Public Works Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Public Works Department - PWD Tender
Civil And Construction
Building Construction
Eprocure
Opening Date6 Feb 2025
Closing Date7 Feb 2025
Tender Amount₹ 2,64,000
Costs
EMD
₹ 2,650Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PWD_522941_1Bid Award Id
ViewTender No
13KPM/05/2024-2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Supplying and fixing in position Indian make bevelled edge mirror of approved quality and brand PVC / Fibre Glass framed 600 x 450 x 5.5mm thick mirror, shelf type with hard board backing of approved colour fixed with brass screws, rawl plug, etc., complete complying with standard specification. (The mirror should be got approved by the Executive Engineer before use on woks)
1
1105
1105
... More
Supplying and fixing approved best quality brass CP towel rail 600mm long and 20mm dia with brackets of same materials including cost of teak wood plugs and CP screws, etc., complete complying with standard specifications. (The tower rail should be got approved by Executive Engineer before use on works).
1
540
540.15
... More
Supplying and fixing best approved best quality brass CP soap tray of size 150 x 150mm including cost of teak wood plugs, brass screws, etc., complete complying with standard specifications. (The soap tray should be got approved by Executive Engineer before use on works).
1
333
333.3
... More
Supplying and fixing in position 15mm dia brass CP screw down tap / Pillar tap (heavy duty) of approved make conforming to BIS specifications and quality including cost of shellac, thread, etc., complete complying with standard specification and including cutting and threading wherever necessary. (Taps should be got approved by the Executive Engineer before use on the works)
1
376
376
... More
Supplying and fixing of Door and window curtains by using of Medium quality fabric and cost includes Anchor rod, stiching, fixing charges, transportation charges and other incidental charges etc., complete.,
15.75
900
14175
... More
Repairing and renewing of Teak wood glazed window using frame of size 75x50mmm, shutter size of 50x25mm, using 3mm pin headed glass in shtters and necessarry grill arrangememts provided in windows, etc., complete complying with standard specification and as directed by the departmental officers.
9
5957
53613
... More
Renewing and fabricating and fixing in position aluminium powder coating of any color matt anodised partly top 1/2 galzed and partly bottom 1/2 panelled door and frame made out of box section 101.6x44.45x3.18mm thick at 2.319 kg\m door shutter made out of box section 47.1x44.45x2.5mm at 1.202 kg\m for vertical style and top, lock rail sections of size 50x44.50x2.5mm @ 1.292 Kg/m and bottom 100.4x44.45x2.50mm at 1.974kg\m using clips of size 17.15x17.27x1.5mm at 0.176 kg\m with necessary metal screws, rubber beading, strike plate type handle of size 100x30x1.60mm at 0.988 kg\m on both sides, tower bolts, lock pivot arrangements and top 1/2 portion with 5.50 mm thick plain glass and bottom 1/2 portion with both side prelaminated board ( MDF ) 12mm thick for panel portion with 2 Nos. of hydraulic door closers of approved quality using aluminium extruded section body tubler type universal with double speed adjustment with ISI monogram including cost of furniture fitting such as Pivot, hinges, Tower bolt, lock, door stopper and all materials labour power consumption required for fabrication drilling required for fabrication drilling holes in RCC columns floorslabs masonry wall wherever necessary with power drills to the required extent and make the same to original condition after fixing and as directed. All the aluminium sections are to be anodised with matt finish under electrically controlled condition in accordance with IS 1868-1962 for an average anodic flim thickness of 15 microns etc., complete. The materials should be got approved by the Executive Engineer before use on works. The rate shall be inclusive of all materials, labour for fixing transportation loading, unloading, and all other incidential charges.
8.1
7804
63212.4
... More
Repairing and repainting of Officer name board includng cost of labour fixing and all other incidental charges, etc., complete
1
5200
5200
... More
Hydraulic Door closer of various sizes of approved quality using Aluminium Extruded section body tubular type universal hydraulic door closer with double speed adjustment like HARDWYN (make) 'GAZEL' (or) equivalent (with ISI Monogram)
2
1008
2016
... More
Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The wall putty shall be got approved by the Executive Engineer before use of work).
109.1
194
21179.58
... More
Supplying and applying of Two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothly with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the departmental officers. (The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (water proof abrasive sheet) cost of putty blade, labour charges for grinding the joints and sand papering, two coats of putty, scrapping the putty area to level the surface smooth, etc., complete). The putty should be got approved by the Executive Engineer before use on work
62.8
294
18469.48
... More
Painting two coats of old plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
169
179
30251
... More
Painting new wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
23.4
249
5837.13
... More
SUB TOTAL
1
1
221357
... More
GST @ 18 %
1
1
39844
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements