Pradhan Mantri Gram Sadak Yojana Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date15 May 2024
Closing Date19 Jun 2024
Tender Amount₹ 2,50,16,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

-

-

-

... More
Km. 0/0 - 3/510

4356.62

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.( Carted Earth)

-

-

-

... More
Km. 0/0 - 3/510

3071.39

-

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)

-

-

-

... More
Km 0/0-1/0

335.54

-

-

... More
Km 1/0-2/0

335.54

-

-

... More
Km 2/0-3/0

335.03

-

-

... More
Km 3/0-3/510

170.17

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired density.

-

-

-

... More
Km 0/0-1/0

576.97

-

-

... More
Km 1/0-2/0

576.17

-

-

... More
Km 2/0-3/0

571.2

-

-

... More
Km 3/0-3/510

283.62

-

-

... More
Providing and laying Bituminous Macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Using Waste Plastic)

-

-

-

... More
Km 0/0-1/0

192.33

-

-

... More
Km 1/0-2/0

192.05

-

-

... More
Km 2/0-3/0

190.4

-

-

... More
Km 3/0-3/510

94.54

-

-

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

-

-

-

... More
Km. 0/0 - 3/510

13386.31

-

-

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.

-

-

-

... More
Km. 0/0 - 3/510

13478.94

-

-

... More
Mix Seal Surfacing Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 (Using waste Plastic)

-

-

-

... More
Km 0/0-1/0

3868.2

-

-

... More
Km 1/0-2/0

3862.87

-

-

... More
Km 2/0-3/0

3835.37

-

-

... More
Km 3/0-3/510

1912.5

-

-

... More
Provision of Rumble Strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre-to-centre approved locations to control speed, marked with while strips of road marking paint. Rumble Strips = 3 X 3.75 X 0.25 = 2.81

-

-

-

... More
Km 0/0-1/0

16.86

-

-

... More
Km 1/0-2/0

33.72

-

-

... More
Km 2/0-3/0

11.24

-

-

... More
Road Marking With Hot Applied Thermoplastic Compound With reflectorising Glass Beads on Bituminous Surface:- Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35, The finished surface to be level uniform and free from streaks and holes etc complete as per MORTH&H specification No.803

-

-

-

... More
Km 0/0-1/0

200

-

-

... More
Km 1/0-2/0

200

-

-

... More
Km 2/0-3/0

200

-

-

... More
Km 3/0-3/510

102

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeding vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground levels as per drawings and Technical Specification Clause 801

-

-

-

... More
Logo board

3

-

-

... More
Sign board

22

-

-

... More
Circular Board

2

-

-

... More
Octagonal Board

1

-

-

... More
Citizen board

1

-

-

... More
Name board

1

-

-

... More
Maintanance board

1

-

-

... More
Provision for Kilometre Stones

3

-

-

... More
Provision for Hectametre Stones

14

-

-

... More
Construction of 1.5 m RCC Slab culvert @ CH 0/220, 0/805 ( 2Nos)

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
culvert @ CH 0/220, 0/805

145.46

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
culvert @ CH 0/220, 0/805

18.76

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
culvert @ CH 0/220, 0/805

28.16

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (BELOW SILL)

-

-

-

... More
culvert @ CH 0/220, 0/805

59.86

-

-

... More
Cement concrete 1 : 2.: 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
culvert @ CH 0/220, 0/805 Above Sill

67.86

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
culvert @ CH 0/220, 0/805

6.72

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
culvert @ CH 0/220, 0/805

6.62

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
culvert @ CH 0/220, 0/805

0.7

-

-

... More
Providing and fixing 6mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

-

-

-

... More
culvert @ CH 0/220, 0/805

30

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
culvert @ CH 0/220, 0/805

9

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
culvert @ CH 0/220, 0/805

24

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
culvert @ CH 0/220, 0/805

14.76

-

-

... More
Construction of 1.5 m RCC Slab culvert @ CH 1/488, 1/803 (2 Nos)

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
@ CH 1/488, 1/803

145.46

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
@ CH 1/488, 1/803

18.76

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
@ CH 1/488, 1/803

28.16

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (BELOW SILL)

-

-

-

... More
@ CH 1/488, 1/803

59.86

-

-

... More
Cement concrete 1 : 2.: 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
@ CH 1/488, 1/803

67.86

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
@ CH 1/488, 1/803

6.72

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
@ CH 1/488, 1/803

6.62

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
@ CH 1/488, 1/803

0.7

-

-

... More
Providing and fixing 6mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

-

-

-

... More
@ CH 1/488, 1/803

30

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
culvert @ CH 0/220, 0/805

9

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
@ CH 1/488, 1/803

24

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
@ CH 1/488, 1/803

14.76

-

-

... More
Construction of 1.5 m RCC Slab culvert @ CH 2/840

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
culvert @ CH 2/840

72.73

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
culvert @ CH 2/840

9.38

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
culvert @ CH 2/840

14.08

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (BELOW SILL)

-

-

-

... More
culvert @ CH 2/840

29.93

-

-

... More
Cement concrete 1 : 2.: 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
culvert @ CH 2/840

33.93

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
culvert @ CH 2/840

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
culvert @ CH 2/840

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
culvert @ CH 2/840

0.35

-

-

... More
Providing and fixing 6mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

-

-

-

... More
culvert @ CH 2/840

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
culvert @ CH 2/840

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
culvert @ CH 2/840

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
culvert @ CH 2/840

7.38

-

-

... More
Construction of 1.5 m RCC Slab culvert @ CH 3/046, 3/315.

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
@ CH 3/046, 3/315.

145.46

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
@ CH 3/046, 3/315.

18.76

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
@ CH 3/046, 3/315.

28.16

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (BELOW SILL)

-

-

-

... More
@ CH 3/046, 3/315.

59.86

-

-

... More
Cement concrete 1 : 2.: 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
@ CH 3/046, 3/315.

67.86

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
@ CH 3/046, 3/315.

6.72

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
@ CH 3/046, 3/315.

6.62

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
@ CH 3/046, 3/315.

0.7

-

-

... More
Providing and fixing 6mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

-

-

-

... More
@ CH 3/046, 3/315.

30

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
Culvert @ CH 1/488, 1/803

9

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
@ CH 3/046, 3/315.

24

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
@ CH 3/046, 3/315.

14.76

-

-

... More
Construction of 2.0 m RCC Slab culvert @ CH2/237

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
@ CH2/237

73.2

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
@ CH2/237

9.44

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
@ CH2/237

14.17

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (BELOW SILL)

-

-

-

... More
@ CH2/237

30.85

-

-

... More
Cement concrete 1 : 2.: 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
@ CH2/237

43.07

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
@ CH2/237

3.9

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
@ CH2/237

8.1

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
@ CH2/237

0.88

-

-

... More
Providing and fixing 6mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

-

-

-

... More
@ CH2/237

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
@ CH2/237

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
@ CH2/237

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
@ CH2/237

7.26

-

-

... More
Dismantling Existing CD works

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
CH0/220,2/840. Foundation and Body wall concrete

38.26

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
CH 0/220, 2/840 Body wall and Parapet Wall Foundation concrete

45.94

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202., Reinforced Cement Concrete

-

-

-

... More
CH 0/220, 2/840 , Deck slab concrete

8.8

-

-

... More
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2

-

-

-

... More
For 1st Year

1

-

-

... More
For 2nd Year

1

-

-

... More
For 3rd Year

1

-

-

... More
For 4th Year

1

-

-

... More
For 5th Year

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.