Pradhan Mantri Gram Sadak Yojana Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Pradhan Mantri Gram Sadak Yojana - PMGSY Tender
Civil And Construction
Road Construction
Eprocure
Opening Date25 Jan 2023
Closing Date20 Feb 2023
Tender Amount₹ 2,41,59,000
Costs
EMD
₹ 2,42,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_RDTN_283884_1Bid Award Id
ViewTender No
555/2021/A2/Dt 13.01.2023Tender Authority
Pradhan Mantri Gram Sadak Yojana ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete.
65.7
-
-
... More
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
65.7
-
-
... More
CC 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
153.3
-
-
... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
242.18
-
-
... More
Construction of Un- uniforced,dowl jointed at expansion and construction joint only, plain cement pavement,thickness as per desing,over a prepared sub base,with 43 grade cement or aby type as per 150 1.2.2 M30 (Grade) coarse an unit= cum
799
-
-
... More
Supply and erecting centring including cost and conveyance and all labour charge etc complete
1270.2
-
-
... More
Construction of Paver block road on both sides of Car srteets,Melasanathai & Keelasanathai, at Arulmigu Swedaranya Swami Temple in Thiruvengadu Panchayat
-
-
-
... More
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders as per SS20B, including all labour charges etc., complete for foundation.
118.4
-
-
... More
Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete.
39.47
-
-
... More
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
39.47
-
-
... More
CC 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
92.09
-
-
... More
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
418.2
-
-
... More
Supplying and laying of Interlocking Paver Block Stone 80 mm thk. Over a base layer of sand filling incl. Cost of materials laying and Labour charges etc.,
2788
-
-
... More
Supply and erecting centring including cost and conveyance and all labour charge etc complete
613.9
-
-
... More
Construction of CC Drainage near Pidariyamman koil & South car street Rathanallur Road near Arulmigu Swedaranya Swami Temple in Thiruvengadu Panchayat
-
-
-
... More
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders as per SS20B, including all labour charges etc., complete for foundation.
1311.12
-
-
... More
Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete.
120.69
-
-
... More
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
120.69
-
-
... More
CC 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
422.82
-
-
... More
Supply and erecting centring including cost and conveyance and all labour charge etc complete
1868.04
-
-
... More
Supply and fabrication of steel including cost and conveyance and all labour charge etc complete
3.12
-
-
... More
RCC 1:1.5:3 Mix using 20 mm ISS HBG Metal including cost and conveyance and all labour charge etc complete
48.33
-
-
... More
Supply and fixing of 200 mm dia RCC Pipe -12 M
12
-
-
... More
Construction of Drainage Culvert at Arulmigu Swedaranya Swami Temple in Thiruvengadu Panchayat
-
-
-
... More
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
28.8
-
-
... More
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete.
4.8
-
-
... More
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
4.8
-
-
... More
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete. For
30.27
-
-
... More
RCC 1:1.5:3 mix using 20mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete. For Deck Slab
6.67
-
-
... More
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete.
75.72
-
-
... More
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete.
11.25
-
-
... More
Supply and fabrication of steel including cost and conveyance of all materials to site and all labour charges etc., complete.
0.55
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements