Pradhan Mantri Gram Sadak Yojana Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Pradhan Mantri Gram Sadak Yojana - PMGSY Tender
Eprocure
Opening Date20 Jun 2020
Closing Date2 Jul 2020
Tender Amount₹ 1,01,42,800
Costs
EMD
₹ 2,03,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Dharmapuri District - Periodical Renewal Of Road 2 Nos In Packge No.tn04-184 In Harur Block P184
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_RDTN_94832_1Bid Award Id
ViewTender No
Roc.No.777/20/R2 Dt.17.06.2020 P184Tender Authority
Pradhan Mantri Gram Sadak Yojana ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and Laying Gravel to 100mm compacted thick including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achive the required proctor density at 100% compaction.
-
-
-
... More
Km. 0/0-1/0
117.25
-
-
... More
Km. 1/0-2/0
120
-
-
... More
Km. 2/0-2/81
96.5
-
-
... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25 mm using 13.20 mm IRC size HBG metal
-
-
-
... More
Km. 0/0-1/0
2.19
-
-
... More
Km. 1/0-2/0
1.29
-
-
... More
Km. 2/0-2/81
0.7
-
-
... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
-
-
-
... More
Km. 0/0-1/0
1.34
-
-
... More
Km. 1/0-2/0
1.43
-
-
... More
Km. 2/0-2/81
0.92
-
-
... More
Providing and laying TACK COAT over the WBM surface using 4.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
-
-
-
... More
Km. 0/0-2/81
10584.38
-
-
... More
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
-
-
-
... More
Km. 0/0-1/0
3796.88
-
-
... More
Km. 1/0-2/0
3750
-
-
... More
Km. 2/0-2/81
3037.5
-
-
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510
-
-
-
... More
Km. 0/0-1/0
3796.88
-
-
... More
Km. 1/0-2/0
3750
-
-
... More
Km. 2/0-2/81
3037.5
-
-
... More
Provision for KM Stones
2
-
-
... More
Provision for HM Stones
12
-
-
... More
Repairs to Name Board
1
-
-
... More
Repairs to Citizen Information Board
1
-
-
... More
Repairs to Logo Board
2
-
-
... More
Provision for Cautionary Sign Board
14
-
-
... More
Provision for Sign Board
1
-
-
... More
Periodical renewal of the road Naripalli road to Goraiyaru road Km.0/0-4/600
-
-
-
... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
5520
-
-
... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
1548
-
-
... More
Providing and Laying Gravel to 100mm compacted thick including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achive the required proctor density at 100% compaction.
-
-
-
... More
Km. 0/0-1/0
119.3
-
-
... More
Km. 1/0-2/0
119.3
-
-
... More
Km. 2/0-3/0
119.3
-
-
... More
Km. 3/0-4/0
115.7
-
-
... More
Km. 4/0-4/6
72
-
-
... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25 mm using 13.20 mm IRC size HBG metal
-
-
-
... More
Km. 0/0-1/0
0.53
-
-
... More
Km. 1/0-2/0
0.49
-
-
... More
Km. 2/0-3/0
0.47
-
-
... More
Km. 3/0-4/0
0.41
-
-
... More
Km. 4/0-4/6
0.3
-
-
... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
-
-
-
... More
Km. 0/0-1/0
0.46
-
-
... More
Km. 1/0-2/0
0.3
-
-
... More
Km. 2/0-3/0
0.36
-
-
... More
Km. 3/0-4/0
0.46
-
-
... More
Km. 4/0-4/6
0.84
-
-
... More
Providing and laying TACK COAT over the WBM surface using 4.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
-
-
-
... More
Km. 0/0-4/6
17281.25
-
-
... More
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
-
-
-
... More
Km. 0/0-1/0
3781.25
-
-
... More
Km. 1/0-2/0
3750
-
-
... More
Km. 2/0-3/0
3750
-
-
... More
Km. 3/0-4/0
3750
-
-
... More
Km. 4/0-4/6
2250
-
-
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510
-
-
-
... More
Km. 0/0-1/0
3781.25
-
-
... More
Km. 1/0-2/0
3750
-
-
... More
Km. 2/0-3/0
3750
-
-
... More
Km. 3/0-4/0
3750
-
-
... More
Km. 4/0-4/6
2250
-
-
... More
Provision for Km Stones
4
-
-
... More
Provision for HM Stones
19
-
-
... More
Repairs to Name Board
1
-
-
... More
Repairs to Citizen Information Board
1
-
-
... More
Repairs to Logo Board
2
-
-
... More
Repairs to Cautionary Sign Board
18
-
-
... More
Repairs to Maintenance Board
1
-
-
... More
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)
-
-
-
... More
For 1st year
1
-
-
... More
For 2nd year
1
-
-
... More
For 3rd Year
1
-
-
... More
For 4th Year
1
-
-
... More
For 5th Year
1
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-