Public Works Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Public Works Department - PWD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date19 Nov 2024
Closing Date3 Dec 2024
Tender Amount₹ 87,80,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying and filling in foundation, basement, with Conveyed Earth of 5KMMR in Layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.

52.7

-

-

... More
Supplying and FILLING GRAVEL Supplying and filling in 'foundation and basement with filling crushed stone sand in layers of not more than 15cm.thick well rammed watered and compacted -1m3 etc., complete complying with standard specification.

103.5

-

-

... More
Supplying and filling in foundation, basement, etc with filling stone dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.

45.3

-

-

... More
Brick work in Cement Mortar 1:6 ( one Cement and Six crushed stone Sand (M Sand))using best quality of Country bricks 8-3/4"x4-1/4"x2-3/4" including Pointing with same mortar levelling and curing, etc., complete complying with standard specification.

-

-

-

... More
For Foundation and Basement

44

-

-

... More
For Superstructure in Ground Floor

65.6

-

-

... More
For Superstructure in First Floor

24.3

-

-

... More
Brick work in Cement Mortar 1:5 ( one Cement and Five crushed stone Sand (M Sand))using best quality of Country bricks 8-3/4"x4-1/4"x2-3/4 includingPointing with same mortar levelling and curing, etc., complete complying with standard specification.In Foundation and Basement

16.2

-

-

... More
Supplying and erecting Steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)

149

-

-

... More
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height For plane surfaces as detailed below , in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid).

-

-

-

... More
For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams, etc.

416.5

-

-

... More
For plane surfaces such as rectangular or square RCC columns, sunshades, top and bottom slab of RCC boxing, etc.

282.1

-

-

... More
Providing and laying in position, standardised concrete Mix M-20 Grade in accordance using 20mm with IS:456-2000, and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/ms and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu'm') 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).

-

-

-

... More
For Foundation and Basement

77.7

-

-

... More
For Superstructure in Ground Floor

64.5

-

-

... More
For Superstructure in First Floor

3.4

-

-

... More
Supplying, fabricating and placing in position M.S or R.T.S reinforcements grill for RCC works as per the design given including cost of steel and G.I black binding wire etc., complete complying with standard specification. (The contractor will have to make his own arrangements for the supply of MS plain rod / RTS rod and GI binding wire)

164.7

-

-

... More
Cement concrete 1:5:10 (one cement, five Crushed stone M-Sand and ten broken stone) using hard broken granite stone jelly 40mm gauge for flooring including dewatering if found necessary and laid in layers of not more than 15cm thick in the case of foundation etc. complete complying with standard specification

32.3

-

-

... More
Brick partition walls using best quality of Country bricks 8-3/4" x 4-1/4" x 2-3/4" in Cement Mortar 1:3 (One Cement and Three crushed stone Sand (M Sand)) using hoop iron reinforcement if found necessary including curing etc. complete and as directed by the departmental officers. (Hoop iron reinforcement will be measured and paid for separately) in Ground Floor

7.6

-

-

... More
Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three Crushed Stone(M-Sand)) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments etc Complete as Per Standard Specification., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc. complete complying with standard specification.

302.3

-

-

... More
Paving the floor with pre-polished concrete anti-skid step tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three Crushed Stone sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)

23.9

-

-

... More
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)25mm thick

72

-

-

... More
Supplying and fixing fine polished cuddapah slab of following thickness for cup-board arrangements including laying to correct alignment with necessary cement mortar and black powder etc, complete complying with standard specification and as directed by the departmental officers Cuddapah Slab 38-40 mm thick

8.7

-

-

... More
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.

21

-

-

... More
Finishing the top of roof with one course of approved first quality machine pressed tiles of size 230 mm x 230 mm x 20 mm thick of approved quality laid in cement mortar 1:3 (one cement and three Crushed Stone Sand (M-Sand)) 12mm thick mixed with water proofing compound confirming to Indian standard specification as approved by the departmental officers at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same mortar mixed with the water proofing compound and red oxide etc. complete complying with standard specification and as directed by the departmental officers

271.2

-

-

... More
Supplying and fixing in position best approved BIS quality of PVC rain water down fall pipes having a working pressure of 4 Kg./sq.cm of following dia. including cost of necessry PVC shoe, PVC bend, cast iron gratings of required diameter and special clamps, brass screws, nails, etc. and fixing of cast iron gratings at junction of parapet and the RCC roof slab including finishing neatly etc. complete. The rate shall be inclusive of cost of removable cast iron grating. The PVC pipe shall be fixed in wall with special type of clamps. Special type of "U" clamp at the centre of the pipe line shall be fixed in addition to those for more than 3.0 metre pipe length etc., complete complying with standard specification. 110 mm dia pipe

18

-

-

... More
Supplying and fixing in position steel balustrade using 20mm size square bars at 15cm centre to centre and two balusters in single step centrally located and top shall be welded to 40mmx6mm mild steel flat to fix the handrail and bottom fixed in the step concrete M.S. Flats of size 50mmx6mm to be provided at the centre of the balustrade connecting all the square bars to the entire length of the balustrade and the square bars well anchord in the floor / step concrete through fish tail splay at bottom including painting the steel member of the balustrade with one coat of red oxide primer etc., complete complying with standard specifications.

21.1

-

-

... More
Supplying and fixing 40mm dia GI pipe for staircase hand rail including labour charges for cutting, welding and fixing with MS flats (excluding cost of flat), etc., as directed by the departmental officers

23.5

-

-

... More
Manufacturing supplying and fixing of steel door with the following specification MS angels of size 40x40x6mm are used for the outer frames and M.S. angles of size 35x35x6mm for the shutter frames stiffeners with 32 x 6mm M.S flat is provided at required intervals in the shutter frame. 18-gauge C.R. sheet laid as panel in the shutter and welded intact. M.S. flat 18x5mm is welded over the 32 x 6mm M.S. flat sandwitching the C.R. sheet in between additional stiffeners with 18x5mm M.S. flat is provided diagonally at the rear side of the shutter, 3nos. of hinges in case of single leaf and 6nos. of hinges in double leaves shutter to be provided 6nos. of holdfasts 120 mm in length made of angle section spliced at the ends are welded to the outer frames of the door. Tower bolts 2nos. one at the top and the other at the bottom are provided 1noAldrop is provided incase of double leaf door at lock rail section in the door in single leaf door, one more aldrop is provided in the inner lock rail section of the door One rotaing locking arrangements for the inner side of the door and additional provision for locking arrangements for lock is provided on the rear side of the door at an appropriate place. Incase of double leaf door M.S.Flat 32 x 3mm at 1.1Kg/m is provided on the one shutter t conceal the gap between the two shutters.at an appropriate place in the door. A tie bar is provided at the bottom of the frame to prevent twisting of frame during transportation and fixing. All members are given a coat of red oxide primer as directed by the departmental officers. The rate includes cost of all materials, labour charges, transportation to site of work, loading, un loading and all other incidental charges etc., complete. Double Leaf

11.6

-

-

... More
Manufacturing supplying and fixing of steel door with the following specification MS angels of size 40x40x6mm are used for the outer frames and M.S. angles of size 35x35x5mm for the shutter frames stiffeners with 32 x 6mm M.S flat is provided at required intervals in the shutter frame. 18-gauge C.R. sheet laid as panel in the shutter and welded intact. M.S. flat 18x5mm is welded over the 32 x 6mm M.S. flat sandwitching the C.R. sheet in between additional stiffeners with 18x5mm M.S. flat is provided diagonally at the rear side of the shutter, 3nos. of hinges in case of single leaf and 6nos. of hinges in double leaves shutter to be provided 6nos. of holdfasts 120 mm in length made of angle section spliced at the ends are welded to the outer frames of the door. Tower bolts 2nos. one at the top and the other at the bottom are provided 1no. Aldrop is provided incase of double leaf door at lock rail section in the door in single leaf door, one more aldrop is provided in the inner lock rail section of the door One rotaing locking arrangements for the inner side of the door and additional provision for locking arrangements for lock is provided on the rear side of the door at an appropriate place. Incase of double leaf door M.S.Flat 32 x 3mm at 1.1Kg/m is provided on the one shutter t conceal the gap between the two shutters.at an appropriate place in the door. A tie bar is provided at the bottom of the frame to prevent twisting of frame during transportation and fixing. All members are given a coat of red oxide primer as directed by the departmental officers. The rate includes cost of all materials, labour charges, transportation to site of work, loading, un loading and all other incidental charges etc., complete.Single Leaf

2.4

-

-

... More
Fabricating, Supplying and fixng in position of steel sheeted windows ( Three Leaves) with the following specifications. Outer frames of windows made of 'Z' section F7D of size 33 x 25 x 3mm at 1.419 kg/ m and mullion 'J' section (F4B) of size 46x25x3mm at 2.28kg/m and shutter section of made of F7D of 33x25x3mm at 1.419 kg/m as specified in IS 7452/1990. Each openable shutter should not exceed a width of 600mm to enable separate operations and easy maintenance. The panel of the shutters to be covered with 18 gauge cold rolled sheet of superior quality and welded intact with shutter frames. Horizontal stiffeners using 18x5mm MS Flat at 0.70kg/m at 3 Nos. for each shutter and additional diagonal stiffners of the same MS flats at all the four corners of each shutters to the suitable length welded to the shutters, for holding the CR Sheets in position firmly2 numbers of sturdy hinges and one number of handle-cum-latch of special type made with 18x5mm MS flats are revetted to the shutters at an appropriate height in window. suitable opening is left for its easy operation. a stopper square rod for handle is provided in the mullion section at suitable place to catch the window handle. each window shutter having an adustable stay made out of 18 x 5mm at 0.70 kg/ m MS flat of lenght 320mm with three adjustable position. A matching peg is provided in the outer frame of the window at suitable place. 4 Nos. of hold fasts of 120mm length spliced at the ends are welded to the outer frame of the window by using MS flat of 18x5mm at 0.70kg/m, welded to the shutter at two place equivalent from each from top and bottom of the shutter.An MS square bar of 12mm size is welded to the inner face of the window at an equal interval not exceeding 100mm edge between them. All members are painted with one coat of anti-corrosive red oxide primer as directed by the departmental officers.All sections should be in confirmed with IS 7452/1990.The cost includes cost of all materials, labour charges and other incidental charges, etc., complete . Three Leaves

26

-

-

... More
Fabricating, supplying and fixing of steel Emergency exitdoor cum, emergency window with the following specification. M.S. angle in size 40x40x6mm are used for the outer frames and M.S. angle of sie 35x35x5mm for the shutter frame, stiffners with 32x6mm M.S. flats provided at required intervals in the shutter frames 18 guage CR sheet is laid as panel and welded instant for 1/3 bottom portion of the shutter, M.S. flat 18x5mm is welded over the 32x6mm M.S flat sandwitching the CR sheet in between additional stiffner with 18x5mm M.S. flat is provided diagonally at the rear-side of the shutter. The balance 2/3 portion at top is provided with grill at an average weight of 15kg/m2 and the top portion of operation emergency window is to be made of 25x25x3mm M.S. angle welded intact with CR sheet and 25x3mm M.S. flat at diagonally at the near side of the window at required interwals 6 Nos. of hinges to be provided,6 Nos of holdfast 100mm in length made of angle section spliced at the ends are welded to the outer frame of the door. Tower bolts 2 Nos. one at top and the other at the bottom are to be provided one aldrop is provided at an appropriate place in the door 2 Nos. of 'D' type handle for emergency window and 2 Nos of handle for door is to be provided at appropriate places. A tie bar is provided at the bottom of the outer frame to prevent twisting of frame during transportation of fixing. All members are given one coat of red oxide primer as directed by the departmental officers. The rate includes cost of materials, labour transportation to side of works, loading, unloading and all other incidental charges etc., complete.Double leaf door

11.6

-

-

... More
Manufacturing, supplying and fixing of steel doors (Entrance)with the following specification M.S angles of a size 40x40x6mm are used for the outer frames and M.S. angles of size 35x35x5mm for the shutter frames stiffeners with 32x6mm M.S. flat is provided at required intervals in the shutter frames 18 gauge C.R. sheet is laid as panel in the shutter and welded intact for 1/3 bottom portion of the shutter. M.S. flat 18x5mm is welded over the 32x6mm M.S. flat sand witching the CR sheet in between. Additional stiffener with 18x5mm M.S. flat is provided diagonally at the rear side of the shutter. The balance 2/3 portion at top is provided with grill at an average weight of 20kg/sq.m with 3mm pin headed glass used for glazing and fixed with 15x12 mm teakwood beeding and 6 Nos hinges for double leaves shutter to be provided 6nos of holdfasts 120mm in length made of angle section spliced at the ends are welded to the outer frame of the door. Tower bolts 2nos. one at top and the other at the bottom arte provided one aldrop is provided at on appropriate place in the door. A Tie bar is provided at the bottom of the outer frame to prevent twisting of frame during transportation or fixing. All members are given one coat of red oxide primer as directed by the departmental officers. The rate includes cost of all meterials, labour charges,taxes, transportation to site of work , loading, unloading and all other incidental charges etc.,complete. Double leaf

9.3

-

-

... More
Plastering with Cement Mortar 1:5 (One cement and five Plastering Sand, 12 mm thick finishing in all floors including curing etc., complete complying with standard specification and as directed by the departmental officers.

849.1

-

-

... More
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Plastering Sand) ) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers

558.9

-

-

... More
Painting two coats of newly plastered wall surface with ready mixed plastic Interior emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.

845

-

-

... More
Painting two coats of newly plastered wall surface with ready mixed plastic Exterior emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.

563.2

-

-

... More
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the red oxide priming coat in all floors including cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)

132.8

-

-

... More
Providing Black Board in two layers with first layer in C.M. 1:5(One cement and five sand) 20mm thick and second layer in combination mortor 1:1:6 (One cement one lime and six sand) 20mm thick and 50mm width including cost of one coat block oxide paint of approved quality etc., complete complying with standarded specification and as directed by departmental officers.

17.2

-

-

... More
Supplying and Installation of Ceramic Steel Chalk writing board with the following specification .GI sheet of 2mm thickness is fixed with the wall side.Over the GI sheet necessary special adhesive is spreaded and 9mm MDF Board is fixed on this GI sheet. 0.40mm thick ceramic chalk board is provided over the MDF board and the whole arrangements are fixed to the frame using heavy anodised aluminium section and chromium plated provided in the corners . The whole arrangements are fixed to the wall using wooden plugs,screws,etc.,complete.,complying with standard specification and as directed by the Departmental officers

17.2

-

-

... More
Pre-Construction anti-termite treatment plinth area – surface treatment stage-1 :- Completion of earth work for column footings before laying plain cement concrete 25mm dia Hole spaced at 30cm center to center on both direction will be made at the bottom of earth workand the chemical will be poured in the holes and will be sprayed in the four sides of earth work at the rate of 3 litres of chemical solution (Chlorophyrifos emulsion diluted in ration 1:19 (One emulsion and 19 water ) per square metre payment shall be made after completion of 3 stages. stage-II :- After filling the basement before laying flooring concrete with filling Crushed Stone Sand (M-Sand) 25mm dia holes to adepth of 450mm will be made inside the basement and the chemical will be poured in the holes at the rate of 3 litres of chemical solution (Chlorophyrifos emulsion diluted in ration 1:19 (One emulsion and 19 water ) per square metre payment shall be made after completion of 3 stages. Peripheral treatment stage-III.On completion of building and leveling the outer area adjacent to the walls column ground ponds of size (900X300 mm will be filled in the ponds at the rate of 3 litre of chemical solution per Rm payment shall be made after completion of 3 stages. Stage-IV.Spraying termite solution around the building (Out side of the building) by making crowbar holes around the building before laying the plinth protection. This holes has to be closed after the treatment

295.1

-

-

... More
Supplying and fixing Galvalume colour sheet roofing with 0.47mm thick of approved quality by drilling holes (and not by punching) with necessary ‘J’ / ‘U’ bolts and nuts etc., complete complying with standard specification and as directed by the departmetal officers

32.4

-

-

... More
Supplying and fixing mild steel iron grill for windows ventilators and grill gate etc., including one coat of red oxide primer using M.S angle of size 40 x 40 x 6 mm and grill using 20 x 6mm M.S flat and necessary hold fast with M.S angle of size 40 x 40 x 6 mm - 230 mm long spliced at end is to be provided at appropriate places for fixing the grill etc., complete complying with standard specification. The type design for the grills should be got approved by the departmental officers before execution.

141

-

-

... More
Supply and fixing of stored pressure ABC (Mono Ammonium Phospate) Powder Type Fire Extinguisher of 6 kg. capacity as per IS:15683 with pressure gauge, discharge hose & control nozzle, wall mounting bracket, safety clip etc., including conveyance, all incidental charges, neccessary scaffolding and re-doing the dismantled portions to its original condition wherever found neccessary etc, complete as per standard specification and as directed by the Departmental Officers. Make: EXCELLENT / SAFETY FIRST / EQUIVALENT

4

-

-

... More
Supplying and Fixing of Aluminium Dye Cast Letters of approved size and colour. The colour treatment process is achieved with MRF colour coat and then the processed coloured layer is set into the kiln for the heat treatment process condition etc., complete complying with standard specification.(The letters should be cast as per approved by the departmental officers)

-

-

-

... More
Aluminium Dye Cast Letters 9’’ size

23

-

-

... More
Aluminium Dye Cast Letters 6’’ size

47

-

-

... More
Providing 15'' size Emblem of good quality. The emblem should be cast as per approved by the departmental officers. The emblem to be fixed to masonry or concrete surfaces properly and as directed by the departmental officers. The rate includes cost of emblem, fixing charges at a height more than 4m including scaffolding charges, including risk allowance for working at and a height of more than 4m, dismantling and redoing masonry to original condition etc., complete complying with standard specification.

1

-

-

... More
GST 18 %

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.