Pradhan Mantri Gram Sadak Yojana Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Civil And Construction
Road Construction
Eprocure
Opening Date1 May 2023
Closing Date17 May 2023
Tender Amount₹ 1,50,14,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A

-

-

-

... More
Km 0/0-2/730

1277.1

-

-

... More
Providing advance BT patches using 13.2mm HBG IRC metal using 44Kg of bitumen 80/100 grade including cost and conveyance of all labour charges etc., complete

-

-

-

... More
Km 0/0-1/0

0.82

-

-

... More
KM 1/0-2/0

2.15

-

-

... More
KM 2/0-2/730

1.69

-

-

... More
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for side berms

-

-

-

... More
Km 0/0-1/0

112.5

-

-

... More
KM 1/0-2/0

149.56

-

-

... More
KM 2/0-2/730

100.5

-

-

... More
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat

-

-

-

... More
Km 0/0-1/0

3819.73

-

-

... More
KM 1/0-2/0

3019.24

-

-

... More
KM 2/0-2/730

2048.48

-

-

... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-11) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site ete including hire charges and fuel charges foe 20-301 CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
Km 0/0-1/0

114.59

-

-

... More
KM 1/0-2/0

90.58

-

-

... More
KM 2/0-2/730

61.45

-

-

... More
Road Marking by providing and laying of hot applied Thermoplastic Compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5mm exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes.

-

-

-

... More
KM 0/0-2/730

538.5

-

-

... More
Providing rumble strips covered with premix bituminous carpet, 15-20 mm at centre and 250mm wide placed at 1m intervals centre to centre at approved locations to control speed, marked with white strips of road

-

-

-

... More
KM 0/0-2/730

2.81

-

-

... More
Providing For CD Works

-

-

-

... More
Provinding Hard Bed at Ch2400m

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing. removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

73.22

-

-

... More
Cement concrete in CC 1:4:8 mix using 40mm ISS HBG metal for foundation including watering whenever necessary and laid in layers not more than 15cm thick compacting ect., completed with standard specification and directed by the departmental officers.

12.2

-

-

... More
Supplying erecting and shuttering including necessarysupports for plane surfaces in foundation and basement and in all floors for slabs and beams complying with standard specification. Below Ground Level

185.84

-

-

... More
Cement conerete 1:3:6 using 40mm H.B.G.Metal including watering wherever necessary sand laid in layers compacting etc. complete complying with standard specification and directed by the departmental officers.

49.46

-

-

... More
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15% ) & (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix-in-place method).

36.6

-

-

... More
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER

18.3

-

-

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an

56

-

-

... More
Provision for Expansion Joints (Bituman Pad)

11.2

-

-

... More
Providing Culvert at Ch 1380m

-

-

-

... More
Dismanteling the Existing Damaged RCC Work including all etc Complete

3.74

-

-

... More
Dismanteling the Existing Damaged RR Work including all etc Complete

20.1

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing. removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

73.49

-

-

... More
Cement concrete in CC 1:4:8 mix using 40mm ISS HBG metal for foundation including watering whenever necessary and laid in layers not more than 15cm thick compacting ect., completed with standard specification and directed by the departmental officers.

9.49

-

-

... More
Cement conerete 1:3:6 using 40mm H.B.G.Metal including watering wherever necessary sand laid in layers compacting etc. complete complying with standard specification and directed by the departmental officers.

78.05

-

-

... More
Supplying erecting and shuttering including necessarysupports for plane surfaces in foundation and basement and in all floors for slabs and beams complying with standard specification. Below Ground Level

166.66

-

-

... More
Supplying erecting and shuttering including necessarysupports for plane surfaces in foundation and basement and in all floors for slabs and beams complying with standard specification. Above Ground Level

9.88

-

-

... More
Fabrication and places in positing mild steel on rubbed for steel and all ream forced cement concrete work as per type designed given including cost of steel binding wire in all floors etc., complete with standard specification.

0.35

-

-

... More
Reinforcement Concrete 1: 1 1/2: 3 Mix using 20mm ISS HG metal including cost and conveyance of all materials and Labours charges ect., completed.

2.65

-

-

... More
Providing 100 m dia AC Pipe for Wheepholer

19

-

-

... More
Provision for Expansion Joints (Bituman Pad)

3.15

-

-

... More
Providing Retaining wall at Ch 1390m

-

-

-

... More
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation.

7.2

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and directed by the departmental officers.

1.8

-

-

... More
Cement conerete 1:3:6 using 40mm H.B.G.Metal including watering wherever necessary sand laid in layers compacting etc. complete complying with tandard specification and directed by the departmental officers.

16.45

-

-

... More
Supplying erecting and shuttering including necessarysupports for plane surfaces in foundation and basement and in all floors for slabs and beams complying with standard specification.

49.95

-

-

... More
Providing 100 m dia AC Pipe for Wheepholer

3

-

-

... More
Provision for HM stones

11

-

-

... More
Provision for KM stones

2

-

-

... More
Provision for Road Stud with Reflector

58

-

-

... More
Provision for Gurad Stone

4

-

-

... More
Provision for Equilateral triangle cautionary signboard 90cm

20

-

-

... More
Provision for Name Board

1

-

-

... More
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)

-

-

-

... More
For 1st year maintenance

1

-

-

... More
For 2nd year maintenance

1

-

-

... More
For 3rd year maintenance

1

-

-

... More
For 4th year maintenance

1

-

-

... More
For 5th year maintenance

1

-

-

... More
Renewal of the road from Setrapatti to Appiyampatti Road Km.0/0-1/980

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201 in all etc complete KM 0/0 - 1/980

1069.2

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A

-

-

-

... More
KM 0/0 - 1/980

2138.4

-

-

... More
Providing advance BT patches using 13.2mm HBG IRC metal using 44Kg of bitumen 80/100 grade including cost and conveyance of all labour charges etc., complete

-

-

-

... More
Km 0/0 -1/0

3.92

-

-

... More
KM 1/0-1/980

2.26

-

-

... More
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for side berms

-

-

-

... More
Km 0/0 -1/0

112.5

-

-

... More
KM 1/0-1/980

110.25

-

-

... More
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat

-

-

-

... More
Km 0/0 -1/0

3819.73

-

-

... More
KM 1/0-1/980

3713.48

-

-

... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-11) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site ete including hire charges and fuel charges foe 20-301 CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
Km 0/0 -1/0

114.59

-

-

... More
KM 1/0-1/980

111.4

-

-

... More
Road Marking by providing and laying of hot applied Thermoplastic Compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5mm exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes.

-

-

-

... More
KM 0/0 - 1/980

399

-

-

... More
Providing rumble strips covered with premix bituminous carpet, 15-20 mm at centre and 250mm wide placed at 1m intervals centre to centre at approved locations to control speed, marked with white strips of road

-

-

-

... More
KM 0/0 - 1/980

2.63

-

-

... More
Provision for CD Works

-

-

-

... More
Provision Culvert ad Ch1490m

-

-

-

... More
Dismanteling the Existing Damaged RCC Work including all etc Complete

3.74

-

-

... More
Dismanteling the Existing Damaged RR Work including all etc Complete

20.1

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing. removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

92.17

-

-

... More
Cement concrete in CC 1:4:8 mix using 40mm ISS HBG metal for foundation including watering whenever necessary and laid in layers not more than 15cm thick compacting ect., completed with standard specification and directed by the departmental officers.

11.9

-

-

... More
Cement conerete 1:3:6 using 40mm H.B.G.Metal including watering wherever necessary sand laid in layers compacting etc. complete complying with standard specification and directed by the departmental officers.

87.65

-

-

... More
Supplying erecting and shuttering including necessarysupports for plane surfaces in foundation and basement and in all floors for slabs and beams complying with standard specification. Below Ground Level

188.9

-

-

... More
Supplying erecting and shuttering including necessarysupports for plane surfaces in foundation and basement and in all floors for slabs and beams complying with standard specification. Above Ground Level

12.13

-

-

... More
Fabrication and places in positing mild steel on rubbed for steel and all ream forced cement concrete work as per type designed given including cost of steel binding wire in all floors etc., complete with standard specification.

0.4

-

-

... More
Reinforcement Concrete 1: 1 1/2: 3 Mix using 20mm ISS HG metal including cost and conveyance of all materials and Labours charges ect., completed.

3.31

-

-

... More
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

54.6

-

-

... More
Providing 100 m dia AC Pipe for Wheepholer

15

-

-

... More
Provision for Expansion Joints (Bituman Pad)

3.15

-

-

... More
Provision for KM stones

1

-

-

... More
Provision for HM stones

8

-

-

... More
Provision for Road Stud with Reflector

66

-

-

... More
Provision for Guard Stones

14

-

-

... More
Provision for Equilateral Triangle cautionary Sign Board 90 cm

14

-

-

... More
Provision for Name Board

1

-

-

... More
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)

-

-

-

... More
For 1st year maintenance

1

-

-

... More
For 2nd year maintenance

1

-

-

... More
For 3rd year maintenance

1

-

-

... More
For 4th year maintenance

1

-

-

... More
For 5th year maintenance

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.