Pradhan Mantri Gram Sadak Yojana Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Eprocure
Opening Date19 Sep 2018
Closing Date28 Sep 2018
Tender Amount₹ 1,19,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying 75mm compacted thick WBM Gr.II using 1 cum of 63mm to 11.2mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MoRT&H 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for top layer.

-

-

-

... More
Km 0/0-1/0

178.04

-

-

... More
Km 1/0-1/330

72.94

-

-

... More
Providing and laying 75mm compacted thick WBM Gr.III using 1 cum of 63mm to 11.2mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MoRT&H 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for top layer.

-

-

-

... More
Km 0/0-1/0

223.04

-

-

... More
Km 1/0-1/330

72.94

-

-

... More
Providing and laying tack coat over the WBM surface using 4.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MoRT&H specification.

-

-

-

... More
Km 0/0-1/330

3946.5

-

-

... More
Providing and laying open graded premix carpet of 20 mm compacted thick using 0.18cum of 13.20 mm IRC size HBG machine crushed chips and 0.09 cum of 11.20 mm IRC HBG machine crushed chips with 14.6 Kg of bitumen for 10 sqm of premix carpet including laying of seal coat type ‘A’ over the premix carpet using 0.09 cum of 6.7mm IRC size HBG machine crushed chips with 9.8 Kg of bitumen per 10 sqm including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling seperately as per MoRT&H specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant power roller 80 – 100 KN capacity and all other tools and plants employed therefore etc., complete.

-

-

-

... More
Km 0/0-1/0

2973.9

-

-

... More
Km 1/0-1/330

972.6

-

-

... More
Providing and laying gravel including cost and conveyance of gravel from approved sources to worksite and stocking on road side to departmental metric gauge for premeasurement as directed including labour for spreading and compacting etc., complete as per MORD specifications No. 400.

-

-

-

... More
Km 0/0-1/0

123.91

-

-

... More
Km 1/0-1/330

40.52

-

-

... More
Construction of Retaining Wall @ ch 0/490-0/537, 0/640-0/677, 0/847-0/883, 0/960-0/999

-

-

-

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting & depositing on bank with all leads and lifts as per SS20B,including cost of all labour, equipments and all incidental charges such as providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal,removal of all logs, bracing & and their subsequent and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc.,complete as per relevent standard specification for Pipe culvert

-

-

-

... More
Ch 0/490-0/537

61.05

-

-

... More
Ch 0/640-0/677

51.15

-

-

... More
Ch 0/847-0/883

44.55

-

-

... More
Ch 0/960-0/999

51.15

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Ch 0/490-0/537

5.55

-

-

... More
Ch 0/640-0/677

4.65

-

-

... More
Ch 0/847-0/883

4.05

-

-

... More
Ch 0/960-0/999

4.65

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

-

-

-

... More
Ch 0/490-0/537

5.55

-

-

... More
Ch 0/640-0/677

4.65

-

-

... More
Ch 0/847-0/883

4.05

-

-

... More
Ch 0/960-0/999

4.65

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.Below sill

-

-

-

... More
Ch 0/490-0/537

94.34

-

-

... More
Ch 0/640-0/677

79.03

-

-

... More
Ch 0/847-0/883

57.84

-

-

... More
Ch 0/960-0/999

79.03

-

-

... More
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. For shuttering.

-

-

-

... More
Ch 0/490-0/537

193.61

-

-

... More
Ch 0/640-0/677

162.17

-

-

... More
Ch 0/847-0/883

137.1

-

-

... More
Ch 0/960-0/999

162.17

-

-

... More
Construction of 1.50 m Slab Culvert @ Ch 0/372, 0/581, 0/847, 1/002, 1/215

-

-

-

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting & depositing on bank with all leads and lifts as per SS20B,including cost of all labour, equipments and all incidental charges such as providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal,removal of all logs, bracing & and their subsequent and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc.,complete as per relevent standard specification for Pipe culvert

-

-

-

... More
CH-0/372, 0/581, 0/847

283.71

-

-

... More
CH-1/002, 1/215

189.14

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm .Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
CH-0/372,0/581, 0/847

30.96

-

-

... More
CH-1/00, 1/215

20.64

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

-

-

-

... More
CH-0/372, 0/581, 0/847

30.96

-

-

... More
CH-1/002, 1/215

20.64

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. Below Sill

-

-

-

... More
CH-0/372, 0/581, 0/847

236.49

-

-

... More
CH-1/002, 1/215

157.66

-

-

... More
Cement concrete 1:2:4 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. Above Sill

-

-

-

... More
CH-0/372, 0/581, 0/847

10.08

-

-

... More
CH-1/002, 1/215

6.72

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
CH-0/372, 0/581, 0/847

9.93

-

-

... More
CH-1/002, 1/215

6.62

-

-

... More
Supply and fabrication of Fe 415 & Fe240 steel required for all RCC items of works involved in the schedule including cost of steel at site including cost of fabrication, labour charges for cleaning the rods strengthening, cutting bending,tying grills, including overlaping to the required length wherever necessary and placing the the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars cover blocks and all other incidental charges etc complete including suitable anticorrosive treatment.

-

-

-

... More
CH-0/372, 0/581, 0/847

0.89

-

-

... More
CH-1/002, 1/215

0.6

-

-

... More
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. For shuttering.

-

-

-

... More
CH-0/372, 0/581, 0/847

460.02

-

-

... More
CH-1/002, 1/215

306.68

-

-

... More
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. For Centering

-

-

-

... More
CH-0/372, 0/581, 0/847

75.99

-

-

... More
CH-1/002, 1/215

50.66

-

-

... More
Gravel filling between body wall including cost and conveyance of Gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
CH-0/372, 0/581, 0/847

46.23

-

-

... More
CH-1/002, 1/215

30.82

-

-

... More
Provision Bituimen Pad etc, Complete

-

-

-

... More
CH-0/372, 0/581, 0/847

45

-

-

... More
CH-1/002, 1/215

30

-

-

... More
Provision Weepholes Pad etc, Complete

-

-

-

... More
CH-0/372, 0/581, 0/847

36

-

-

... More
CH-1/002, 1/215

24

-

-

... More
Provision For KM Stone etc,Complte

1

-

-

... More
Provision For HM Stone etc,Complte

6

-

-

... More
Provision For Sign Board etc,Complte

3

-

-

... More
Provision For Name Board etc,Complte

1

-

-

... More
02. Strenthening of Madapuram to manmalai road km 0/0-1/112 Madapuram Pt.

-

-

-

... More
Providing and laying 75mm compacted thick WBM Gr.II using 1 cum of 63mm to 11.2mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MoRT&H 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for top layer.

-

-

-

... More
Km 0/0-1/0

204.75

-

-

... More
Km 1/0-1/112

17.33

-

-

... More
Providing and laying 75mm compacted thick WBM Gr.III using 1 cum of 63mm to 11.2mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MoRT&H 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for top layer.

-

-

-

... More
Km 0/0-1/0

204.75

-

-

... More
Km 1/0-1/112

17.33

-

-

... More
Providing and laying tack coat over the WBM surface using 4.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MoRT&H specification.

-

-

-

... More
Km 0/0-1/112

2961

-

-

... More
Providing and laying open graded premix carpet of 20 mm compacted thick using 0.18cum of 13.20 mm IRC size HBG machine crushed chips and 0.09 cum of 11.20 mm IRC HBG machine crushed chips with 14.6 Kg of bitumen for 10 sqm of premix carpet including laying of seal coat type ‘A’ over the premix carpet using 0.09 cum of 6.7mm IRC size HBG machine crushed chips with 9.8 Kg of bitumen per 10 sqm including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling seperately as per MoRT&H specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant power roller 80 – 100 KN capacity and all other tools and plants employed therefore etc., complete.

-

-

-

... More
Km 0/0-1/0

2730

-

-

... More
Km 1/0-1/112

231

-

-

... More
Providing and laying gravel including cost and conveyance of gravel from approved sources to worksite and stocking on road side to departmental metric gauge for premeasurement as directed including labour for spreading and compacting etc., complete as per MORD specifications No. 400.

-

-

-

... More
Km 0/0-1/0

36.4

-

-

... More
Km 1/0-1/112

3.08

-

-

... More
Provision For KM Stone etc,Complte

1

-

-

... More
Provision For HM Stone etc,Complte

4

-

-

... More
Provision For Sign Board etc,Complte

3

-

-

... More
Provision For Name Board etc,Complte

1

-

-

... More
03. Strenthening of Sankaranpandal of Keela uthirangudi km 0/0-0/880 Sankaranpandal Pt.

-

-

-

... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.

158.4

-

-

... More
Picking the existing BT Surface 50 to 100mm deep and cearing away the materials not fit for the use and including all labour charges etc.

1089

-

-

... More
Providing and laying 75mm compacted thick WBM Gr.III using 1 cum of 63mm to 11.2mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MoRT&H 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for top layer.

-

-

-

... More
Km 0/0-0/880

247.5

-

-

... More
Providing and laying tack coat over the WBM surface using 4.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MoRT&H specification.

-

-

-

... More
Km 0/0-0/880

3300

-

-

... More
Providing and laying open graded premix carpet of 20 mm compacted thick using 0.18cum of 13.20 mm IRC size HBG machine crushed chips and 0.09 cum of 11.20 mm IRC HBG machine crushed chips with 14.6 Kg of bitumen for 10 sqm of premix carpet including laying of seal coat type ‘A’ over the premix carpet using 0.09 cum of 6.7mm IRC size HBG machine crushed chips with 9.8 Kg of bitumen per 10 sqm including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling seperately as per MoRT&H specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant power roller 80 – 100 KN capacity and all other tools and plants employed therefore etc., complete.

-

-

-

... More
Km 0/0-0/880

3300

-

-

... More
Providing and laying gravel including cost and conveyance of gravel from approved sources to worksite and stocking on road side to departmental metric gauge for premeasurement as directed including labour for spreading and compacting etc., complete as per MORD specifications No. 400.

-

-

-

... More
Km 0/0-0/880

52.8

-

-

... More
Construction of Retaining Wall

-

-

-

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting & depositing on bank with all leads and lifts as per SS20B,including cost of all labour, equipments and all incidental charges such as providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal,removal of all logs, bracing & and their subsequent and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc.,complete as per relevent standard specification for Pipe culvert

57.6

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

11.52

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

7.68

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.Below sill

83.34

-

-

... More
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. For shuttering.

130.43

-

-

... More
Provision For HM Stone etc,Complte

4

-

-

... More
Provision For Sign Board etc,Complte

1

-

-

... More
Provision For Name Board etc,Complte

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.