Pradhan Mantri Gram Sadak Yojana Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Eprocure
Opening Date23 Jun 2020
Closing Date2 Jul 2020
Tender Amount₹ 76,75,530 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A

-

-

-

... More
Km 0/0 -5/3

2739.84

-

-

... More
Providing and Laying Red Gravel for soling & for side berms to 100 mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.

-

-

-

... More
Km 0/0 - 1/0

112.5

-

-

... More
Km 1/0 - 2/0

88.04

-

-

... More
Km 2/0-3/0

112.5

-

-

... More
Km 3/0-4/0

112.5

-

-

... More
Km 4/0-5/0

111.84

-

-

... More
Km 5/0-5/3

33.42

-

-

... More
Providing Advance BT patches using 45 mm IRC metal premixed with 44 Kg of bitumen including removal of failed material, trimming the sides to vertical and leveling the bottom, cleaning the same with compressed air or any appropriate method, filled with 50mm thick BM, after applying bitumen emulsion tack coat at the bottom and sides as per technical specifications clause 502, 503 and 504.

-

-

-

... More
Km 0/0 - 1/0

17.26

-

-

... More
Km 1/0 - 2/0

12.76

-

-

... More
Km 2/0-3/0

16.77

-

-

... More
Km 3/0-4/0

15.8

-

-

... More
Km 4/0-5/0

16.57

-

-

... More
Km 5/0-5/3

4.99

-

-

... More
Providing and laying tack coat over the BT surface using 3.00 Kg of Emulsion bitumen for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.

-

-

-

... More
Km 0/0 - 5/3

19026.74

-

-

... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.

-

-

-

... More
Km 0/0 - 1/0

3750

-

-

... More
Km 1/0 - 2/0

2934.75

-

-

... More
Km 2/0-3/0

3750

-

-

... More
Km 3/0-4/0

3750

-

-

... More
Km 4/0-5/0

3727.87

-

-

... More
Km 5/0-5/3

1114.12

-

-

... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510

-

-

-

... More
Km 0/0 - 1/0

3750

-

-

... More
Km 1/0 - 2/0

2934.75

-

-

... More
Km 2/0-3/0

3750

-

-

... More
Km 3/0-4/0

3750

-

-

... More
Km 4/0-5/0

3727.87

-

-

... More
Km 5/0-5/3

1114.12

-

-

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing etc., as per drawing and Technical specification clause 1703 Ordinary Kilometer Stone (Precast)

5

-

-

... More
Reinforced cement concrete M15 grade Hectametre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing etc., as per drawing and Technical specification clause 1703 Ordinary Hectameter Stone (Precast) 200m stone (precast)

21

-

-

... More
Routine Maintenance after completion of work

-

-

-

... More
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.

-

-

-

... More
For the second six months from the date of completion of work

1

-

-

... More
For the second year from the date of completion of work

1

-

-

... More
For the third year from the date of completion of work

1

-

-

... More
For the fourth year from the date of completion of work

1

-

-

... More
For the fifth year from the date of completion of work

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.