Pradhan Mantri Gram Sadak Yojana Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Pradhan Mantri Gram Sadak Yojana - PMGSY Tender
Civil And Construction
Road Construction
Eprocure
Opening Date16 May 2024
Closing Date18 Jul 2024
Tender Amount₹ 2,02,51,000
Costs
EMD
₹ 4,06,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_133968_1Bid Award Id
ViewTender No
TN22213Tender Authority
Pradhan Mantri Gram Sadak Yojana ViewPurchaser Address
-Website
http://http://omms.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Km. 4/0 - 5/0
1189.58
-
-
Km. 5/0 - 6/0
1129.91
-
-
Km. 6/0 - 6/60
715.2
-
-
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel Shoulder) 'Km.3/600 - 4/000
131.56
-
-
Km. 4/0 - 5/0
337.5
-
-
Km. 5/0 - 6/0
322.55
-
-
Km. 6/0 - 6/60
202.5
-
-
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 (WMM).'Km.3/600 - 4/000
231.94
-
-
Km. 4/0 - 5/0
562.5
-
-
Km. 5/0 - 6/0
540
-
-
Km. 6/0 - 6/60
337.5
-
-
Providing and laying Bituminous Macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Waste Plastic) 'Km.3/600 - 4/000
77.32
-
-
Km. 4/0 - 5/0
187.5
-
-
Km. 5/0 - 6/0
180
-
-
Km. 6/0 - 6/60
112.5
-
-
Providing and applying Prime Coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Low Porosity 'Km.3/600 - 4/000
1546.3
-
-
Km. 4/0 - 5/0
3750
-
-
Km. 5/0 - 6/0
3600
-
-
Km. 6/0 - 6/60
2250
-
-
Providing and applying Tack Coat with Bitumen Emulsion (RS-1) using emulsion distributor at the rate of 0.2 to 0.25 kg per sqm on the prepared Granular surface treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 (ii). 'Km.3/600 - 4/000
1584.56
-
-
Km. 4/0 - 5/0
3750
-
-
Km. 5/0 - 6/0
3600
-
-
Km. 6/0 - 6/60
2250
-
-
Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 [MIX SEAL SURFACING-WASTE PLASTIC]. 'Km.3/600 - 4/000
1584.56
-
-
Km. 4/0 - 5/0
3750
-
-
Km. 5/0 - 6/0
3600
-
-
Km. 6/0 - 6/60
2250
-
-
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.Pipe culvert at : 3600 Removal of Pipes
7.5
-
-
Removal of Body wall
1.16
-
-
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable Cross Drain @ CH 3600
26.6
-
-
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. Cross Drain @ CH 3600
1.9
-
-
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Cross Drain @ CH 3600
2.85
-
-
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works Cross Drain @ CH 3600
8.4
-
-
Vibrated Reinforced cement concrete M25 ISS hard granite broken metal including cost and conveyance of all materials to site and cement at site including cost of formwork,lead for soft water, labour charges for mixing, transporting, laying, and curing concrete working in heights and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for COVER SLAB Cross Drain @ CH 3600
4
-
-
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor. Cross Drain @ CH 3600
0.11
-
-
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable 1.5m Span Culvert @ CH 3750,
89.87
-
-
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. 1.5m Span Culvert @ CH 3750, ,
7.93
-
-
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. 1.5m Span Culvert @ CH 3750
10.57
-
-
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works 1.5m Span Culvert @ CH 3750
51.12
-
-
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works 1.5m Span Culvert @ CH 3750
29.12
-
-
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. 1.5m Span Culvert @ CH 3750
3.36
-
-
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. 1.5m Span Culvert @ CH 3750
3.31
-
-
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor. 1.5m Span Culvert @ CH 3750
0.35
-
-
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab 1.5m Span Culvert @ CH 3750
15
-
-
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab 1.5m Span Culvert @ CH 3750
4.5
-
-
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 1.5m Span Culvert @ CH 3750
12
-
-
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer. 1.5m Span Culvert @ CH 3750
9.25
-
-
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable Protective Works @ CH 3/700 - 3780
67.2
-
-
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. Protective Works @ CH 3/700 - 3780
16.8
-
-
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. 1 RowPipe Culvrt @ Ch. 5250,
16.8
-
-
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works Protective Works @ CH 3/700 - 3780
28.8
-
-
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works Protective Works @ CH 3/700 - 3780
81
-
-
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 Protective Works @ CH 3/700 - 3780
53
-
-
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.Pipe culvert at : 3980 Removal of Pipes
22.5
-
-
Removal of Body wall
3.05
-
-
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable 4.00m Span Culvert @ CH 3980,
137.65
-
-
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. 4.00m Span Culvert @ CH 3980 ,
12.14
-
-
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. 4.00m Span Culvert @ CH 3980
16.2
-
-
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works 4.00m Span Culvert @ CH 3980,
83.66
-
-
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works 4.00m Span Culvert @ CH 3980,
51.22
-
-
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. 4.00m Span Culvert @ CH 3980
17.09
-
-
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor. 4.00m Span Culvert @ CH 3980
1.52
-
-
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab 4.00m Span Culvert @ CH 3980
15
-
-
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab 4.00m Span Culvert @ CH 3980
6
-
-
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 4.00m Span Culvert @ CH 3980
12
-
-
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer. 4.00m Span Culvert @ CH 3980
13.27
-
-
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.Pipe culvert at : 5250 Removal of Pipes
7.5
-
-
Removal of Body wall
1.16
-
-
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable 1 RowPipe Culvrt @ Ch. 5250,
65.29
-
-
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. 1 RowPipe Culvrt @ Ch. 5250, ,
2.53
-
-
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. 1 RowPipe Culvrt @ Ch. 5250,
6.97
-
-
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works 1 RowPipe Culvrt @ Ch. 5250,
13.34
-
-
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works 1 RowPipe Culvrt @ Ch. 5250,
14.81
-
-
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer. 1 RowPipe Culvrt @ Ch. 5250
14.04
-
-
Providing and Laying reinforced Cement Concrete pipe NP3 for Culverts on first bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection works backfilling concrete and masonry works in head walls and parapets 1 RowPipe Culvrt @ Ch. 5250
7.5
-
-
Construction of Gravel/Soil-aggregate Base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller to achieve the desired density, complete as per Technical Specifications Clause 401 Grading III (GSB). 1 RowPipe Culvrt @ Ch. 5250
2.27
-
-
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable Hard Bed @ CH 5110 - 5150
199.88
-
-
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. Hard Bed @ CH 5110 - 5150
19.36
-
-
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Hard Bed @ CH 5110 - 5150
19.36
-
-
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works Hard Bed @ CH 5110 - 5150
71.75
-
-
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.(WMM) Hard Bed @ CH 5110 - 5150
37.82
-
-
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Hard Bed @ CH 5110 - 5150
25.21
-
-
CConstruction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 Hard Bed @ CH 5110 - 5150
66
-
-
Provision of Guard Stones Hard Bed @ CH 5110 - 5150
42
-
-
Provision of Rumble Strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint. KM 3/600 - 4/00
0.56
-
-
Provision for Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
600
-
-
Provision for Road Marker/ Road stud with lens Reflector
10
-
-
Provision for Name Board
1
-
-
Provision for PMGSY Logo Board
3
-
-
Provision for Sign Board (1 curve =2Nos)
2
-
-
Provision for Chevron Sign Octogan Board (90cm)
2
-
-
Provision for 60 cm Circle(Mandatory Sign Baoard)
4
-
-
Provision for Reflector - Traffic signs (Near culverts & trees) - Star sign Sticker
20
-
-
Provision for Citizen Information Board
1
-
-
Provision for Maintenance Board
1
-
-
Provision for KM Stone
3
-
-
Provision for HM Stone
12
-
-
Towards the charges for routline
maintenance of the road work executed
under PMGSY including dressing of berms
by refilling the gully with the earth from
borrow pits, cleaning of wild seasonal
growth on berms, destilting of side drains
and CD works, white washing guard stones,
painting of KM, HM stones, parapets,
cutting of branches of trees, refixing
displaced guard stones, caution boards,
speed limit boards etc., with the periodicity
for the above activities as prescribed in IRCSP-
20:2002 and as directed by the
departmental officers except for the
constructional defects which has to be
rectified by the contractor at his own cost For the First Year from the date of
completion of work
3
-
-
For the Second Year from the date of
completion of work
3
-
-
For the Third Year from the date of
completion of work
3
-
-
For the Fourth Year from the date of
completion of work
3
-
-
For the Fifth Year from the date of
completion of work
3
-
-
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-