Pradhan Mantri Gram Sadak Yojana Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Civil And Construction
Road Construction
Eprocure
Opening Date1 May 2023
Closing Date17 May 2023
Tender Amount₹ 1,14,79,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A

-

-

-

... More
Km 0/0-4/990

872.65

-

-

... More
Providing advance BT patches using 13.2mm HBG IRC metal using 44Kg of bitumen 80/100 grade including cost and conveyance of all labour charges etc., complete

-

-

-

... More
Km 0/0 -1/0

5.63

-

-

... More
KM 1/0-2/0

1.81

-

-

... More
KM 2/0-3/0

3.53

-

-

... More
KM 3/0-4/0

3.05

-

-

... More
Km 4/0-4/990

3.68

-

-

... More
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for side berms

-

-

-

... More
Km 0/0 -1/0

95.62

-

-

... More
KM 1/0-2/0

112.5

-

-

... More
KM 2/0-3/0

112.5

-

-

... More
KM 3/0-4/0

110.25

-

-

... More
Km 4/0-4/990

109.69

-

-

... More
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat

-

-

-

... More
Km 0/0 -1/0

3198.88

-

-

... More
KM 1/0-2/0

3750

-

-

... More
KM 2/0-3/0

3750

-

-

... More
KM 3/0-4/0

3675

-

-

... More
Km 4/0-4/990

3656.25

-

-

... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-11) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site ete including hire charges and fuel charges foe 20-301 CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
Km 0/0 -1/0

95.96

-

-

... More
KM 1/0-2/0

112.5

-

-

... More
KM 2/0-3/0

112.5

-

-

... More
KM 3/0-4/0

110.25

-

-

... More
Km 4/0-4/990

109.69

-

-

... More
Road Marking by providing and laying of hot applied Thermoplastic Compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5mm exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes.

-

-

-

... More
KM 0/0 - 4/990

973

-

-

... More
Providing rumble strips covered with premix bituminous carpet, 15-20 mm at centre and 250mm wide placed at 1m intervals centre to centre at approved locations to control speed, marked with white strips of road

-

-

-

... More
KM 0/0 - 4/990

22.5

-

-

... More
Provision for HM stones

16

-

-

... More
Provision for KM stones

4

-

-

... More
Provision for Road Stud with Reflector

168

-

-

... More
Provision for Guard Stones

17

-

-

... More
Provision for Equilateral Triangle cautionary Sign Board 90 cm

20

-

-

... More
Provision for Name Board

1

-

-

... More
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)

-

-

-

... More
For 1st year maintenance

1

-

-

... More
For 2nd year maintenance

1

-

-

... More
For 3rd year maintenance

1

-

-

... More
For 4th year maintenance

1

-

-

... More
For 5th year maintenance

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.