Pradhan Mantri Gram Sadak Yojana Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date15 May 2024
Closing Date3 Jul 2024
Tender Amount₹ 1,34,97,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Scarifying the Existing Bituminous road surface to a depth of 100 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

-

-

-

... More
Km : 2/285 - 5/300

3760.87

-

-

... More
Construction of Embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5

-

-

-

... More
Km. 2/285 - 3/0

854.09

-

-

... More
Km. 3/0 - 4/0

1202.31

-

-

... More
Km. 4/0 - 5/0

1189.5

-

-

... More
Km. 5/0 - 5/300

361.46

-

-

... More
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel Shoulder)

-

-

-

... More
Km. 2/285 - 3/0

402.19

-

-

... More
Km. 3/0 - 4/0

562.5

-

-

... More
Km. 4/0 - 5/0

560.87

-

-

... More
Km. 5/0 - 5/300

166.84

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 (WMM).

-

-

-

... More
Km. 2/285 - 2/4

68.9

-

-

... More
Providing and applying Prime Coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Low Porosity

-

-

-

... More
Km. 2/285 - 2/4

459.38

-

-

... More
Providing and applying Tack Coat with Bitumen Emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared Granular surface treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 (ii).

-

-

-

... More
Km. 2/285 - 2/4

459.38

-

-

... More
Providing, laying and rolling of Open-Graded Premix Surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509

-

-

-

... More
Km. 2/285 - 3/0

2709.38

-

-

... More
Km. 3/0 - 4/0

3847.97

-

-

... More
Km. 4/0 - 5/0

3909.94

-

-

... More
Km. 5/0 - 5/300

1125

-

-

... More
Providing and laying Seal Coat sealing the voids in a Bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510. (ii) Bitumen (S-65)

-

-

-

... More
Km. 2/285 - 3/0

2709.38

-

-

... More
Km. 3/0 - 4/0

3847.97

-

-

... More
Km. 4/0 - 5/0

3909.94

-

-

... More
Km. 5/0 - 5/300

1125

-

-

... More
Construction of Sub base & Base by way of using blended material comprising of 60% Available soil of CBR 5; 40% GSB Material, Grade B; 3% Cement by weight of soil; 1kg of Terrasil or Equivalent per cum & 1kg of Zycobond or Equivalent per cum; Mechanically blended using a Rotavator at Optimum Moisture Content; laid in Two layers of Equivalent Depth each and duly compacted with Static Roller Including Maintaining the Camber as per specifications. Complete job, finished work to be measured. (ref: MORD sl.no4.11-(i) page no.4-20)

-

-

-

... More
Km. 2/4 - 3/0

270

-

-

... More
Km. 3/0 - 4/0

461.75

-

-

... More
Km. 4/0 - 5/0

467.88

-

-

... More
Km. 5/0 - 5/300

133.47

-

-

... More
Providing and applying Primer Coat with cationic bitumen emulsion(water based) modified with Nanotechnology based Penetrative Reactive Water-soluble Organosilane material (forming water clear solution) qualifying as per the test, on prepared surface of granular base including cleaning of road surface and prime coat-mix made using 100 part Cationic Bitumen Emulsion (Grade CSS-1) and 200 parts of Nanotechnology Solution (1 kg Terraprime :200 liter water (≤1000ppm TDS) and spraying at the rate of 1.35 Kg/sqm using mechanical means as per Technical Specification.

-

-

-

... More
Km. 2/4 - 3/0

2250

-

-

... More
Km. 3/0 - 4/0

3847.97

-

-

... More
Km. 4/0 - 5/0

3899.06

-

-

... More
Km. 5/0 - 5/300

1112.25

-

-

... More
Providing and applying Tack-coat with cationic bitumen emulsion (CRS-1) in mixing ratio of 0.014 part Nanotechnology based Penetrative Reactive Water-soluble Organosilane material (forming water clear solution) : 1 part water (1000 ppm TDS) : 1 part cationic bitumen emulsion and spraying using emulsion distributor at the rate of 1.2 times of conventional spray rate 0.275 Kg per sqm (i.e 0.33 kg/sqm) on the prepared new bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503 .(ref:Mord pg.no 5-4)

-

-

-

... More
Km. 2/4 - 3/0

2250

-

-

... More
Km. 2/4 - 3/0

3847.97

-

-

... More
Km. 4/0 - 5/0

3909.94

-

-

... More
Km. 5/0 - 5/300

1125

-

-

... More
Waterproofing of the shoulder surface by spraying 1kg of Terrasil or Equivalent and 1kg of Zycobond or Equivalent in the ratio of 1:1:200 with Potable Water and spraying on the surface @ 3ltrs/sqm and compacting with a static roller. Complete job, finished work to be measured.

-

-

-

... More
Km. 2/4 - 3/0

2250

-

-

... More
Km. 3/0 - 4/0

3750

-

-

... More
Km. 4/0 - 5/0

3739.12

-

-

... More
Km. 5/0 - 5/300

1112.25

-

-

... More
Provision of Rumble Strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.

-

-

-

... More
Km. 3/0 - 4/0

3.38

-

-

... More
Km. 4/0 - 5/0

4.5

-

-

... More
Provision for Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface

133

-

-

... More
Provision for Road Marker/ Road stud with lens Reflector

140

-

-

... More
Provision for Name Board

1

-

-

... More
Provision for PMGSY Logo Board

3

-

-

... More
Provision for Sign Board (1 curve =2Nos)

28

-

-

... More
Provision for Chevron Sign Octogan Board (90cm)

2

-

-

... More
Provision for 60 cm Circle(Mandatory Sign Baoard)

4

-

-

... More
Provision for Reflector - Traffic signs (Near culverts & trees) - Star sign Sticker

8

-

-

... More
Provision for Citizen Information Board

1

-

-

... More
Provision for Maintenance Board

1

-

-

... More
Provision for KM Stone

3

-

-

... More
Provision for HM Stone

12

-

-

... More
2.0mCulvert @ Ch. 5213,

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Causeway at : 5219

-

-

-

... More
Removal of Wearing Coat & CC

75

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
2.0mCulvert @ Ch. 5213,

91.73

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
2.0mCulvert @ Ch. 5213,

8.1

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed including centering and shuttering.

-

-

-

... More
2.0mCulvert @ Ch. 5213,

10.79

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directedFor Footings as 4% Rate for Centering Works

-

-

-

... More
2.0mCulvert @ Ch. 5213,

52.62

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directedFor Stem as10% Rate for Centering Works

-

-

-

... More
2.0mCulvert @ Ch. 5213,

33.96

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
2.0mCulvert @ Ch. 5213,

3.54

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
2.0mCulvert @ Ch. 5213,

4.68

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
2.0mCulvert @ Ch. 5213,

0.48

-

-

... More
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

-

-

-

... More
2.0mCulvert @ Ch. 5213,

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
2.0mCulvert @ Ch. 5213,

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
2.0mCulvert @ Ch. 5213,

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
2.0mCulvert @ Ch. 5213,

9.25

-

-

... More
Maintenance Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

3.02

-

-

... More
For the Second Year from the date of cpmpletion of work

3.02

-

-

... More
For the Third Year from the date of completion of work

3.02

-

-

... More
For the Fourth Year from the date of completion of work

3.02

-

-

... More
For the Fifth Year from the date of completion of work

3.02

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.