Pradhan Mantri Gram Sadak Yojana Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Pradhan Mantri Gram Sadak Yojana - PMGSY Tender
Civil And Construction
Road Construction
Eprocure
Opening Date16 Jul 2022
Closing Date2 Aug 2022
Tender AmountRefer Documents
Costs
EMD
₹ 48,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
8 Nos Providing Cc Pavemets At Vennandur Block Of Namakkal District Under Agamt Ii 2021-2022 Package 93
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_RDTN_241558_93Bid Award Id
ViewTender No
4046/2021/a9Tender Authority
Pradhan Mantri Gram Sadak Yojana ViewPurchaser Address
-Website
http://http://omms.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 10cum
13.25
-
-
Plasteting with CM1:5mix to 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
38.4
-
-
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
33.98
-
-
Cement concrete 1:2:4 Using 20mm ISS H.G Metal including cost and conveyance of materials and labour charges etc complete.
28.8
-
-
Construction of Paver block pavement at Akkaraipatty Kudi street West street H/O Akkaraipatty
-
-
-
Earth work excavation and Depositing on Bank with in initial Lead and Lift in H.G Soil for foundation
8.64
-
-
Cement concrete 1:4:8 Using 40mm ISS H.G Metal including cost and conveyance of materials and labour charges etc complete.
4.32
-
-
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 10cum
9.94
-
-
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
25.49
-
-
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
25.49
-
-
Providing and Laying Paver Block of 60mm thick approved design made out of 12mm and 6mm HBGS chips in M30 mix properly cured to attain the required strength, Laying and interlocking block and well compacted using 1-3 ton capacity compressor, the cost inclusive of all materials for manufacturing, interlocking block loading transportation to work site unloading and labour charges for fixing over Sand bed of 30mm thick & Joints filling using compressor of 1-3 ton capacity including hire and fuel charges for compressor and all other incidental charges etc complete.
254.88
-
-
Plasteting with CM1:5mix to 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
76.32
-
-
Providing CC pavement at Akkaraipatty Nadar street nadu theru H/O Akkaraipatty
-
-
-
Earth work excavation and Depositing on Bank with in initial Lead and Lift in H.G Soil for foundation
19.62
-
-
Cement concrete 1:4:8 Using 40mm ISS H.G Metal including cost and conveyance of materials and labour charges etc complete.
77.04
-
-
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 10cum
15.04
-
-
Cement concrete 1:2:4 Using 20mm ISS H.G Metal including cost and conveyance of materials and labour charges etc complete.
52.88
-
-
Supply and Erecting Centering for all R.C.C Works including cost and conveyance of materials and labour charges etc complete.
12.91
-
-
Plasteting with CM1:5mix to 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
15.04
-
-
Providing CC Pavement from Sowripalayam AR Street I st street H/O Matthiyampatty
-
-
-
Earth work excavation and Depositing on Bank with in initial Lead and Lift in H.G Soil for foundation
7.92
-
-
Cement concrete 1:4:8 Using 40mm ISS H.G Metal including cost and conveyance of materials and labour charges etc complete.
32.91
-
-
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 10cum
12.14
-
-
Plasteting with CM1:5mix to 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
73.04
-
-
Plasteting with CM1:4mix to 20 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
20.24
-
-
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
37.84
-
-
Cement concrete 1:2:4 Using 20mm ISS H.G Metal including cost and conveyance of materials and labour charges etc complete.
25.74
-
-
Providing CC Pavement from Sowripalayam Kallar street H/O Matthiyampatty
-
-
-
Earth work excavation and Depositing on Bank with in initial Lead and Lift in H.G Soil for foundation
13.68
-
-
Cement concrete 1:4:8 Using 40mm ISS H.G Metal including cost and conveyance of materials and labour charges etc complete.
44.46
-
-
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 10cum
15.73
-
-
Plasteting with CM1:5mix to 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
45.6
-
-
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
37.62
-
-
Cement concrete 1:2:4 Using 20mm ISS H.G Metal including cost and conveyance of materials and labour charges etc complete.
28.22
-
-
Providing Paver block from Aramathampalayam Mariyamman kovil street H/O Mattuvelampatty
-
-
-
Dismantling of PCC clearing away and carefully stacking materials useful for re-use for any thickness of walls
37.13
-
-
Earth work excavation and Depositing on Bank with in initial Lead and Lift in H.G Soil for foundation
3.3
-
-
Cement concrete 1:4:8 Using 40mm ISS H.G Metal including cost and conveyance of materials and labour charges etc complete.
1.65
-
-
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 10cum
3.8
-
-
Plasteting with CM1:5mix to 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
29.15
-
-
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
38.5
-
-
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .GSB Grading III
48.13
-
-
Providing and Laying Paver Block of 80mm thick approved design made out of 12mm and 6mm HBGS chips in M30 mix properly cured to attain the required strength, Laying and interlocking block and well compacted using 1-3 ton capacity compressor, the cost inclusive of all materials for manufacturing, interlocking block loading transportation to work site unloading and labour charges for fixing over Sand bed of 30mm thick & Joints filling using compressor of 1-3 ton capacity including hire and fuel charges for compressor and all other incidental charges etc complete.
385
-
-
Providing CC Pavement at Aramathampalayam New AR colony Nadu theru H/O Mattuvelampatti
-
-
-
Earth work excavation and Depositing on Bank with in initial Lead and Lift in H.G Soil for foundation
10.2
-
-
Cement concrete 1:4:8 Using 40mm ISS H.G Metal including cost and conveyance of materials and labour charges etc complete.
35.19
-
-
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 10cum
11.73
-
-
Plasteting with CM1:5mix to 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
34
-
-
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
30.09
-
-
Cement concrete 1:2:4 Using 20mm ISS H.G Metal including cost and conveyance of materials and labour charges etc complete.
25.5
-
-
Providing Paver block at Aramathampalayam Kudi street Main street H/O Mattuvelampatty
-
-
-
Earth work excavation and Depositing on Bank with in initial Lead and Lift in H.G Soil for foundation
9
-
-
Cement concrete 1:4:8 Using 40mm ISS H.G Metal including cost and conveyance of materials and labour charges etc complete.
3
-
-
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 10cum
6.9
-
-
Plasteting with CM1:5mix to 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
53
-
-
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
95.4
-
-
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .GSB Grading III
143.1
-
-
Providing and Laying Paver Block of 80mm thick approved design made out of 12mm and 6mm HBGS chips in M30 mix properly cured to attain the required strength, Laying and interlocking block and well compacted using 1-3 ton capacity compressor, the cost inclusive of all materials for manufacturing, interlocking block loading transportation to work site unloading and labour charges for fixing over Sand bed of 30mm thick & Joints filling using compressor of 1-3 ton capacity including hire and fuel charges for compressor and all other incidental charges etc complete.
954
-
-
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements