Pradhan Mantri Gram Sadak Yojana Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Civil And Construction
Eprocure
Opening Date15 May 2024
Closing Date16 Jul 2024
Tender Amount₹ 3,34,61,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

-

-

-

... More
in Km. 0/0 - 4/975

6195.1

-

-

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3

-

-

-

... More
in Km. 0/0 - 1/0

101.25

-

-

... More
in Km. 1/0 - 2/0

101.25

-

-

... More
in Km. 2/0 - 3/0

101.25

-

-

... More
in Km. 3/0 - 4/0

101.25

-

-

... More
in Km. 4/0 - 4/975

98.72

-

-

... More
Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth)

-

-

-

... More
in Km. 0/0 - 1/0

101.25

-

-

... More
in Km. 1/0 - 2/0

101.25

-

-

... More
in Km. 2/0 - 3/0

101.25

-

-

... More
in Km. 3/0 - 4/0

101.25

-

-

... More
in Km. 4/0 - 4/975

98.72

-

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (carted earth)

-

-

-

... More
in Km. 0/0 - 1/0

1026.31

-

-

... More
in Km. 1/0 - 2/0

991.68

-

-

... More
in Km. 2/0 - 3/0

999.54

-

-

... More
in Km. 3/0 - 4/0

974.76

-

-

... More
in Km. 4/0 - 4/975

956.73

-

-

... More
Construction of embankment using tractor with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)

-

-

-

... More
KM 0/0 - 1/0

336.52

-

-

... More
KM 1/0 - 2/0

335.54

-

-

... More
'KM 2/0 - 3/0

336.52

-

-

... More
'KM 3/0 - 4/0

335.03

-

-

... More
KM 4/0 - 4/975

329.06

-

-

... More
Providing layer spreading and compacting graded stone aggregate to wet mix macadam specifaction inculding premixing the material with water at OMC in mechanical mixer Pug mill carring of mixed material by tipper to site, laying in uniform layers in sub base/base course on a well prepared sub -base and compacting with smooth wheel roller of 80 to 100 KN weight to achieve the desired density inculding lighting.

-

-

-

... More
km 0/0 - 1/0

564.81

-

-

... More
KM 1/0 - 2/0

568.28

-

-

... More
KM 2/0-3/0

560.87

-

-

... More
KM 3/0-4/0

566.28

-

-

... More
KM 4/0-4/975

552.37

-

-

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

-

-

-

... More
km 0/0 - 1/0

3765.37

-

-

... More
KM 1/0 - 2/0

3788.48

-

-

... More
KM 2/0-3/0

3739.12

-

-

... More
KM 3/0-4/0

3775.19

-

-

... More
KM 4/0-4/975

3682.5

-

-

... More
Providing and applying Tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.

-

-

-

... More
km 0/0 - 1/0

3776.25

-

-

... More
KM 1/0 - 2/0

3810.24

-

-

... More
KM 2/0-3/0

3750

-

-

... More
KM 3/0-4/0

3802.57

-

-

... More
KM 4/0-4/975

3682.5

-

-

... More
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Using Waste Plastic 6%)

-

-

-

... More
km 0/0 - 1/0

188.28

-

-

... More
KM 1/0 - 2/0

189.44

-

-

... More
KM 2/0-3/0

186.96

-

-

... More
KM 3/0-4/0

188.76

-

-

... More
KM 4/0-4/975

184.13

-

-

... More
PBituminous concrete:- Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects

-

-

-

... More
km 0/0 - 1/0

112.96

-

-

... More
KM 1/0 - 2/0

113.65

-

-

... More
KM 2/0-3/0

112.17

-

-

... More
KM 3/0-4/0

113.25

-

-

... More
KM 4/0-4/975

110.47

-

-

... More
Provision of 15 nos rumble strips with covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre to centre approved locations to control speed, marked with w hile strips of road making paint.

-

-

-

... More
KM 0/0 - 1/0

5.62

-

-

... More
KM 1/0 - 2/0

5.62

-

-

... More
'KM 2/0 - 3/0

5.62

-

-

... More
'KM 3/0 - 4/0

5.62

-

-

... More
KM 4/0 - 4/975

5.62

-

-

... More
Road Marking With Hot Applied Thermoplastic Compound With reflectorising Glass Beads on Bituminous Surface:- Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35, The finished surface to be level uniform and free from streaks and holes etc complete as per MORTH&H specification No.803

-

-

-

... More
KM 0/0 - 1/0

200

-

-

... More
KM 1/0 - 2/0

200

-

-

... More
'KM 2/0 - 3/0

200

-

-

... More
'KM 3/0 - 4/0

200

-

-

... More
KM 4/0 - 4/975

195

-

-

... More
Providing and fixing Name board

1

-

-

... More
Providing and Fixing 'Logo' of PMGSY Project

4

-

-

... More
Providing and Fixing 'Citizen information Board' of PMGSY Project

1

-

-

... More
Providing and Fixing 'Maintenance information Board' of PMGSY Project

1

-

-

... More
Providing and fixing of Retro Reflectorised Cautionary , Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5mm thick Aluminium Sheet fixed on back support Frame of 25mm x 25mm x 3mm Mild steel angle Iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M15 Grade cement concrete 45cm x 45cm x 60cm below Ground level etc complete including 7 Years warrenty for the Retro Reflective Sheeting as per Clause 6.9 of IRC 67 - 2010 Specification ( as per MORTH & Speccification no : 801 )

-

-

-

... More
90CM Equilateral Trainagle (Cautinary) Sign Board

4

-

-

... More
60CM Circular (Mandatory) Sign Board

20

-

-

... More
Chevron Signs 90Cm Octagon (Curves)

8

-

-

... More
Reflector

24

-

-

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703

-

-

-

... More
(i) Ordinary Kilometer Stone (Precast)

4

-

-

... More
(ii) 200 m stone (precast)

20

-

-

... More
(iii) Guard stone

50

-

-

... More
1.A)Construction of Culvert @ Km 0/0-1/0

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Ch 0/935

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Ch 0/935

17.87

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Ch 0/935

7.5

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Ch 0/935

90.3

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Ch 0/935

10.32

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Ch 0/935

10.32

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing

-

-

-

... More
Ch 0/935

50.64

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall

-

-

-

... More
Ch 0/935

27.76

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft Paper

-

-

-

... More
Ch 0/935

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
Ch 0/935

0.35

-

-

... More
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification

-

-

-

... More
Ch 0/935

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
Ch 0/935

4.5

-

-

... More
Providing Weepholes in brick masonary, Plain/Reinforced Concrete abutment, wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face coplete as per drawing and technical specification Clauses 614, 709, 1204 3.7

-

-

-

... More
Ch 0/935

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
Ch 0/935

7.7

-

-

... More
1.B)Construction of Culvert @ Km 1/0-2/0

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Ch 1/070

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Ch 1/070

17.87

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Ch 1/070

7.5

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Ch 1/070

90.3

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Ch 1/070

10.32

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Ch 1/070

10.32

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing

-

-

-

... More
Ch 1/070

50.64

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall

-

-

-

... More
Ch 1/070

27.76

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft Paper

-

-

-

... More
Ch 1/070

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
Ch 1/070

0.35

-

-

... More
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification

-

-

-

... More
Ch 1/070

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
Ch 1/070

4.5

-

-

... More
Providing Weepholes in brick masonary, Plain/Reinforced Concrete abutment, wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face coplete as per drawing and technical specification Clauses 614, 709, 1204 3.7

-

-

-

... More
Ch 1/070

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
Ch 1/070

7.7

-

-

... More
1.C)Construction of Culvert @ Km 3/0-4/0

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Ch 3/250

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Ch 3/250

17.87

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Ch 3/250

7.5

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Ch 3/250

90.3

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Ch 3/250

10.32

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Ch 3/250

10.32

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing

-

-

-

... More
Ch 3/250

50.64

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall

-

-

-

... More
Ch 3/250

27.76

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft Paper

-

-

-

... More
Ch 3/250

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
Ch 3/250

0.35

-

-

... More
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification

-

-

-

... More
Ch 3/250

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
Ch 3/250

4.5

-

-

... More
Providing Weepholes in brick masonary, Plain/Reinforced Concrete abutment, wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face coplete as per drawing and technical specification Clauses 614, 709, 1204 3.7

-

-

-

... More
Ch 3/250

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
Ch 3/250

7.7

-

-

... More
1.D)Construction of Culvert @ Km 4/0-5/0

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Ch 4/210

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Ch 4/210

17.87

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Ch 4/210

7.5

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Ch 4/210

90.3

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Ch 4/210

10.32

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Ch 4/210

10.32

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing

-

-

-

... More
Ch 4/210

50.64

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall

-

-

-

... More
Ch 4/210

27.76

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft Paper

-

-

-

... More
Ch 4/210

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
Ch 4/210

0.35

-

-

... More
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification

-

-

-

... More
Ch 4/210

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
Ch 4/210

4.5

-

-

... More
Providing Weepholes in brick masonary, Plain/Reinforced Concrete abutment, wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face coplete as per drawing and technical specification Clauses 614, 709, 1204 3.7

-

-

-

... More
Ch 4/210

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
Ch 4/210

7.7

-

-

... More
1.E)Construction of Protective Wall Km 0/0 to 1/0

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Ch. Km : 0/355 - 0/385

33.75

-

-

... More
Ch. Km : 0/625 - 0/640

16.88

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Ch. Km : 0/355 - 0/385

6.75

-

-

... More
Ch. Km : 0/625 - 0/640

3.38

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Ch. Km : 0/355 - 0/385

9

-

-

... More
Ch. Km : 0/625 - 0/640

4.5

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing

-

-

-

... More
Ch. Km : 0/355 - 0/385

16.2

-

-

... More
Ch. Km : 0/625 - 0/640

8.1

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall

-

-

-

... More
Ch. Km : 0/355 - 0/385

34.43

-

-

... More
Ch. Km : 0/625 - 0/640

17.22

-

-

... More
Providing Weepholes in brick masonary, Plain/Reinforced Concrete abutment, wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face coplete as per drawing and technical specification Clauses 614, 709, 1204 3.7

-

-

-

... More
Ch. Km : 0/355 - 0/385

60

-

-

... More
Ch. Km : 0/625 - 0/640

30

-

-

... More
1.F)Construction of Protective Wall Km 1/0 to 2/0

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Ch. Km : 1/130 - 1/160

33.75

-

-

... More
Ch. Km : 1/750 - 1/765

16.88

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Ch. Km : 1/130 - 1/160

6.75

-

-

... More
Ch. Km : 1/750 - 1/765

3.38

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Ch. Km : 1/130 - 1/160

9

-

-

... More
Ch. Km : 1/750 - 1/765

4.5

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing

-

-

-

... More
Ch. Km : 1/130 - 1/160

16.2

-

-

... More
Ch. Km : 1/750 - 1/765

8.1

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall

-

-

-

... More
Ch. Km : 1/130 - 1/160

34.43

-

-

... More
Ch. Km : 1/750 - 1/765

17.22

-

-

... More
Providing Weepholes in brick masonary, Plain/Reinforced Concrete abutment, wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face coplete as per drawing and technical specification Clauses 614, 709, 1204 3.7

-

-

-

... More
Ch. Km : 1/130 - 1/160

60

-

-

... More
Ch. Km : 1/750 - 1/765

30

-

-

... More
1.G)Construction of Protective Wall Km 4/0 to 5/0

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Ch. Km : 4/225 - 4/250

28.13

-

-

... More
Ch. Km : 4/460 - 4/490

33.75

-

-

... More
Ch. Km : 4/670 - 4/690

22.5

-

-

... More
Ch. Km : 4/940 - 4/960

22.5

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Ch. Km : 4/225 - 4/250

5.63

-

-

... More
Ch. Km : 4/460 - 4/490

6.75

-

-

... More
Ch. Km : 4/670 - 4/690

4.5

-

-

... More
Ch. Km : 4/940 - 4/960

4.5

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Ch. Km : 4/225 - 4/250

7.5

-

-

... More
Ch. Km : 4/460 - 4/490

9

-

-

... More
Ch. Km : 4/670 - 4/690

6

-

-

... More
Ch. Km : 4/940 - 4/960

6

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing

-

-

-

... More
Ch. Km : 4/225 - 4/250

13.5

-

-

... More
Ch. Km : 4/460 - 4/490

16.2

-

-

... More
Ch. Km : 4/670 - 4/690

10.8

-

-

... More
Ch. Km : 4/940 - 4/960

10.8

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall

-

-

-

... More
Ch. Km : 4/225 - 4/250

28.55

-

-

... More
Ch. Km : 4/460 - 4/490

34.43

-

-

... More
Ch. Km : 4/670 - 4/690

23.09

-

-

... More
Ch. Km : 4/940 - 4/960

23.09

-

-

... More
Providing Weepholes in brick masonary, Plain/Reinforced Concrete abutment, wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face coplete as per drawing and technical specification Clauses 614, 709, 1204 3.7

-

-

-

... More
Ch. Km : 4/225 - 4/250

50

-

-

... More
Ch. Km : 4/460 - 4/490

60

-

-

... More
Ch. Km : 4/670 - 4/690

40

-

-

... More
Ch. Km : 4/940 - 4/960

40

-

-

... More
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2

-

-

-

... More
For 1st Year

4.98

-

-

... More
For 2nd Year

4.98

-

-

... More
For 3rd Year

4.98

-

-

... More
For 4th Year

4.98

-

-

... More
For 5th Year

4.98

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.