Pradhan Mantri Gram Sadak Yojana Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Civil And Construction
Road Construction
Eprocure
Opening Date3 May 2023
Closing Date17 May 2023
Tender Amount₹ 49,78,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Km 0/0-0/450

320.43

-

-

... More
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction

-

-

-

... More
Km 0/0-0/450

202.5

-

-

... More
Waterproofing of the shoulder surface by spraying 1kg of Terrasil or Equivalent and 1kg of Zycobond or Equivalent in the ratio of 1:1:200 with Potable Water and spraying on the surface @ 3ltrs/sqm and compacting with a static roller. Complete job, finished work to be measured

-

-

-

... More
Km 0/0-0/450

1350

-

-

... More
Providing and laying water bound macadam 75 mm conscidated thickenss with Grade III metal using 1.00 cum of 63 mm to .11.20 mm IRC size HBG Metal with 0.24 cum of Gravel for blindage per 10 Sqm. Including cost and coveyance of all materials to work site and stacking them at the site to departmental gauge for pre-measurement and labour charges for spreading metal and gravel, hand packing to camber, watering with all loads for water and compaction by 80.100 km power roller including hire charges and fuel charges for power employed including necessary earthern bund to protect edges, lighting, guarding, barricadings and maintenance of diversion etc. complete as per clause 404 of most Specification.

-

-

-

... More
Km 0/0-0/450

101.25

-

-

... More
Providing and applying primer coat with cationic bitumen emulsion(water based) modified with Nanotechnology based Penetrative Reactive Water-soluble Organosilane material (forming water clear solution) qualifying as per the test, on prepared surface of granular base including cleaning of road surface and prime coat-mix made using 100 part Cationic Bitumen Emulsion (Grade CSS-1) and 200 parts of Nanotechnology Solution (1 kg Terraprime :200 liter water (≤1000ppm TDS) and spraying at the rate of 1.35 Kg/sqm using mechanical means as per Technical Specification.

-

-

-

... More
Km 0/0-0/450

1350

-

-

... More
Providing and applying tack-coat with cationic bitumen emulsion (CRS-1) in mixing ratio of 0.014 part Nanotechnology based Penetrative Reactive Water-soluble Organosilane material (forming water clear solution) : 1 part water (1000 ppm TDS) : 1 part cationic bitumen emulsion and spraying using emulsion distributor at the rate of 1.2 times of conventional spray rate 0.275 Kg per sqm (i.e 0.33 kg/sqm) on the prepared new bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503 .(ref:Mord pg.no 5-4)

-

-

-

... More
Km 0/0-0/450

1350

-

-

... More
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder with ZycoTherm Providing, laying and rolling of 20mm thick open-graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder with Nanotechnology based Organosilane Reactive Aggregate modifier material qualifying as per the test at the rate of 1 Kg per 1 ton of Binder. Providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade or emulsion grade with Nanotechnology based material to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. (ref:Mord pg.no 5-24)

-

-

-

... More
Km 0/0-0/450

1350

-

-

... More
Providing and laying of Seal coat modified with Nanotechnology based Organosilane Reactive Aggregate modifier material qualifying as per the test at the rate 1 Kg per 1 ton of Binder and sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per technical specification Clauses 510.

-

-

-

... More
Km 0/0-0/450

1350

-

-

... More
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface

-

-

-

... More
Km 0/0-0/450

90

-

-

... More
Supply and Fixing of Name Board

1

-

-

... More
Supply and Fixing of Sign Board

6

-

-

... More
Supply and Fixing of HM Stone

2

-

-

... More
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)

-

-

-

... More
For 1st year maintenance

1

-

-

... More
For 2nd year maintenance

1

-

-

... More
For 3rd year maintenance

1

-

-

... More
For 4th year maintenance

1

-

-

... More
For 5th year maintenance

1

-

-

... More
Upgradation of the road from Kambainallur road-Odasalpatty Burial Ground Road Km.0/0-0/700 (Plastic Waste)

-

-

-

... More
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.

840

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.( subgrade using Carted Earth)

-

-

-

... More
Km 0/0-0/450

498.38

-

-

... More
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete,

-

-

-

... More
Km 0/0-0/700

313.69

-

-

... More
Providing and laying water bound macadam 75 mm conscidated thickenss with Grade II metal using 1.00 cum of 63 mm to .11.20 mm IRC size HBG Metal with 0.24 cum of Gravel for blindage per 10 Sqm. Including cost and coveyance of all materials to work site and stacking them at the site to departmental gauge for pre-measurement and labour charges for spreading metal and gravel, hand packing to camber, watering with all loads for water and compaction by 80.100 km power roller including hire charges and fuel charges for power employed including necessary earthern bund to protect edges, lighting, guarding, barricadings and maintenance of diversion etc. complete as per clause 404 of most Specification.

-

-

-

... More
Km 0/0-0/700

156.85

-

-

... More
Providing and laying water bound macadam 75 mm conscidated thickenss with Grade III metal using 1.00 cum of 63 mm to .11.20 mm IRC size HBG Metal with 0.24 cum of Gravel for blindage per 10 Sqm. Including cost and coveyance of all materials to work site and stacking them at the site to departmental gauge for pre-measurement and labour charges for spreading metal and gravel, hand packing to camber, watering with all loads for water and compaction by 80.100 km power roller including hire charges and fuel charges for power employed including necessary earthern bund to protect edges, lighting, guarding, barricadings and maintenance of diversion etc. complete as per clause 404 of most Specification.

-

-

-

... More
Km 0/0-0/700

156.85

-

-

... More
Providing & Laying Tack coat 4 kgs / 10 Sqm over the WBM surface treated with using 4 kgs of Bituminous Emulsion for 10 sqm area including cost of Bitumen emulsion, including labour for applying the required Qty. of Bitumen Emulsion as tack coat by bitumen sprayer etc., complete as per clause 503 of Most specifications.

-

-

-

... More
Km 0/0-0/700

2100

-

-

... More
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 13.432Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.

-

-

-

... More
Km 0/0-0/700

2100

-

-

... More
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface

-

-

-

... More
Km 0/0-0/700

140

-

-

... More
Construction of 1.5 m RCC Slab Culvert

-

-

-

... More
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B

-

-

-

... More
RCC Slab Culvert

79.99

-

-

... More
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete

-

-

-

... More
RCC Slab Culvert

10.32

-

-

... More
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete

-

-

-

... More
RCC Slab Culvert

76.06

-

-

... More
Plain Cement Concrete 1:2:4 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc Complete,

-

-

-

... More
RCC Slab Culvert

3.36

-

-

... More
RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc,

-

-

-

... More
RCC Slab Culvert

3.31

-

-

... More
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete

-

-

-

... More
RCC Slab Culvert

0.3

-

-

... More
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items

-

-

-

... More
Below Sill RCC Slab Culvert

151.32

-

-

... More
Slab centerin Deck slab side RCC Slab Culvert

12.13

-

-

... More
Supply and fixing of weep holes using 90mm PVC Pipes including cost of all site etc.,

-

-

-

... More
RCC Slab Culvert

15

-

-

... More
Supply and fixing of 20mm thk compressible fiber board in expansion joints complete as per drawing including cost of all site etc

-

-

-

... More
RCC Slab Culvert

3.15

-

-

... More
Supply and Fixing of Name Board

1

-

-

... More
Supply and Fixing of Sign Board

2

-

-

... More
Supply and Fixing of HM Stone

2

-

-

... More
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)

-

-

-

... More
For 1st year maintenance

1

-

-

... More
For 2nd year maintenance

1

-

-

... More
For 3rd year maintenance

1

-

-

... More
For 4th year maintenance

1

-

-

... More
For 5th year maintenance

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.