1/0
90
-
-
... More
1/0 - 2/000
89.74
-
-
... More
2/0 - 2/660
59.4
-
-
... More
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
-
-
-
... More
0/0 - 1/0
150
-
-
... More
1/0 - 2/000
149.56
-
-
... More
2/0 - 2/660
201
-
-
... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
-
-
-
... More
0/0 - 1/0
562.5
-
-
... More
1/0 - 2/000
560.87
-
-
... More
2/0 - 2/660
371.25
-
-
... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it.
-
-
-
... More
0/0 - 1/0
3750
-
-
... More
1/0 - 2/000
3750
-
-
... More
2/0 - 2/660
2475
-
-
... More
Providing and laying Tack coat over WMM/WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and
-
-
-
... More
0/0 - 1/0
3750
-
-
... More
1/0 - 2/000
3750
-
-
... More
2/0 - 2/660
2475
-
-
... More
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 c
-
-
-
... More
0/0 - 1/0
93.75
-
-
... More
1/0 - 2/000
93.75
-
-
... More
2/0 - 2/660
61.88
-
-
... More
Road marking with hot applied thermoplastic compound with reflecting glss beads on bituminous surface
-
-
-
... More
0/0 - 1/0
200
-
-
... More
1/0 - 2/000
200
-
-
... More
2/0 - 2/660
132
-
-
... More
Provision for ,Hm stone,
11
-
-
... More
Provision for ,Km stone,
2
-
-
... More
Provision for Name board
1
-
-
... More
90 cm Equilateral triangle (Cautionary) sign Bord
3
-
-
... More
Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonalgrowth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
-
-
-
... More
For the First Year from the date of
completion of work
2.66
-
-
... More
For the Second Year from the date of
completion of work
2.66
-
-
... More
For the Third Year from the date of
completion of work
2.66
-
-
... More
For the Fourth Year from the date of
completion of work
2.66
-
-
... More
For the Fifth Year from the date of
completion of work
2.66
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%