Pradhan Mantri Gram Sadak Yojana Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date17 May 2024
Closing Date22 Jul 2024
Tender Amount₹ 2,72,01,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

-

-

-

... More
in Km. 0/0 - 4/500

4592

-

-

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 (Cutting)

-

-

-

... More
in Km. 0/0 - 4/500

1.18

-

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth)

-

-

-

... More
in Km. 0/0 - 4/500

1.18

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.( Carted Earth)

-

-

-

... More
in Km. 0/0 - 4/500

3896.01

-

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)

-

-

-

... More
Km : 0 / 0 - 1 / 0

224.35

-

-

... More
Km : 1/0-2/0

50.4

-

-

... More
Km : 2/0-3/0

223.04

-

-

... More
Km : 3/0-4/0

216.92

-

-

... More
Km : 4/0-4/5

111.85

-

-

... More
Laying and spreading available soil in Base Course on a prepared surface, including mixing of 50% Soil + 25% 20 mm down Aggregate + 25% Stone Dust and 3% RBI -81 by mix in place with rotavator and grading with motor grader and compacting with 8-10 tonne Vibratory Compactor at OMC to the desired density as per specifications

-

-

-

... More
Km : 0 / 0 - 1 / 0

339.11

-

-

... More
Km : 1/0-2/0

89.93

-

-

... More
Km : 2/0-3/0

380.24

-

-

... More
Km : 3/0-4/0

370.86

-

-

... More
Km : 4/0-4/5

191.47

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. (Grading II)(Control Section)

-

-

-

... More
Km : 0 / 0 - 1 / 0

29.53

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (Grading III) (Control Section)

-

-

-

... More
Km : 0 / 0 - 1 / 0

29.53

-

-

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90-1.20 kg/sqm using mechanical means as per Technical Specification Clause 502

-

-

-

... More
in Km. 0/0 - 4/500

14109.65

-

-

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.

-

-

-

... More
in Km. 0/0 - 4/500

14174.92

-

-

... More
Providing and laying surface dressing as wearing course consisting of a layer of bituminous binder laid on the prepared surface, followed by a cover of crushed stone aggregates of specified size and rolling with three wheel 80-100 kN static roller including cleaning the road surface as per Technical Specification Clause 507.

-

-

-

... More
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.

-

-

-

... More
Km : 0 / 0 - 1 / 0

3795.74

-

-

... More
Km : 1/0-2/0

899.17

-

-

... More
Km : 2/0-3/0

3834.97

-

-

... More
Km : 3/0-4/0

3719.5

-

-

... More
Km : 4/0-4/5

1925.54

-

-

... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510

-

-

-

... More
Km : 0 / 0 - 1 / 0

3795.74

-

-

... More
Km : 1/0-2/0

899.17

-

-

... More
Km : 2/0-3/0

3834.97

-

-

... More
Km : 3/0-4/0

3719.5

-

-

... More
Km : 4/0-4/5

1925.54

-

-

... More
Provision of rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.

-

-

-

... More
Km : 0 / 0 - 1 / 0

11.25

-

-

... More
Km : 1/0-2/0

22.5

-

-

... More
Km : 2/0-3/0

22.5

-

-

... More
Km : 3/0-4/0

22.5

-

-

... More
Km : 4/0-4/5

11.25

-

-

... More
Provision for CD Works

-

-

-

... More
Constuction of 1.5 m RCC Slab culvert - 6 Nos 908, , 2014, 2480, 2845, 3275, 4261

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Culvert @ Ch. 908

51.61

-

-

... More
Culvert @ Ch. 2014, 2480, 2845

154.83

-

-

... More
Culvert @ Ch. 3275

51.61

-

-

... More
Culvert @ Ch. 4261

51.61

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Culvert @ Ch. 908

9.38

-

-

... More
Culvert @ Ch. 2014, 2480, 2845

28.14

-

-

... More
Culvert @ Ch. 3275

9.38

-

-

... More
Culvert @ Ch. 4261

9.38

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm down graded HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below Sill Level )

-

-

-

... More
Culvert @ Ch. 908

29.93

-

-

... More
Culvert @ Ch. 2014, 2480, 2845

89.79

-

-

... More
Culvert @ Ch. 3275

29.93

-

-

... More
Culvert @ Ch. 4261

29.93

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm down graded HBG metal including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above Sill Level )

-

-

-

... More
Culvert @ Ch. 908

33.93

-

-

... More
Culvert @ Ch. 2014, 2480, 2845

101.79

-

-

... More
Culvert @ Ch. 3275

33.93

-

-

... More
Culvert @ Ch. 4261

33.93

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm down graded HBG metal including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above Sill Level )

-

-

-

... More
Culvert @ Ch. 908

3.36

-

-

... More
Culvert @ Ch. 2014, 2480, 2845

10.08

-

-

... More
Culvert @ Ch. 3275

3.36

-

-

... More
Culvert @ Ch. 4261

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
Culvert @ Ch. 908

3.31

-

-

... More
Culvert @ Ch. 2014, 2480, 2845

9.93

-

-

... More
Culvert @ Ch. 3275

3.31

-

-

... More
Culvert @ Ch. 4261

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
Culvert @ Ch. 908

0.35

-

-

... More
Culvert @ Ch. 2014, 2480, 2845

1.05

-

-

... More
Culvert @ Ch. 3275

0.35

-

-

... More
Culvert @ Ch. 4261

0.35

-

-

... More
Providing and fixing 6mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

-

-

-

... More
Culvert @ Ch. 908

15

-

-

... More
Culvert @ Ch. 2014, 2480, 2845

45

-

-

... More
Culvert @ Ch. 3275

15

-

-

... More
Culvert @ Ch. 4261

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
Culvert @ Ch. 908

4.5

-

-

... More
Culvert @ Ch. 2014, 2480, 2845

13.5

-

-

... More
Culvert @ Ch. 3275

4.5

-

-

... More
Culvert @ Ch. 4261

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
Culvert @ Ch. 908

12

-

-

... More
Culvert @ Ch. 2014, 2480, 2845

36

-

-

... More
Culvert @ Ch. 3275

12

-

-

... More
Culvert @ Ch. 4261

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
Culvert @ Ch. 908

5.26

-

-

... More
Culvert @ Ch. 2014, 2480, 2845

15.78

-

-

... More
Culvert @ Ch. 3275

5.26

-

-

... More
Culvert @ Ch. 4261

5.26

-

-

... More
Constuction of Pipe Culvert 3 Nos. , , , 3183, 4060, 4128

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Pipe Culvert @ Ch. 3183

10.62

-

-

... More
pipe Culvert @ Ch. 4060, 4128

21.24

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Pipe Culvert @ Ch. 3183

4.84

-

-

... More
pipe Culvert @ Ch. 4060, 4128

9.68

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Pipe Culvert @ Ch. 3183

5.8

-

-

... More
pipe Culvert @ Ch. 4060, 4128

11.6

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Pipe Culvert @ Ch. 3183

10.39

-

-

... More
pipe Culvert @ Ch. 4060, 4128

20.78

-

-

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.

-

-

-

... More
Pipe Culvert @ Ch. 3183

7.5

-

-

... More
pipe Culvert @ Ch. 4060, 4128

15

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
Pipe Culvert @ Ch. 3183

4.2

-

-

... More
pipe Culvert @ Ch. 4060, 4128

8.4

-

-

... More
Dismantling the existing CD structures

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

80.78

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

2.62

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202., Reinforced Cement Concrete

1.6

-

-

... More
Dismantling, Clearing away and carefully stacking materials useful for re use. Removal of cut stone slabs

4.63

-

-

... More
Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202.

-

-

-

... More
Culverts / Dry fixing @ Ch. 908, 4261

10

-

-

... More
Culverts / Dry fixing @ Ch. 2845, 3183, 4060, 4128

20

-

-

... More
Provision for Protective works (Km 0/0 -1/0 , 2/0 - 3/0 , 3/0 - 4/0 )

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Km : 0 / 0 - 1 / 0

99

-

-

... More
Km : 2 / 0 - 3 / 0

158.4

-

-

... More
Km : 3 / 0 - 4 / 0

95.7

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Km : 0 / 0 - 1 / 0

18

-

-

... More
Km : 2 / 0 - 3 / 0

28.8

-

-

... More
Km : 3 / 0 - 4 / 0

17.4

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm down graded HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below Sill Level )

-

-

-

... More
Km : 0 / 0 - 1 / 0

55.35

-

-

... More
Km : 2 / 0 - 3 / 0

88.56

-

-

... More
Km : 3 / 0 - 4 / 0

55.13

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm down graded HBG metal including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above Sill Level )

-

-

-

... More
Km : 0 / 0 - 1 / 0

55.91

-

-

... More
Km : 2 / 0 - 3 / 0

89.5

-

-

... More
Km : 3 / 0 - 4 / 0

67.11

-

-

... More
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications

-

-

-

... More
Km : 0 / 0 - 1 / 0

12.71

-

-

... More
Km : 2 / 0 - 3 / 0

20.34

-

-

... More
Km : 3 / 0 - 4 / 0

9.17

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
Km : 0 / 0 - 1 / 0

98

-

-

... More
Km : 2 / 0 - 3 / 0

158

-

-

... More
Km : 3 / 0 - 4 / 0

86

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeding vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground levels as per drawings and Technical Specification Clause 801

-

-

-

... More
Logo board

4

-

-

... More
Sign board

36

-

-

... More
Citizen board

1

-

-

... More
Name board

1

-

-

... More
Manitanance board

1

-

-

... More
Kilometre Stones

4

-

-

... More
Hectametre Stones

19

-

-

... More
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to berectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

3.72

-

-

... More
For the Second Year from the date of completion of work

3.72

-

-

... More
For the Third Year from the date of completion of work

3.72

-

-

... More
For the Fourth Year from the date of completion of work

3.72

-

-

... More
For the Fifth Year from the date of completion of work

3.72

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.