Pradhan Mantri Gram Sadak Yojana Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Pradhan Mantri Gram Sadak Yojana - PMGSY Tender
Civil And Construction
Road Construction
Eprocure
Opening Date21 Jun 2024
Closing Date9 Jul 2024
Tender Amount₹ 28,78,000
Costs
EMD
₹ 58,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Dharmapuri District - Maintenance Of The Road From L134 C.pudhur Road To Chikkanampatti Road Km.0/0-1/470 H/o.konangihalli In Package No.tn04/258
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_134870_1Bid Award Id
ViewTender No
Roc.No.1649/2024/R2 P-258Tender Authority
Pradhan Mantri Gram Sadak Yojana ViewPurchaser Address
-Website
http://http://omms.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Km.0/0-1/470
264.6
-
-
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
-
-
-
Km.0/0-1/0
120
-
-
Km.1/0-1/470
56.4
-
-
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25 mm using 13.20 mm IRC size HBG metal .
-
-
-
Km.0/0-1/0
3.54
-
-
Km.1/0-1/470
1.42
-
-
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 40mm IRC size HBG metal
-
-
-
Km.0/0-1/0
5.1
-
-
Km.1/0-1/470
2.75
-
-
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
-
-
-
Km.0/0-1/470
5543.75
-
-
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
-
-
-
Km.0/0-1/0
94.53
-
-
Km.1/0-1/470
44.06
-
-
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
294
-
-
Provision for HM Stones
6
-
-
Provision for KM Stones
1
-
-
Ex.Citizen Information board (Painting)
1
-
-
Ex.Logo board (Painting)
2
-
-
Ex.Name Board Painting
1
-
-
Ex.Maintanance Board Painting
1
-
-
Provision for 60m Equilateral Triangle Cautionary Sign Board
4
-
-
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)
-
-
-
For 1st year
1
-
-
For 2nd year
1
-
-
For 3rd Year
1
-
-
For 4th Year
1
-
-
For 5th Year
1
-
-
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements