Pradhan Mantri Gram Sadak Yojana Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Civil And Construction
Road Construction
Drainage Work
Eprocure
Opening Date19 Jul 2022
Closing Date17 Aug 2022
Tender Amount₹ 1,16,15,000 
Notes
Download

Costs

Summary

Dharmapuri District - Providing Cc Pavement Without Drain Works 27 Nos Of Works In Harur Block In Package No. Tn 04- 23 / Agamt 2021-2022 Harur Block P23

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

115.88

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

13.36

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to GSB Gr III specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.

20.32

-

-

... More
Providing and Laying of Interlocking Concrete (Surface Textured) Block Pavements having thickness 60mm and compacted over a thin bedding sand layer of 25 mm thickness and joints shall be filled by fine sand of specified grading as per table 1500.6 of Spec

203.2

-

-

... More
Provision for Name Board

1

-

-

... More
Providing Paver Block at AK Thanda Highway Road Left Side 1st Street 70.00m x 3.00m @ Sitling Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

30.43

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

4.38

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

101.88

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

11.75

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to GSB Gr III specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.

17.78

-

-

... More
Providing and Laying of Interlocking Concrete (Surface Textured) Block Pavements having thickness 60mm and compacted over a thin bedding sand layer of 25 mm thickness and joints shall be filled by fine sand of specified grading as per table 1500.6 of Spec

177.8

-

-

... More
Provision for Name Board

1

-

-

... More
Providing Paver Block at Puduvalavu 2nd Street Near Anganwadi 100.00m x 3.00m @ Sitling Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

43.24

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

6.18

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

143.88

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

16.58

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to GSB Gr III specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.

25.4

-

-

... More
Providing and Laying of Interlocking Concrete (Surface Textured) Block Pavements having thickness 60mm and compacted over a thin bedding sand layer of 25 mm thickness and joints shall be filled by fine sand of specified grading as per table 1500.6 of Spec

254

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement without drain at Moolasittling 2nd Street 45.00m x 3.00m @ Sitling Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

16.88

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

14.4

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

43.2

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

3.6

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

10.13

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement without drain at Mariyamman Pudhur 1st Street 70.00m x 3.00m @ Sitling Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

26.25

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

22.4

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

66.95

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

5.6

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

15.75

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement without drain at Balakuttai 2nd Street 60.00m x 3.00m @ Sitling Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

22.5

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

19.2

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

57.45

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

4.8

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

13.5

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement without drain at A.K Thanda Highway Road Right Side 1st Street (39m x 3.00m) @ Sitling Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

14.63

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

12.48

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

37.5

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

3.12

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

8.78

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement with Drainage at Nethaji Nagar 3rd Street (Near OHT) 100.00m x 3.00m @ Mobiripatti Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

60.68

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

36.18

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

177.85

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

9.24

-

-

... More
Plastering in cm 1:4 mix using 20mm thick standard specification as directed etc complete

60

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

22.5

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement with Drainage at Anna Nagar 10th Street(Abthukalam nagar)130.00m x 3.00m @ Mobiripatti Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

83.38

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

47.63

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

229.15

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

21.04

-

-

... More
Plastering in cm 1:4 mix using 20mm thick standard specification as directed etc complete

39

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

29.25

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement with Drainage at Nethaji Nagar 2nd Street ( Near Kaliamman temple)90.00m x 3.00m @ Mobiripatti Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

54.63

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

32.58

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

159.15

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

8.1

-

-

... More
Plastering in cm 1:4 mix using 20mm thick standard specification as directed etc complete

27

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

20.25

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement without drain at A.R.Colony Union BT Road Left Side 1st Street 125.00m x 3.00m @ Vedakattamaduvu Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

46.88

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

40

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

119.2

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

10

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

28.13

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement without drain at A.R.Colony Union BT Road Left Side 2nd Street 135.00m x 3.00m @ Vedakattamaduvu Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

50.63

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

43.2

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

128.7

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

10.8

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

30.38

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement without drain at AlanKuttai Highwags Road Left Side 140.00m x 3.00m @ Vedakattamaduvu Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

52.5

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

44.8

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

133.45

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

11.2

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

31.5

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement with Drainage at Bharathipuram 1st Street IIIrd Left Cross 80.00m x 3.00m @ Kongavembu Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

62.18

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

31.78

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

205.65

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

14.4

-

-

... More
Plastering in cm 1:4 mix using 20mm thick standard specification as directed etc complete

48

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

18

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement without drain without drain at Valluvar Nagar 1st Street of 125.00m x 3.00m @ Kongavembu Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

46.88

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

40

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

119.2

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

10

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

28.13

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement without drain without drain at Valluvar Nagar 2nd Street of 90.00m x 3.00m @ Kongavembu Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

33.75

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

28.8

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

85.95

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

7.2

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

20.25

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement without drain without drain at Valluvar Nagar 3rd Street of 70.00m x 3.00m @ Kongavembu Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

26.25

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

22.4

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

66.95

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

5.6

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

15.75

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement with Drainage at Sangalivadi 10th Street 155.00m x 3.00m @ Chellampatti Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

136.58

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

59.08

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

398.1

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

31

-

-

... More
Plastering in cm 1:4 mix using 20mm thick standard specification as directed etc complete

69.75

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

34.88

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement With drain at Sangalivadi 9th Street 83.00m x 3.00m @ Chellampatti Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

80.26

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

34.76

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

234.9

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

18.2

-

-

... More
Plastering in cm 1:4 mix using 20mm thick standard specification as directed etc complete

40.95

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

20.48

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement with Drainage at Nerupanda kuppam 2nd Street 50.00m x 3.00m @ Agraharam Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

30.25

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

14.69

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

87.95

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

6.5

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

11.25

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement with Drainage at Nerupanda kuppam 3rd Street 85.00m x 3.00m @ Agraharam Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

27.06

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

14.69

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

87.95

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

6.5

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

11.25

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement with Drainage at Nerupanda kuppam 3rd Street 85.00m x 3.00m @ Agraharam Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

51.61

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

30.79

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

151.6

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

7.65

-

-

... More
Plastering in cm 1:4 mix using 20mm thick standard specification as directed etc complete

25.5

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

19.13

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement with Drainage at Nerupanda kuppam 4th Street 65.00m x 3.00m @ Agraharam Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

76.11

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

19.53

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

118.35

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

5.94

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

14.85

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement at Nerupanda kuppam Ist Right Street of 80.00m x 3.00m @ Agraharam Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

30

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

25.6

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

76.45

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

6.4

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

18

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement with Drainage at Achalvadi AR Colony 1st Street 65.00m x3.00m @ Achalvadi Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

29.25

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

22.1

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

24.05

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

140.2

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

13

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

14.63

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement with Drainage at Odasalpatti 2nd Street of 60.00m x3.00m @ Achalvadi Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

22.5

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

20.4

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

21.9

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

129.45

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

12

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

13.5

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
Providing CC Pavement with Drainage at Kudiyamapatti 2nd Street of 65.00m x3.00m @ Achalvadi Panchayat

-

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

25.03

-

-

... More
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.

22.1

-

-

... More
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

22.75

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting including cost and conveyance of all materials to site and all labour charges etc complete.

153.2

-

-

... More
Cement concrete 1:3:6 (One cement Three sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

14.3

-

-

... More
Cement concrete 1:2:4 (One cement two sand and four aggregate) using 20mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.

14.63

-

-

... More
Provision for Bitumen pad

1

-

-

... More
Provision for Name Board

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.