Pradhan Mantri Gram Sadak Yojana Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Pradhan Mantri Gram Sadak Yojana - PMGSY Tender
Civil And Construction
Road Construction
Eprocure
Opening Date20 Jul 2023
Closing Date8 Aug 2023
Tender Amount₹ 50,36,000
Costs
EMD
₹ 1,01,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_RDTN_126614_2Bid Award Id
ViewTender No
Incentive/TNVPMTender Authority
Pradhan Mantri Gram Sadak Yojana ViewPurchaser Address
-Website
http://http://omms.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring complete etc.,
-
-
-
in KM 0/0 - 2/02
230
-
-
Laying US GRAVEL including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc. complete.
-
-
-
in KM 0/0 -1/0
21.09
-
-
in KM 0/0 - 2/020
23.91
-
-
Advance Patch work for making up the undulation in the existing BT surface to an average thickness of 50mm using 45mm IRC size HBG metal with 44 Kg of bitumen for 1 cum of metal mixed in hot mix plant laying at site
-
-
-
in KM 0/0 -1/0
30
-
-
in KM 0/0 -1/0
30.6
-
-
Providing and laying Tack coat over BT surface(treated with primer) using 3kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
-
-
-
in KM 0/0 -2/020
7200
-
-
BITUMINOUS CONCRETE 40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
in KM 0/0 -1/0
180
-
-
rovision of 15 nos of rumble strips covered with premix bituminous carpet, 15 - 20 mm high at centre, 250 mm wide placed at 1 m center-to-centre at approved locations to control speed, marked with white strips of road marking paint.
-
-
-
in KM 0/0 -2/020
18.75
-
-
Providing and Laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORTH specification No.803
-
-
-
in KM 0/0 -2/020
404
-
-
Cement concrete pavement Ch 850 - 950m
-
-
-
Supplying and errecting shuttering complying with standard including all labour charges etc. complete
-
-
-
Road side
40
-
-
Construction of un-reinforced dowel jointed at expansion and construction joint only plain cement concret pavement thickness as per design over preperes sub base with 43 grade cement or any other type as per clause 1501 M30 grade
-
-
-
Pavement
80
-
-
Provision for Name board charges
1
-
-
Provision for Photographic charges
1
-
-
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
-
-
-
For the First Year from the date of completion of work
2.02
-
-
For the Second Year from the date of cpmpletion of work
2.02
-
-
For the Third Year from the date of completion of work
2.02
-
-
For the Fourth Year from the date of completion of work
2.02
-
-
For the Fifth Year from the date of completion of work
2.02
-
-
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?