Pradhan Mantri Gram Sadak Yojana Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date16 May 2024
Closing Date23 Jul 2024
Tender Amount₹ 2,86,97,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

-

-

-

... More
Km 0/0 - 3/885

4816.32

-

-

... More
Construction of embankment with approved materials obtained from borrow pits with a lift upto 1.5m, transporting to site, spreading, grading to required slope and compacting to meet requiements of Tables 300.1 and 300.2 with a lead upto 100 m as per Technical specification Clause 301.5 (Carted Earth)

-

-

-

... More
Km 0/0 - 1/0

858.21

-

-

... More
Km 1/0 - 2/0

848.5

-

-

... More
Km 2/0 - 3/0

870.04

-

-

... More
Km 3/0 - 3/885

777.91

-

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel Shoulder)

-

-

-

... More
Km 0/0 - 1/0

334.56

-

-

... More
Km 1/0 - 2/0

333.58

-

-

... More
Km 2/0 - 3/0

336.52

-

-

... More
Km 3/0 - 3/885

295.75

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.

-

-

-

... More
Km 0/0 -1/0

567.8

-

-

... More
Km 1/0-2/0

567.9

-

-

... More
Km 2/0-3/0

565.26

-

-

... More
Km 3/0-3/885

498.64

-

-

... More
Providing and applying Primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 Kg/Sq.m (0.70-1.0) using mechanical means as per Technical Specification. Clause 502.

-

-

-

... More
Km 0/0 -1/0

3785.29

-

-

... More
Km 1/0-2/0

3785.95

-

-

... More
Km 2/0-3/0

3768.36

-

-

... More
Km 3/0-3/885

3324.23

-

-

... More
Providing and applying Tack coat with bitumen emulsion (RS-1) using emulsion distributor at rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with primer cleaned with hydraulic broom as per Technical Specification. Clause 503.

-

-

-

... More
Km 0/0 -1/0

3817.93

-

-

... More
Km 1/0-2/0

3829.47

-

-

... More
Km 2/0-3/0

3779.24

-

-

... More
Km 3/0-3/885

3356.87

-

-

... More
Mix Seal Surface (Using Plastic Waste) - Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 510.

-

-

-

... More
Km 0/0 -1/0

3817.93

-

-

... More
Km 1/0-2/0

3829.47

-

-

... More
Km 2/0-3/0

3779.24

-

-

... More
Km 3/0-3/885

3356.87

-

-

... More
Providing Rumble strips covered with Premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint. Rumble Strips = 3X3.75X0.5 = 2.81

-

-

-

... More
Km 0/0 -1/0

5.62

-

-

... More
Km 1/0-2/0

5.62

-

-

... More
Km 2/0-3/0

5.62

-

-

... More
Km 3/0-3/885

5.62

-

-

... More
Providing and laying of hot applied Thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sq.m area, thickness of 2.5 mm is exclusive of surface apllied glass beads as per IRC : 35. The finished surface to be level , uniform and free from streaks and holes etc complete as per MORT &H specification No.803.

-

-

-

... More
Km 0/0 -1/0

200

-

-

... More
Km 1/0-2/0

200

-

-

... More
Km 2/0-3/0

200

-

-

... More
Km 3/0-3/885

177

-

-

... More
Providing and fixing Name Board Project

1

-

-

... More
Providing and fixing Logo of PMGSY

3

-

-

... More
Providing and Fixing of "Citizen Information road" of PMGSY project

1

-

-

... More
Provision for PMGSY Maintenance board

1

-

-

... More
Retro-Reflectorised Traflic Signs (with definition board) Type IV - Providing and erecting of Retro-Reflectorised Cautionary, Mandatory and Informatory signs (with definition board) made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTMD 4956-09, specification and fixed over 1.5mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrète 45cmX45cmX60cm below ground level etc., complete including 7 year warranty for the Retro reflective Sheeting as per Clause 6.9 IRC 67-2012 Specification (as per MORT & Spec No.801)

-

-

-

... More
60 cm Equilateral Ttriangle - Cautionary sign board

9

-

-

... More
60 cm Circular - Mandatory Sign board

8

-

-

... More
Chevron Sign 90 cm Octogen (Curves) board

9

-

-

... More
Provision for Reflector

30

-

-

... More
Provision for Kilometre Stones - Reinforced Cement Concrete M15 grade Kilometre stone/ local stone of standard design as per IRC:8 fixing in position including painting and printing etc., as per drwing and technical specification Clause 1703.

-

-

-

... More
Ordinary Kilometre Stone (Precast)

3

-

-

... More
200m Stone (Precast)

16

-

-

... More
Guard stone

39

-

-

... More
Construction of 1.50 m RCC Slab culvert @ Chainage 14 m,41 m,494 m

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Culvert @ Ch.14 m, 41 m, 494 m.

18.15

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Culvert @ Ch.14 m, 41 m, 494 m.

53.61

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, Cement concrete, wood work, steel work, including T&P and Scaffolding wherever necessary, sorting the dismantled materials, disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Culvert @ Ch.14 m.

22.5

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Culvert @ Ch.14 m, 41 m, 494 m.

270.9

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Culvert @ Ch.14 m, 41 m, 494 m.

30.96

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm, 20mm & 10mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Culvert @ Ch.14 m, 41 m, 494 m.

30.96

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below sill)

-

-

-

... More
Culvert @ Ch.14 m, 41 m, 494 m.

151.92

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above sill)

-

-

-

... More
Culvert @ Ch.14 m, 41 m, 494 m.

83.28

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Culvert @ Ch.14 m, 41 m, 494 m.

10.08

-

-

... More
Cement concrete 1:1.5:3 using 20mm & 10mmISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
Culvert @ Ch.14 m, 41 m, 494 m.

9.93

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
Culvert @ Ch.14 m, 41 m, 494 m.

1.05

-

-

... More
Providing and fixing 20mm thick compressible Fibre board in expansion joint complete as per drawing and MORD technical specification

-

-

-

... More
Culvert @ Ch.14 m, 41 m, 494 m.

45

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab.

-

-

-

... More
Culvert @ Ch.14 m, 41 m, 494 m.

13.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
Culvert @ Ch.14 m, 41 m, 494 m.

36

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
Culvert @ Ch.14 m, 41 m, 494 m.

23.1

-

-

... More
Construction of 1.50 m RCC Slab culvert @ Chainage 1095 m, 1265 m, 1492 m, 1881 m.

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Culvert @ Ch.1095 m, 1265 m, 1492 m, 1881 m.

24.2

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Culvert @ Ch.1095 m, 1265 m, 1492 m, 1881 m.

71.48

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, Cement concrete, wood work, steel work, including T&P and Scaffolding wherever necessary, sorting the dismantled materials, disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Culvert @ Ch.1095 m, 1265 m, 1492 m, 1881 m.

30

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Culvert @ Ch.1095 m, 1265 m, 1492 m, 1881 m.

361.2

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Culvert @ Ch.1095 m, 1265 m, 1492 m, 1881 m.

41.28

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm, 20mm & 10mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Culvert @ Ch.1095 m, 1265 m, 1492 m, 1881 m.

41.28

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below sill)

-

-

-

... More
Culvert @ Ch.1095 m, 1265 m, 1492 m, 1881 m.

202.56

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above sill)

-

-

-

... More
Culvert @ Ch.1095 m, 1265 m, 1492 m, 1881 m.

111.04

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Culvert @ Ch.1095 m, 1265 m, 1492 m, 1881 m.

13.44

-

-

... More
Cement concrete 1:1.5:3 using 20mm & 10mmISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
Culvert @ Ch.1095 m, 1265 m, 1492 m, 1881 m.

13.24

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
Culvert @ Ch.1095 m, 1265 m, 1492 m, 1881 m.

1.4

-

-

... More
Providing and fixing 20mm thick compressible Fibre board in expansion joint complete as per drawing and MORD technical specification

-

-

-

... More
Culvert @ Ch.1095 m, 1265 m, 1492 m, 1881 m.

60

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab.

-

-

-

... More
Culvert @ Ch.1095 m, 1265 m, 1492 m, 1881 m.

18

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
Culvert @ Ch.1095 m, 1265 m, 1492 m, 1881 m.

48

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
Culvert @ Ch.1095 m, 1265 m, 1492 m, 1881 m.

30.8

-

-

... More
Construction of 1.50 m RCC Slab culvert @ Chainage 2987 m.

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Culvert @ Ch.2987 m.

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Culvert @ Ch.2987 m.

17.87

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, Cement concrete, wood work, steel work, including T&P and Scaffolding wherever necessary, sorting the dismantled materials, disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Culvert @ Ch.2987 m.

7.5

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Culvert @ Ch.2987 m.

90.3

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Culvert @ Ch.2987 m.

10.32

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm, 20mm & 10mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Culvert @ Ch.2987 m.

10.32

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below sill)

-

-

-

... More
Culvert @ Ch.2987 m.

50.64

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above sill)

-

-

-

... More
Culvert @ Ch.2987 m.

27.76

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Culvert @ Ch.2987 m.

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm & 10mmISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
Culvert @ Ch.2987 m.

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
Culvert @ Ch.2987 m.

0.35

-

-

... More
Providing and fixing 20mm thick compressible Fibre board in expansion joint complete as per drawing and MORD technical specification

-

-

-

... More
Culvert @ Ch.2987 m.

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab.

-

-

-

... More
Culvert @ Ch.2987 m.

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
Culvert @ Ch.2987 m.

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
Culvert @ Ch.2987 m.

7.7

-

-

... More
Construction of 1.50 m RCC Slab culvert @ Chainage 3105 m, 3250 m, 3646 m.

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Culvert @ Ch.3105 m, 3250 m, 3646 m.

18.15

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Culvert @ Ch.3105 m, 3250 m, 3646 m.

53.61

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, Cement concrete, wood work, steel work, including T&P and Scaffolding wherever necessary, sorting the dismantled materials, disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Culvert @ Ch.3105 m, 3250 m, 3646 m.

22.5

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Culvert @ Ch.3105 m, 3250 m, 3646 m.

270.9

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Culvert @ Ch.3105 m, 3250 m, 3646 m.

30.96

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm, 20mm & 10mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Culvert @ Ch.3105 m, 3250 m, 3646 m.

30.96

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below sill)

-

-

-

... More
Culvert @ Ch.3105 m, 3250 m, 3646 m.

151.92

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above sill)

-

-

-

... More
Culvert @ Ch.3105 m, 3250 m, 3646 m.

83.28

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Culvert @ Ch.3105 m, 3250 m, 3646 m.

10.08

-

-

... More
Cement concrete 1:1.5:3 using 20mm & 10mmISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
Culvert @ Ch.3105 m, 3250 m, 3646 m.

9.93

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
Culvert @ Ch.3105 m, 3250 m, 3646 m.

1.05

-

-

... More
Providing and fixing 20mm thick compressible Fibre board in expansion joint complete as per drawing and MORD technical specification

-

-

-

... More
Culvert @ Ch.3105 m, 3250 m, 3646 m.

45

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab.

-

-

-

... More
Culvert @ Ch.3105 m, 3250 m, 3646 m.

13.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
Culvert @ Ch.3105 m, 3250 m, 3646 m.

36

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
Culvert @ Ch.3105 m, 3250 m, 3646 m.

23.1

-

-

... More
Construction of Protective works Left side - Reach : Km 3/0-3/050.

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Protective works Km 3/0 to 3/050 LHS

56.25

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Protective works Km 3/0 to 3/050 LHS

11.25

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40 mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Protective works Km 3/0 to 3/050 LHS

15

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below Ground level Footing)

-

-

-

... More
Protective works Km 3/0 to 3/050 LHS

27

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm, 20mm & 10mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above ground level Body wall)

-

-

-

... More
Protective works Km 3/0 to 3/050 LHS

57.52

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
Protective works Km 3/0 to 3/050 LHS

100

-

-

... More
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m

-

-

-

... More
For the First Year from the date of completion of work

3.89

-

-

... More
For the Second Year from the date of completion of work

3.89

-

-

... More
For the Third Year from the date of completion of work

3.89

-

-

... More
For the Fourth Year from the date of completion of work

3.89

-

-

... More
For the Fifth Year from the date of completion of work

3.89

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.