Pradhan Mantri Gram Sadak Yojana Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date18 May 2024
Closing Date2 Aug 2024
Tender Amount₹ 2,21,63,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

-

-

-

... More
Km. 1/0 - 3/30

3778.25

-

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)

-

-

-

... More
in Km. 1/0 - 3/30

5984.39

-

-

... More
Construction of embankment using tractor with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)

-

-

-

... More
KM 0/0 - 1/0

560.87

-

-

... More
KM 1/0 - 2/0

559.24

-

-

... More
KM 2/0 - 3/0

557.61

-

-

... More
KM 3/0 - 3/3

168.75

-

-

... More
Providing layer spreading and compacting graded stone aggregate to wet mix macadam specifaction inculding premixing the material with water at OMC in mechanical mixer Pug mill carring of mixed material by tipper to site, laying in uniform layers in sub base/base course on a well prepared sub -base and compacting with smooth wheel roller of 80 to 100 KN weight to achieve the desired density inculding lighting.

-

-

-

... More
KM 0/0 - 1/0

563.83

-

-

... More
KM 1/0 - 2/0

529.74

-

-

... More
KM 2/0 - 3/0

465.2

-

-

... More
KM 3/0 - 3/3

173.7

-

-

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

-

-

-

... More
KM 0/0 - 1/0

3758.84

-

-

... More
KM 1/0 - 2/0

3531.58

-

-

... More
KM 2/0 - 3/0

3112.19

-

-

... More
KM 3/0 - 3/3

1158

-

-

... More
Providing and applying Tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.

-

-

-

... More
KM 0/0 - 1/0

3769.72

-

-

... More
KM 1/0 - 2/0

3553.34

-

-

... More
KM 2/0 - 3/0

3133.95

-

-

... More
KM 3/0 - 3/3

1158

-

-

... More
Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 Mix Seal Surfacing (Waste plastic)

-

-

-

... More
KM 0/0 - 1/0

3769.72

-

-

... More
KM 1/0 - 2/0

3553.34

-

-

... More
KM 2/0 - 3/0

3133.95

-

-

... More
KM 3/0 - 3/3

1158

-

-

... More
Provision of 15 nos rumble strips with covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre to centre approved locations to control speed, marked with w hile strips of road making paint.

-

-

-

... More
KM 0/0 - 1/0

5.62

-

-

... More
KM 1/0 - 2/0

5.62

-

-

... More
KM 2/0 - 3/0

5.62

-

-

... More
KM 3/0 - 3/3

2.81

-

-

... More
Road Marking With Hot Applied Thermoplastic Compound With reflectorising Glass Beads on Bituminous Surface:- Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35, The finished surface to be level uniform and free from streaks and holes etc complete as per MORTH&H specification No.803

-

-

-

... More
KM 1/0 - 3/30

660

-

-

... More
Providing and fixing Name board

1

-

-

... More
Providing and Fixing 'Logo' of PMGSY Project

3

-

-

... More
Providing and Fixing 'Citizen information Board' of PMGSY Project

1

-

-

... More
Providing and Fixing 'Maintenance information Board' of PMGSY Project

1

-

-

... More
Providing and fixing of Retro Reflectorised Cautionary , Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5mm thick Aluminium Sheet fixed on back support Frame of 25mm x 25mm x 3mm Mild steel angle Iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M15 Grade cement concrete 45cm x 45cm x 60cm below Ground level etc complete including 7 Years warrenty for the Retro Reflective Sheeting as per Clause 6.9 of IRC 67 - 2010 Specification ( as per MORTH & Speccification no : 801 )

-

-

-

... More
90CM Equilateral Trainagle (Cautinary) Sign Board

10

-

-

... More
Chevron Signs 90Cm Octagon (Curves)

2

-

-

... More
Reflector

10

-

-

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703

-

-

-

... More
(i) Ordinary Kilometer Stone (Precast)

3

-

-

... More
(ii) 200 m stone (precast)

13

-

-

... More
1.A)Construction of Retaining Wall Km 2/0-3/0

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Ch. Km : 2800-2830,2860-2920 & 2990-3000m

83.24

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Ch. Km : 2800-2830,2860-2920 & 2990-3000m

13.44

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using M15 Grade HBG metal , including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.for foundation

-

-

-

... More
Ch. Km : 2800-2830,2860-2920 & 2990-3000m

20.16

-

-

... More
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Below Sill Level)

-

-

-

... More
Ch. Km : 2800-2830,2860-2920 & 2990-3000m

53.28

-

-

... More
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Above Sill Level)

-

-

-

... More
Ch. Km : 2800-2830,2860-2920 & 2990-3000m

172.47

-

-

... More
Providing Weepholes in brick masonary, Plain/Reinforced Concrete abutment, wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face coplete as per drawing and technical specification Clauses 614, 709, 1204 3.7

-

-

-

... More
Ch. Km : 2800-2830,2860-2920 & 2990-3000m

120

-

-

... More
1.B)Construction of Retaining Wall Km 3/0-3/30

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Ch. Km : 3000-3180

105.3

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Ch. Km : 3000-3180

20.25

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using M15 Grade HBG metal , including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.for foundation

-

-

-

... More
Ch. Km : 3000-3180

26.33

-

-

... More
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Below Sill Level)

-

-

-

... More
Ch. Km : 3000-3180

66.83

-

-

... More
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Above Sill Level)

-

-

-

... More
Ch. Km : 3000-3180

136.69

-

-

... More
Providing Weepholes in brick masonary, Plain/Reinforced Concrete abutment, wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face coplete as per drawing and technical specification Clauses 614, 709, 1204 3.7

-

-

-

... More
Ch. Km : 3000-3180

203

-

-

... More
1.C)Construction of 1.50m Span RCC Culvert @ Ch 1930m

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Ch. Km : 1930

83.13

-

-

... More
Providing and laying Concrete for Plain / Reinforced Concrete in Open foundations complete as per drawings and MORD technical specification Clauses 802,803,1202 & 1203 M 15 (1:2.5:5)

-

-

-

... More
Ch. Km : 1930

8.04

-

-

... More
Providing and laying Concrete for Plain / Reinforced Concrete in Open foundations complete as per drawings and MORD technical specification Clauses 802,803,1202 & 1203 M 20 ( 1:2:4)

-

-

-

... More
Ch. Km : 1930

56.24

-

-

... More
Providing and laying Concrete for Plain / Reinforced Concrete in Open foundations complete as per drawings and MORD technical specification Clauses 802,803,1202 & 1203 M 20 ( 1:2:4) Above Sill

-

-

-

... More
Ch. Km : 1930

35.55

-

-

... More
Supplying, Fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and MORD technical specification Clauses 1002, 1010 and 1202

-

-

-

... More
Ch. Km : 1930

0.35

-

-

... More
Providing and laying Concrete for Reinforced Concrete in Super structure complete as per drawings and MORD technical specification Clauses 800,1205.4 & 1205.5 (RCC M25)

-

-

-

... More
Ch. Km : 1930

3.31

-

-

... More
Providing Weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V): 2(H) towards drawing face complete as per drawing and technical specification.

-

-

-

... More
Ch. Km : 1930

12

-

-

... More
Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per draeing and technical specifications

-

-

-

... More
Ch. Km : 1930

15

-

-

... More
Providing and fixing Tar Paper for Bearing between Bed block & deck slab

-

-

-

... More
Ch. Km : 1930

4.5

-

-

... More
Backfilling behaind abutment, wing wall and return wall complete as per drawings & MORD technical specification clause 1204.3.8

-

-

-

... More
Ch. Km : 1930

7.24

-

-

... More
1.D)Construction of 1.50m Span RCC Culvert @ Ch 2050m

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Ch. Km : 2050

18.66

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Ch. Km : 2050

83.13

-

-

... More
Providing and laying Concrete for Plain / Reinforced Concrete in Open foundations complete as per drawings and MORD technical specification Clauses 802,803,1202 & 1203 M 15 (1:2.5:5)

-

-

-

... More
Ch. Km : 2050

8.04

-

-

... More
Providing and laying Concrete for Plain / Reinforced Concrete in Open foundations complete as per drawings and MORD technical specification Clauses 802,803,1202 & 1203 M 20 ( 1:2:4)

-

-

-

... More
Ch. Km : 2050

56.24

-

-

... More
Providing and laying Concrete for Plain / Reinforced Concrete in Open foundations complete as per drawings and MORD technical specification Clauses 802,803,1202 & 1203 M 20 ( 1:2:4) Above Sill

-

-

-

... More
Ch. Km : 2050

35.55

-

-

... More
Supplying, Fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and MORD technical specification Clauses 1002, 1010 and 1202

-

-

-

... More
Ch. Km : 2050

0.35

-

-

... More
Providing and laying Concrete for Reinforced Concrete in Super structure complete as per drawings and MORD technical specification Clauses 800,1205.4 & 1205.5 (RCC M25)

-

-

-

... More
Ch. Km : 2050

3.31

-

-

... More
Providing Weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V): 2(H) towards drawing face complete as per drawing and technical specification.

-

-

-

... More
Ch. Km : 2050

12

-

-

... More
Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per draeing and technical specifications

-

-

-

... More
Ch. Km : 1930

15

-

-

... More
Providing and fixing Tar Paper for Bearing between Bed block & deck slab

-

-

-

... More
Ch. Km : 2050

4.5

-

-

... More
Backfilling behaind abutment, wing wall and return wall complete as per drawings & MORD technical specification clause 1204.3.8

-

-

-

... More
Ch. Km : 2050

7.24

-

-

... More
1.E)Construction of 1.50m Span RCC Culvert @ Ch 2690m

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Ch. Km : 2690

18.66

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Ch. Km : 2690

83.13

-

-

... More
Providing and laying Concrete for Plain / Reinforced Concrete in Open foundations complete as per drawings and MORD technical specification Clauses 802,803,1202 & 1203 M 15 (1:2.5:5)

-

-

-

... More
Ch. Km : 2690

8.04

-

-

... More
Providing and laying Concrete for Plain / Reinforced Concrete in Open foundations complete as per drawings and MORD technical specification Clauses 802,803,1202 & 1203 M 20 ( 1:2:4)

-

-

-

... More
Ch. Km : 2690

56.24

-

-

... More
Providing and laying Concrete for Plain / Reinforced Concrete in Open foundations complete as per drawings and MORD technical specification Clauses 802,803,1202 & 1203 M 20 ( 1:2:4) Above Sill

-

-

-

... More
Ch. Km : 2690

35.55

-

-

... More
Supplying, Fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and MORD technical specification Clauses 1002, 1010 and 1202

-

-

-

... More
Ch. Km : 2690

0.35

-

-

... More
Providing and laying Concrete for Reinforced Concrete in Super structure complete as per drawings and MORD technical specification Clauses 800,1205.4 & 1205.5 (RCC M25)

-

-

-

... More
Ch. Km : 2690

3.31

-

-

... More
Providing Weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V): 2(H) towards drawing face complete as per drawing and technical specification.

-

-

-

... More
Ch. Km : 2690

12

-

-

... More
Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per draeing and technical specifications

-

-

-

... More
Ch. Km : 2690

15

-

-

... More
Providing and fixing Tar Paper for Bearing between Bed block & deck slab

-

-

-

... More
Ch. Km : 2690

4.5

-

-

... More
Backfilling behaind abutment, wing wall and return wall complete as per drawings & MORD technical specification clause 1204.3.8

-

-

-

... More
Ch. Km : 2690

7.24

-

-

... More
1.C)Construction Concrete Pavement Ch 1480-1550, 2020-2130, 2300-2380

-

-

-

... More
Providing and laying Dry Lean Concrete for Plain / Reinforced Concrete in Open foundations complete as per drawings and MORD technical specification Clauses 802,803,1202 & 1203 M 15 (1:2.5:5)

-

-

-

... More
Ch. Km : 2300-2380m

30

-

-

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501

-

-

-

... More
Ch. Km : 1480-1550

44.63

-

-

... More
Ch. Km : 2020-2130

70.13

-

-

... More
Ch. Km : 2300-2380m

51

-

-

... More
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2

-

-

-

... More
For 1st Year

3.3

-

-

... More
For 2nd Year

3.3

-

-

... More
For 3rd Year

3.3

-

-

... More
For 4th Year

3.3

-

-

... More
For 5th Year

3.3

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.