Pradhan Mantri Gram Sadak Yojana Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Pradhan Mantri Gram Sadak Yojana - PMGSY Tender
Civil And Construction
Road Construction
Excavation
Eprocure
Opening Date25 Jun 2024
Closing Date3 Jul 2024
Tender Amount₹ 1,16,09,000
Costs
EMD
0Document Cost
₹ 2,33,000Tender Fee
Refer Documents
Summary
Periodic Renewal Of Black Topping To 2 Roads In Keelaiyur And Thalainayar Block In Nagapattinam District
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_134970_1Bid Award Id
ViewTender No
Nagai Dt/PMGSY-Rn. BT-DIPR//1996/2023-224/Pkg-01RTender Authority
Pradhan Mantri Gram Sadak Yojana ViewPurchaser Address
-Website
http://http://omms.nic.in/Package Tenders
Nagai Dt/PMGSY-Rn. BT-DIPR//1996/2023-224/Pkg-03RNagai Dt/PMGSY-Rn. BT-DIPR//1996/2023-224/Pkg-02R
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
KM 1/0 - 2/0
3.38
-
-
KM 2/0 - 3/0
4.13
-
-
Advance BT patch work for making up the undulation in the existing B.T surface to an average thickness of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site including cost and conveyance of metal from approved Quarry, labour charges for tamping to required level, line and grade etc complete complying with standard specifications.
-
-
-
KM 0/0 - 1/0
5.63
-
-
KM 1/0 - 2/0
5.81
-
-
KM 2/0 - 3/0
7.69
-
-
KM 3/0 - 4/0
6.94
-
-
KM 4/0 - 4/821
4.38
-
-
Applying Tack coat using 2.00-2.50kgs of 10sqm over the BT surfaces including cost of bitumin emulsion supplied departmentally at section stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual work spot handling charges for brushing cleaning and including labour charges for preparing the surface for laying to actual work spot handling charges for brushing cleaning and to tackcoat and labour for applying the required quantity of bitumen emulsion including the hire charges and fuel charges for tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification 503(MoRD)
-
-
-
in Km. 0/0 - 4/823
14463
-
-
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
-
-
-
KM 0/0 - 1/0
90
-
-
KM 1/0 - 2/0
90
-
-
KM 2/0 - 3/0
90
-
-
KM 3/0 - 4/0
90
-
-
KM 4/0 - 4/821
73.89
-
-
Provision for Painting the Center and Edge Line with Thermo Plastic Paint Including cost of Materials and Labour Charges etc
-
-
-
in Km. 0/0 - 4/823
964
-
-
Provision for HM stone of size 0.90 m x 0.15 m x 0.15 m(missing stone)
16
-
-
Provision for Kilometre Stones 1.65m x 0.45m x 0.15m(missing stone)
4
-
-
Provision for Repainting Cautionary board
3
-
-
Provision for Cautionary New board
4
-
-
Provision for Refixing and Repainting Logo board
4
-
-
Provision for Refixing and Repainting Citizen Information board
1
-
-
Provision for Road Reflector
480
-
-
Provision for Repainting and Refixing Name board
1
-
-
Provision for Incentive fund New Name board
1
-
-
For the First Year from the date of completion of work
4.82
-
-
For the Second Year from the date of cpmpletion of work
4.82
-
-
For the Third Year from the date of completion of work
4.82
-
-
For the Fourth Year from the date of completion of work
4.82
-
-
For the Fifth Year from the date of completion of work
4.82
-
-
02.Periodic Renewal of Black Topping to MRL-18 -Kolapadu - Andipalayam Sithaimoor Road KM 0/0-1/0 in Thalainayar Block
-
-
-
Advance BT patch work for making up the undulation in the existing B.T surface to an average thickness of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site including cost and conveyance of metal from approved Quarry, labour charges for tamping to required level, line and grade etc complete complying with standard specifications.
-
-
-
KM 0/0 - 1/0
1.04
-
-
Applying Tack coat using 3.00kgs of 10sqm over the BT surfaces including cost of bitumin emulsion supplied departmentally at section stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual work spot handling charges for brushing cleaning and including labour charges for preparing the surface for laying to actual work spot handling charges for brushing cleaning and to tackcoat and labour for applying the required quantity of bitumen emulsion including the hire charges and fuel charges for tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification 503(MoRD)
-
-
-
KM 0/0 - 1/0
3750
-
-
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
-
-
-
KM 0/0 - 1/0
112.5
-
-
Provision for HM stone of size 0.90 m x 0.15 m x 0.15 m(missing stone)
4
-
-
Provision for Kilometre Stones 1.65m x 0.45m x 0.15m(missing stone)
1
-
-
Provision for New Cautionary board
4
-
-
Provision for New Logo board
3
-
-
Provision for Refixing and Repainting Citize Information board
1
-
-
Provision for Repainting and Refixing Name board
1
-
-
Provision for Incentive fund New Name board
1
-
-
For the First Year from the date of completion of work
1
-
-
For the Second Year from the date of cpmpletion of work
1
-
-
For the Third Year from the date of completion of work
1
-
-
For the Fourth Year from the date of completion of work
1
-
-
For the Fifth Year from the date of completion of work
1
-
-
GST Amount for providing Service to Government Contract Works for the above RENEWAL & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements