Pradhan Mantri Gram Sadak Yojana Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Civil And Construction
Eprocure
Opening Date15 Jul 2022
Closing Date5 Aug 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Centering for Sides and Soffits of Concrete wall using Steel Centering including hire charges for all materials and labour etc.

196.8

-

-

... More
Providing GSB Grade III from approved quarry and stacking them at site to dept. gauge for premeasurement including cost and conveyance of all materials to site and all labour charges at site, including watering and compaction etc. complete as per standard specifications.

82.66

-

-

... More
supply and fixing of 60mm thick paver Block including cost for Block conveyance and fixing in position by using hydralic machine all materials to site , and all labour charges for mixing, laying and curing etc complete

826.56

-

-

... More
Cement Concrete in 1 : 2 : 4 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete

22.63

-

-

... More
Providing CC Pavement at Ramanathapuram H/O Nadanthai

-

-

-

... More
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete

135.74

-

-

... More
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete

123.1

-

-

... More
Brick Work In cement Mortar 1:5 Mix Using country Bricks 8 3/4" x 4 3/8" x 2 3/4" and conveyance of all Materials to site and all Labour Charges etc Complete

41.54

-

-

... More
Cement Concrete in 1:2:4 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete

74.71

-

-

... More
Plastering with cement mortar 1:5mix to 12mm Thick Including cost and Conveyance of all Materials to site and all Labour charges etc

319.06

-

-

... More
Laying of Paver Blocks at Puliyampatty Ar street H/O Nadanthai

-

-

-

... More
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete

29.28

-

-

... More
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete

2.58

-

-

... More
Centering for Sides and Soffits of Concrete wall using Steel Centering including hire charges for all materials and labour etc.

39.56

-

-

... More
Providing GSB Grade III from approved quarry and stacking them at site to dept. gauge for premeasurement including cost and conveyance of all materials to site and all labour charges at site, including watering and compaction etc. complete as per standard specifications.

22.83

-

-

... More
supply and fixing of 60mm thick paver Block including cost for Block conveyance and fixing in position by using hydralic machine all materials to site , and all labour charges for mixing, laying and curing etc complete

152.22

-

-

... More
Cement Concrete in 1 : 2 : 4 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete

4.55

-

-

... More
Providing CC Pavement at Odakinathupudur Ar Street H/O Ramadevam

-

-

-

... More
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete

44.64

-

-

... More
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete

41.74

-

-

... More
Brick Work In cement Mortar 1:5 Mix Using country Bricks 8 3/4" x 4 3/8" x 2 3/4" and conveyance of all Materials to site and all Labour Charges etc Complete

12.42

-

-

... More
Cement Concrete in 1:2:4 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete

27.27

-

-

... More
Plastering with cement mortar 1:5mix to 12mm Thick Including cost and Conveyance of all Materials to site and all Labour charges etc

108

-

-

... More
Providing CC Pavement at Vadugapalayam Naidu Street H/O Ramadevam

-

-

-

... More
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete

19.99

-

-

... More
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete

19.02

-

-

... More
Brick Work In cement Mortar 1:5 Mix Using country Bricks 8 3/4" x 4 3/8" x 2 3/4" and conveyance of all Materials to site and all Labour Charges etc Complete

3.11

-

-

... More
Cement Concrete in 1:2:4 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete

12.94

-

-

... More
Plastering with cement mortar 1:5mix to 12mm Thick Including cost and Conveyance of all Materials to site and all Labour charges etc

23.85

-

-

... More
Providing CC Pavement at Vadugapalayam Kudi Street H/O Ramadevam

-

-

-

... More
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete

25.44

-

-

... More
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete

22.92

-

-

... More
Brick Work In cement Mortar 1:5 Mix Using country Bricks 8 3/4" x 4 3/8" x 2 3/4" and conveyance of all Materials to site and all Labour Charges etc Complete

8.28

-

-

... More
Cement Concrete in 1:2:4 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete

13.68

-

-

... More
Plastering with cement mortar 1:5mix to 12mm Thick Including cost and Conveyance of all Materials to site and all Labour charges etc

63.6

-

-

... More
Providing CC Pavement at R.Pudupalayam Kudi Street H/O Ramadevam

-

-

-

... More
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete

16.51

-

-

... More
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete

16.51

-

-

... More
Cement Concrete in 1:2:4 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete

12.39

-

-

... More
Providing CC Pavement at Sengodapalayam Ar Street H/O Ramadevam

-

-

-

... More
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete

20.1

-

-

... More
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete

20.1

-

-

... More
Cement Concrete in 1:2:4 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete

15.08

-

-

... More
Providing CC Pavement at Ramadevam H/O Ramadevam

-

-

-

... More
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete

12.63

-

-

... More
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete

12.63

-

-

... More
Cement Concrete in 1:2:4 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete

9.47

-

-

... More
Providing CC Pavement at R.Pudupalayam Boyer Street H/O Ramadevam

-

-

-

... More
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete

12.45

-

-

... More
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete

12.45

-

-

... More
Cement Concrete in 1:2:4 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete

9.34

-

-

... More
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.