Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Pradhan Mantri Gram Sadak Yojana - PMGSY Tender
Eprocure
Opening Date16 Sep 2020
Closing Date6 Oct 2020
Tender Amount₹ 44,25,000
Costs
EMD
₹ 45,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Dharmapuri District - Updation / Strengthening Of Road 1 No In Package No. Tn 04-12 Tnrris 2019-20 Of Palacode Block P12
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_RDTN_179615_1Bid Award Id
ViewTender No
1610/2020/R2 Dt.09.09.2020 TNRRIS 2019-20 P12Tender Authority
Pradhan Mantri Gram Sadak Yojana ViewPurchaser Address
-Website
http://http://omms.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Hardrock requirering blasting
9.38
-
-
Collection and suply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compation with power roller etc complete
-
-
-
Km.0/0-1/0
133.43
-
-
Km.1/0-1/050
6.75
-
-
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premising the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired density.
-
-
-
Km.0/0-1/050
468.78
-
-
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
3125.2
-
-
Providing and laying TACK COAT over the WBM surface using 4.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
-
-
-
Km.0/0-1/1
3160
-
-
Providing and laying premix carpet with seal coat type A for 20mm thickness using 0.18 Cum of 13.20 mm IRC size HGB metal and 0.09 cum of 11.20 mm IRC size HGB metal with and 0.09Cum of 6.70 mm IRC size HGB metal 24.40 kg of 60/70 bitumen for premixing 10 Sqm of Premix carpet including cost and conveyance of all materials to the work site and stacking them to the departmental metric gauge for Premeasurement, heating the bitumen in bitumen boiler, heating the aggregate and mixing them with bitumen in mini hot mix plant for premix carpet only, rolling by 80-100 KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet, application of bitumen for seal coat separately over premix carpet etc., including hire charges and fuel charges for Mini hot mix Plant, bitumen boiler, power roller and all other tools and plants employed but excluding cost of primer/tack cost etc., complete as per clause 509 of MOST specification..
-
-
-
Km.0/0-1/050
3010
-
-
Km.1/0-1/1
150
-
-
Culvert 1.5 m span @ Km 0/50
-
-
-
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation
70.27
-
-
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.
9.22
-
-
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
63.58
-
-
Culvert
152.18
-
-
Deck Slab
9.88
-
-
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
0.27
-
-
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
2.69
-
-
Reinforcement Concrete 1: 1 .5: 3 Mix using 20mm ISS HG metal including cost and conveyance of all materials and Labours charges ect., completed
2.65
-
-
Weepholes
15.12
-
-
Bitumen pad
2.52
-
-
Culvert 1.5m span @ Km 0/190
-
-
-
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation
70.27
-
-
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.
9.22
-
-
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
63.58
-
-
Culvert
152.18
-
-
Deck Slab
9.88
-
-
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
0.27
-
-
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
2.69
-
-
Reinforcement Concrete 1: 1 .5: 3 Mix using 20mm ISS HG metal including cost and conveyance of all materials and Labours charges ect., completed
2.65
-
-
Weepholes
15.12
-
-
Bitumen pad
2.52
-
-
Culvert 1.5m span @ Km 0/552
-
-
-
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation
70.27
-
-
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.
9.22
-
-
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
63.58
-
-
Culvert
152.18
-
-
Deck Slab
9.88
-
-
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
0.27
-
-
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
2.69
-
-
Reinforcement Concrete 1: 1 .5: 3 Mix using 20mm ISS HG metal including cost and conveyance of all materials and Labours charges ect., completed
2.65
-
-
Weepholes
15.12
-
-
Bitumen pad
2.52
-
-
Culvert 1.5m span @ Km 0/815
-
-
-
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation
70.27
-
-
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.
9.22
-
-
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
63.58
-
-
Culvert
152.18
-
-
Deck Slab
9.88
-
-
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
0.27
-
-
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
2.69
-
-
Reinforcement Concrete 1: 1 .5: 3 Mix using 20mm ISS HG metal including cost and conveyance of all materials and Labours charges ect., completed
2.65
-
-
Weepholes
15.12
-
-
Bitumen pad
2.52
-
-
Pipe Culvert @ Ch 980 m
-
-
-
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation
9.72
-
-
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.
2.77
-
-
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
8.06
-
-
Deck Slab
17.63
-
-
Supply and fixing of NP3 Pipes
7.5
-
-
Provision of Name Board
1
-
-
Provision of Km Stone
1
-
-
Provision of Hm Stone
4
-
-
Provision of Sign Board
1
-
-
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-