Pradhan Mantri Gram Sadak Yojana Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Civil And Construction
Irrigation Work
Eprocure
Opening Date20 Jul 2022
Closing Date17 Aug 2022
Tender Amount₹ 72,30,000 
Notes
Download

Costs

Summary

Dharmapuri District - Improvements Of Eri (desilting, Repairs To Sluice Weir) Works 5 Nos In Harur Block In Package No.tn 04- 28 / Agamt 2021-2022 Harur P28

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery - Channel having width up to 3.00 M

72

-

-

... More
Bathing Ghate

-

-

-

... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

17.56

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

9.46

-

-

... More
Supplying erecting of steel centring for cover slab and sides using steel shutters including all charges etc complete

39.92

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

16.03

-

-

... More
Construction of OUTLET

-

-

-

... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

15.84

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

11.88

-

-

... More
Supplying erecting of steel centring for cover slab and sides using steel shutters including all charges etc complete

46.2

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

10.4

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

4.95

-

-

... More
Construction of Lining wall in Baby pond and Lead Channel

-

-

-

... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

55.99

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

20.8

-

-

... More
Supplying erecting of steel centring for cover slab and sides using steel shutters including all charges etc complete

392.12

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

141.57

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

1.88

-

-

... More
Plastering with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.

32.09

-

-

... More
Name Board

1

-

-

... More
Name of the Work : Improvements to the Ammattan Kuttai ( Earthwork, Bathing Ghate, Outlet, Baby Pond protective wall). H/O Kongavembu

-

-

-

... More
Clearing the Scrub jungle and removed away from the site including all cutting charges and all other charges as per Std.Specification.

988.8

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete

930.72

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery - Channel having width up to 3.00 M

90

-

-

... More
Bathing Ghate

-

-

-

... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

12.65

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

6.71

-

-

... More
Supplying erecting of steel centring for cover slab and sides using steel shutters including all charges etc complete

30.16

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

10.73

-

-

... More
Construction of OUTLET

-

-

-

... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

9.77

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

3.47

-

-

... More
Supplying erecting of steel centring for cover slab and sides using steel shutters including all charges etc complete

45.77

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

12.49

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

0.45

-

-

... More
Plastering with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.

5.4

-

-

... More
Construction of Lining wall in Baby pond and Lead Channel

-

-

-

... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

69.13

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

23.07

-

-

... More
Supplying erecting of steel centring for cover slab and sides using steel shutters including all charges etc complete

371.62

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

130.43

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

3.18

-

-

... More
Plastering with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.

28.04

-

-

... More
Name Board

1

-

-

... More
Name of the Work : Improvements to Mellmuttu Kuttai (Deepening, Outlet, Protective wall, Baby Pond Protective wall) H/O Achalvadi

-

-

-

... More
Clearing the Scrub jungle and removed away from the site including all cutting charges and all other charges as per Std.Specification.

9372

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete

1988.24

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery - Channel having width up to 3.00 M

108

-

-

... More
Construction of OUTLET

-

-

-

... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

16.05

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

8.1

-

-

... More
Supplying erecting of steel centring for cover slab and sides using steel shutters including all charges etc complete

65.78

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

21.33

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

1.86

-

-

... More
Construction of Lining wall in Baby pond and Lead Channel

-

-

-

... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

89.08

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

33.18

-

-

... More
Supplying erecting of steel centring for cover slab and sides using steel shutters including all charges etc complete

238.88

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

66.72

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

20.25

-

-

... More
Plastering with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.

33.42

-

-

... More
Name Board

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.