Pradhan Mantri Gram Sadak Yojana Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Civil And Construction
Road Construction
Eprocure
Opening Date20 May 2022
Closing Date30 May 2022
Tender Amount₹ 46,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Km 0/0 - 0/445

100.13

-

-

... More
Providing and laying 75mm compacted thick WBM Gr. III using 1 cum of 63mm to 11.20mm IRC metal and 0.24 cum Gravel for blindage for 10sqm. Of 75mm compacted thick including cost and conveyance of all materials from approved quarry to worksite and stacking to department gauge for pre-mesurement as directed by the department officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing has per MORD 405 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefore and all other incidental charges etc., complete for Bottom layer

-

-

-

... More
Km 0/0 - 1/00

225

-

-

... More
Km 1/0 - 1/700

157.5

-

-

... More
Providing and laying tack cost over the WBM surface using 4.00 Kg of bituminous emulsion for 10 sqm. Including cost of bitminous emulsion including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants emplyed etc., complete as per clause 503 of MQST specification

-

-

-

... More
Km 0/0 - 1/181

5100

-

-

... More
Providing and laying Premix Carpet with Seal Coat Type - A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 23.232 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8 - 10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire plant fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete.

-

-

-

... More
Km 0/0 - 1/00

3000

-

-

... More
Km 1/0 - 1/700

2100

-

-

... More
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction at Optimum mosture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc., comp for base-course and side berms.

-

-

-

... More
Km 0/0 - 1/00

45

-

-

... More
Km 1/0 - 1/700

31.5

-

-

... More
Provision for KM Stone

7

-

-

... More
Provision for HM Stone

1

-

-

... More
Provision for Name Board

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.