Pradhan Mantri Gram Sadak Yojana Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Civil And Construction
Building Construction
Eprocure
Opening Date19 Jul 2022
Closing Date17 Aug 2022
Tender Amount₹ 67,10,000 
Notes
Download

Costs

Summary

Dharmapuri District - Construction Of Cycle Stand, Boys And Girls Toilet, Teachers Toilet, Pd Shop And Anganwadi Build Works 14 Nos In Harur Block In Pakage No. Tn 04- 25 / Agamt 2021-2022 Harur Block P25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement

12.8

-

-

... More
Filling the Basement with excavated earth other than sand etc., complete complying to standard specification.

2.98

-

-

... More
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.

2.98

-

-

... More
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Complying with standard specification.

11.83

-

-

... More
Supplying and Errecting cenering for sides and soffits including necessary supports and strurring up to 3.29m hight for plane surface in all floors with all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffened,welded with steel ang

10.17

-

-

... More
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS )

0.28

-

-

... More
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and

2.05

-

-

... More
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers

25.45

-

-

... More
Plastering with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.

6.36

-

-

... More
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.

90.65

-

-

... More
Pavinig the Floor with scratch proof antiskid tiles of size 200x200x20mm in cm 1:3,20mm thick.and pointing with whiote cement 0.40kg per sqm mixed with colouring pigments to suit the colour of the tiles including finishing the joints neatly complying with

13.14

-

-

... More
Dadooing walls with Glazed tiles of any colour and any size laid in cm 1:2,10 mm tk.and pointing with white cement 0.40 kg per sqm mixed with colouring pigments to siut the colour of the tiles including finishing the joints neatly complying with standared

23.96

-

-

... More
Distembering two coats using best approved Interiar oil destember with one coat primer over New plastered Surface including cost and conveyance of materials and labour charges etc complete

24.95

-

-

... More
Exterior emulsion two coats using best freshly burnt shell lime ain all the floors using best quality and approved verity of colouring pigments including cost of lime,colouring pigments,fevicol type gum,brushes,scaffolding etc.,complete.

53.66

-

-

... More
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specific

8.1

-

-

... More
Provision for labour charges for fixing of sanitary pipes and specials including all cost etc., complete

1

-

-

... More
Transport Charges

1

-

-

... More
Provision for Labour charges for fixing of doors,windows ,Jolly including all cost etc., complete

1

-

-

... More
Provision for Towel rail, soap dish, buckets etc., all complete

1

-

-

... More
Supply and fixing of Mirror PVC / Fiber glass with frame including all cost etc., complete 600mm x 450mm

1

-

-

... More
Hand Rail for Ramp 40mm GI

-

-

-

... More
50mm GI pipe

65

-

-

... More
50mm GI pipe Coupling

10

-

-

... More
50mm GI Bend

24

-

-

... More
Provision for 1000 litre HDPE tank

1

-

-

... More
Towards cost supply and fixing of MS Door of size 0.75x1.80m of approximate weight of 21 to 23 kgs as per standard specification including all cost and conveyance etc., all complete

3

-

-

... More
Towards cost supply and fixing of RCC Jolly including all cost and conveyance etc.,all complete

2

-

-

... More
Provision for Incinerator

1

-

-

... More
Provision for supply and fixing of wash basin

1

-

-

... More
Supplying and fixing in position of IWC of size 580x440mm, white glazed earthen ware of approved qualtiy with "P" or "S" trap confirming to IS:2556-Part X!! With sand cushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete 1:2:5(one part of lime, two parts of sand and five parts of brick jelly)100mm thick and finishing the top to required slope and including giving necessary connection to pvc pipes by dismandling brick masonry, RCC roof or floor slab and making good the disturbed portion to original condition without leakage etc., complete complying with standard specification and as directed by the departmental officer

1

-

-

... More
Supplying and fixing in position white glazed EWC of best quality and approved make with 100mm "P" or "S" traps with double flapped right P.V.C seat cover with C.p brass hinges with 10.0litres PVC low level flushing tank with all internal fittings etc., all complete complying with standard specifications(white colour)

1

-

-

... More
Rain Water Harvesting

1

-

-

... More
Towards provision for Lock and key arrangements etc., all complete

1

-

-

... More
Provision of Name Board

1

-

-

... More
Construction of Girls Toilet at PUMS Naikuthi H/O Sittlingi

-

-

-

... More
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm.

21.36

-

-

... More
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete

6.14

-

-

... More
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement

12.8

-

-

... More
Filling the Basement with excavated earth other than sand etc., complete complying to standard specification.

2.98

-

-

... More
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.

2.98

-

-

... More
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Complying with standard specification.

11.83

-

-

... More
Supplying and Errecting cenering for sides and soffits including necessary supports and strurring up to 3.29m hight for plane surface in all floors with all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffened,welded with steel ang

10.17

-

-

... More
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS )

0.28

-

-

... More
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and

2.05

-

-

... More
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers

25.45

-

-

... More
Plastering with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.

6.36

-

-

... More
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.

90.65

-

-

... More
Pavinig the Floor with scratch proof antiskid tiles of size 200x200x20mm in cm 1:3,20mm thick.and pointing with whiote cement 0.40kg per sqm mixed with colouring pigments to suit the colour of the tiles including finishing the joints neatly complying with

13.14

-

-

... More
Dadooing walls with Glazed tiles of any colour and any size laid in cm 1:2,10 mm tk.and pointing with white cement 0.40 kg per sqm mixed with colouring pigments to siut the colour of the tiles including finishing the joints neatly complying with standared

23.96

-

-

... More
Distembering two coats using best approved Interiar oil destember with one coat primer over New plastered Surface including cost and conveyance of materials and labour charges etc complete

24.95

-

-

... More
Exterior emulsion two coats using best freshly burnt shell lime ain all the floors using best quality and approved verity of colouring pigments including cost of lime,colouring pigments,fevicol type gum,brushes,scaffolding etc.,complete.

53.66

-

-

... More
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specific

8.1

-

-

... More
Provision for labour charges for fixing of sanitary pipes and specials including all cost etc., complete

1

-

-

... More
Transport Charges

1

-

-

... More
Provision for Labour charges for fixing of doors,windows ,Jolly including all cost etc., complete

1

-

-

... More
Provision for Towel rail, soap dish, buckets etc., all complete

1

-

-

... More
Supply and fixing of Mirror PVC / Fiber glass with frame including all cost etc., complete 600mm x 450mm

1

-

-

... More
Hand Rail for Ramp 40mm GI

-

-

-

... More
50mm GI pipe

65

-

-

... More
50mm GI pipe Coupling

10

-

-

... More
50mm GI Bend

24

-

-

... More
Provision for 1000 litre HDPE tank

1

-

-

... More
Towards cost supply and fixing of MS Door of size 0.75x1.80m of approximate weight of 21 to 23 kgs as per standard specification including all cost and conveyance etc., all complete

3

-

-

... More
Towards cost supply and fixing of RCC Jolly including all cost and conveyance etc.,all complete

2

-

-

... More
Provision for Incinerator

1

-

-

... More
Provision for supply and fixing of wash basin

1

-

-

... More
Supplying and fixing in position of IWC of size 580x440mm, white glazed earthen ware of approved qualtiy with "P" or "S" trap confirming to IS:2556-Part X!! With sand cushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete 1:2:5(one part of lime, two parts of sand and five parts of brick jelly)100mm thick and finishing the top to required slope and including giving necessary connection to pvc pipes by dismandling brick masonry, RCC roof or floor slab and making good the disturbed portion to original condition without leakage etc., complete complying with standard specification and as directed by the departmental officer

1

-

-

... More
Supplying and fixing in position white glazed EWC of best quality and approved make with 100mm "P" or "S" traps with double flapped right P.V.C seat cover with C.p brass hinges with 10.0litres PVC low level flushing tank with all internal fittings etc., all complete complying with standard specifications(white colour)

1

-

-

... More
Rain Water Harvesting

1

-

-

... More
Towards provision for Lock and key arrangements etc., all complete

1

-

-

... More
Provision of Name Board

1

-

-

... More
Construction of Girls Toilet at PUES Sittiling H/O Sittling

-

-

-

... More
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm.

21.36

-

-

... More
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete

6.14

-

-

... More
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement

12.8

-

-

... More
Filling the Basement with excavated earth other than sand etc., complete complying to standard specification.

2.98

-

-

... More
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.

2.98

-

-

... More
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Complying with standard specification.

11.83

-

-

... More
Supplying and Errecting cenering for sides and soffits including necessary supports and strurring up to 3.29m hight for plane surface in all floors with all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffened,welded with steel ang

10.17

-

-

... More
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS )

0.28

-

-

... More
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and

2.05

-

-

... More
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers

25.45

-

-

... More
Plastering with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.

6.36

-

-

... More
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.

90.65

-

-

... More
Pavinig the Floor with scratch proof antiskid tiles of size 200x200x20mm in cm 1:3,20mm thick.and pointing with whiote cement 0.40kg per sqm mixed with colouring pigments to suit the colour of the tiles including finishing the joints neatly complying with

13.14

-

-

... More
Dadooing walls with Glazed tiles of any colour and any size laid in cm 1:2,10 mm tk.and pointing with white cement 0.40 kg per sqm mixed with colouring pigments to siut the colour of the tiles including finishing the joints neatly complying with standared

23.96

-

-

... More
Distembering two coats using best approved Interiar oil destember with one coat primer over New plastered Surface including cost and conveyance of materials and labour charges etc complete

24.95

-

-

... More
Exterior emulsion two coats using best freshly burnt shell lime ain all the floors using best quality and approved verity of colouring pigments including cost of lime,colouring pigments,fevicol type gum,brushes,scaffolding etc.,complete.

53.66

-

-

... More
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specific

8.1

-

-

... More
Provision for labour charges for fixing of sanitary pipes and specials including all cost etc., complete

1

-

-

... More
Transport Charges

1

-

-

... More
Provision for Labour charges for fixing of doors,windows ,Jolly including all cost etc., complete

1

-

-

... More
Provision for Towel rail, soap dish, buckets etc., all complete

1

-

-

... More
Supply and fixing of Mirror PVC / Fiber glass with frame including all cost etc., complete 600mm x 450mm

1

-

-

... More
Hand Rail for Ramp 40mm GI

-

-

-

... More
50mm GI pipe

65

-

-

... More
50mm GI pipe Coupling

10

-

-

... More
50mm GI Bend

24

-

-

... More
Provision for 1000 litre HDPE tank

1

-

-

... More
Towards cost supply and fixing of MS Door of size 0.75x1.80m of approximate weight of 21 to 23 kgs as per standard specification including all cost and conveyance etc., all complete

3

-

-

... More
Towards cost supply and fixing of RCC Jolly including all cost and conveyance etc.,all complete

2

-

-

... More
Provision for Incinerator

1

-

-

... More
Provision for supply and fixing of wash basin

1

-

-

... More
Supplying and fixing in position of IWC of size 580x440mm, white glazed earthen ware of approved qualtiy with "P" or "S" trap confirming to IS:2556-Part X!! With sand cushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete 1:2:5(one part of lime, two parts of sand and five parts of brick jelly)100mm thick and finishing the top to required slope and including giving necessary connection to pvc pipes by dismandling brick masonry, RCC roof or floor slab and making good the disturbed portion to original condition without leakage etc., complete complying with standard specification and as directed by the departmental officer

1

-

-

... More
Supplying and fixing in position white glazed EWC of best quality and approved make with 100mm "P" or "S" traps with double flapped right P.V.C seat cover with C.p brass hinges with 10.0litres PVC low level flushing tank with all internal fittings etc., all complete complying with standard specifications(white colour)

1

-

-

... More
Rain Water Harvesting

1

-

-

... More
Towards provision for Lock and key arrangements etc., all complete

1

-

-

... More
Provision of Name Board

1

-

-

... More
Construction of Girls Toilet at PUES Mobripatti H/O Mobripatti

-

-

-

... More
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm.

21.36

-

-

... More
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete

6.14

-

-

... More
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement

12.8

-

-

... More
Filling the Basement with excavated earth other than sand etc., complete complying to standard specification.

2.98

-

-

... More
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.

2.98

-

-

... More
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Complying with standard specification.

11.83

-

-

... More
Supplying and Errecting cenering for sides and soffits including necessary supports and strurring up to 3.29m hight for plane surface in all floors with all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffened,welded with steel ang

10.17

-

-

... More
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS )

0.28

-

-

... More
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and

2.05

-

-

... More
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers

25.45

-

-

... More
Plastering with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.

6.36

-

-

... More
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.

90.65

-

-

... More
Pavinig the Floor with scratch proof antiskid tiles of size 200x200x20mm in cm 1:3,20mm thick.and pointing with whiote cement 0.40kg per sqm mixed with colouring pigments to suit the colour of the tiles including finishing the joints neatly complying with

13.14

-

-

... More
Dadooing walls with Glazed tiles of any colour and any size laid in cm 1:2,10 mm tk.and pointing with white cement 0.40 kg per sqm mixed with colouring pigments to siut the colour of the tiles including finishing the joints neatly complying with standared

23.96

-

-

... More
Distembering two coats using best approved Interiar oil destember with one coat primer over New plastered Surface including cost and conveyance of materials and labour charges etc complete

24.95

-

-

... More
Exterior emulsion two coats using best freshly burnt shell lime ain all the floors using best quality and approved verity of colouring pigments including cost of lime,colouring pigments,fevicol type gum,brushes,scaffolding etc.,complete.

53.66

-

-

... More
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specific

8.1

-

-

... More
Provision for labour charges for fixing of sanitary pipes and specials including all cost etc., complete

1

-

-

... More
Transport Charges

1

-

-

... More
Provision for Labour charges for fixing of doors,windows ,Jolly including all cost etc., complete

1

-

-

... More
Provision for Towel rail, soap dish, buckets etc., all complete

1

-

-

... More
Supply and fixing of Mirror PVC / Fiber glass with frame including all cost etc., complete 600mm x 450mm

1

-

-

... More
Hand Rail for Ramp 40mm GI

-

-

-

... More
50mm GI pipe

115

-

-

... More
50mm GI pipe Coupling

22

-

-

... More
50mm GI Bend

24

-

-

... More
Provision for 1000 litre HDPE tank

1

-

-

... More
Towards cost supply and fixing of MS Door of size 0.75x1.80m of approximate weight of 21 to 23 kgs as per standard specification including all cost and conveyance etc., all complete

3

-

-

... More
Towards cost supply and fixing of RCC Jolly including all cost and conveyance etc.,all complete

2

-

-

... More
Provision for Incinerator

1

-

-

... More
Provision for supply and fixing of wash basin

1

-

-

... More
Supplying and fixing in position of IWC of size 580x440mm, white glazed earthen ware of approved qualtiy with "P" or "S" trap confirming to IS:2556-Part X!! With sand cushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete 1:2:5(one part of lime, two parts of sand and five parts of brick jelly)100mm thick and finishing the top to required slope and including giving necessary connection to pvc pipes by dismandling brick masonry, RCC roof or floor slab and making good the disturbed portion to original condition without leakage etc., complete complying with standard specification and as directed by the departmental officer

1

-

-

... More
Supplying and fixing in position white glazed EWC of best quality and approved make with 100mm "P" or "S" traps with double flapped right P.V.C seat cover with C.p brass hinges with 10.0litres PVC low level flushing tank with all internal fittings etc., all complete complying with standard specifications(white colour)

1

-

-

... More
Rain Water Harvesting

1

-

-

... More
Towards provision for Lock and key arrangements etc., all complete

1

-

-

... More
Provision of Name Board

1

-

-

... More
Construction of Girls Toilet at PUES Soriyampatti H/O Mobripatti

-

-

-

... More
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm.

21.36

-

-

... More
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete

6.14

-

-

... More
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement

12.8

-

-

... More
Filling the Basement with excavated earth other than sand etc., complete complying to standard specification.

2.98

-

-

... More
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.

2.98

-

-

... More
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Complying with standard specification.

11.83

-

-

... More
Supplying and Errecting cenering for sides and soffits including necessary supports and strurring up to 3.29m hight for plane surface in all floors with all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffened,welded with steel ang

10.17

-

-

... More
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS )

0.28

-

-

... More
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and

2.05

-

-

... More
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers

25.45

-

-

... More
Plastering with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.

6.36

-

-

... More
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.

90.65

-

-

... More
Pavinig the Floor with scratch proof antiskid tiles of size 200x200x20mm in cm 1:3,20mm thick.and pointing with whiote cement 0.40kg per sqm mixed with colouring pigments to suit the colour of the tiles including finishing the joints neatly complying with

13.14

-

-

... More
Dadooing walls with Glazed tiles of any colour and any size laid in cm 1:2,10 mm tk.and pointing with white cement 0.40 kg per sqm mixed with colouring pigments to siut the colour of the tiles including finishing the joints neatly complying with standared

23.96

-

-

... More
Distembering two coats using best approved Interiar oil destember with one coat primer over New plastered Surface including cost and conveyance of materials and labour charges etc complete

24.95

-

-

... More
Exterior emulsion two coats using best freshly burnt shell lime ain all the floors using best quality and approved verity of colouring pigments including cost of lime,colouring pigments,fevicol type gum,brushes,scaffolding etc.,complete.

53.66

-

-

... More
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specific

8.1

-

-

... More
Provision for labour charges for fixing of sanitary pipes and specials including all cost etc., complete

1

-

-

... More
Transport Charges

1

-

-

... More
Provision for Labour charges for fixing of doors,windows ,Jolly including all cost etc., complete

1

-

-

... More
Provision for Towel rail, soap dish, buckets etc., all complete

1

-

-

... More
Supply and fixing of Mirror PVC / Fiber glass with frame including all cost etc., complete 600mm x 450mm

1

-

-

... More
Hand Rail for Ramp 40mm GI

-

-

-

... More
50mm GI pipe

115

-

-

... More
50mm GI pipe Coupling

22

-

-

... More
50mm GI Bend

24

-

-

... More
Provision for 1000 litre HDPE tank

1

-

-

... More
Towards cost supply and fixing of MS Door of size 0.75x1.80m of approximate weight of 21 to 23 kgs as per standard specification including all cost and conveyance etc., all complete

3

-

-

... More
Towards cost supply and fixing of RCC Jolly including all cost and conveyance etc.,all complete

2

-

-

... More
Provision for Incinerator

1

-

-

... More
Provision for supply and fixing of wash basin

1

-

-

... More
Supplying and fixing in position of IWC of size 580x440mm, white glazed earthen ware of approved qualtiy with "P" or "S" trap confirming to IS:2556-Part X!! With sand cushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete 1:2:5(one part of lime, two parts of sand and five parts of brick jelly)100mm thick and finishing the top to required slope and including giving necessary connection to pvc pipes by dismandling brick masonry, RCC roof or floor slab and making good the disturbed portion to original condition without leakage etc., complete complying with standard specification and as directed by the departmental officer

1

-

-

... More
Supplying and fixing in position white glazed EWC of best quality and approved make with 100mm "P" or "S" traps with double flapped right P.V.C seat cover with C.p brass hinges with 10.0litres PVC low level flushing tank with all internal fittings etc., all complete complying with standard specifications(white colour)

1

-

-

... More
Rain Water Harvesting

1

-

-

... More
Towards provision for Lock and key arrangements etc., all complete

1

-

-

... More
Provision of Name Board

1

-

-

... More
Construction of Girls Toilet at Vedakattamaduvu PUES H/O Vedakattamaduvu

-

-

-

... More
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm.

21.36

-

-

... More
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete

6.14

-

-

... More
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement

12.8

-

-

... More
Filling the Basement with excavated earth other than sand etc., complete complying to standard specification.

2.98

-

-

... More
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.

2.98

-

-

... More
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Complying with standard specification.

11.83

-

-

... More
Supplying and Errecting cenering for sides and soffits including necessary supports and strurring up to 3.29m hight for plane surface in all floors with all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffened,welded with steel ang

10.17

-

-

... More
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS )

0.28

-

-

... More
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and

2.05

-

-

... More
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers

25.45

-

-

... More
Plastering with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.

6.36

-

-

... More
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.

90.65

-

-

... More
Pavinig the Floor with scratch proof antiskid tiles of size 200x200x20mm in cm 1:3,20mm thick.and pointing with whiote cement 0.40kg per sqm mixed with colouring pigments to suit the colour of the tiles including finishing the joints neatly complying with

13.14

-

-

... More
Dadooing walls with Glazed tiles of any colour and any size laid in cm 1:2,10 mm tk.and pointing with white cement 0.40 kg per sqm mixed with colouring pigments to siut the colour of the tiles including finishing the joints neatly complying with standared

23.96

-

-

... More
Distembering two coats using best approved Interiar oil destember with one coat primer over New plastered Surface including cost and conveyance of materials and labour charges etc complete

24.95

-

-

... More
Exterior emulsion two coats using best freshly burnt shell lime ain all the floors using best quality and approved verity of colouring pigments including cost of lime,colouring pigments,fevicol type gum,brushes,scaffolding etc.,complete.

53.66

-

-

... More
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specific

8.1

-

-

... More
Provision for labour charges for fixing of sanitary pipes and specials including all cost etc., complete

1

-

-

... More
Transport Charges

1

-

-

... More
Provision for Labour charges for fixing of doors,windows ,Jolly including all cost etc., complete

1

-

-

... More
Provision for Towel rail, soap dish, buckets etc., all complete

1

-

-

... More
Supply and fixing of Mirror PVC / Fiber glass with frame including all cost etc., complete 600mm x 450mm

1

-

-

... More
Hand Rail for Ramp 40mm GI

-

-

-

... More
50mm GI pipe

100

-

-

... More
50mm GI pipe Coupling

18

-

-

... More
50mm GI Bend

24

-

-

... More
Provision for 1000 litre HDPE tank

1

-

-

... More
Towards cost supply and fixing of MS Door of size 0.75x1.80m of approximate weight of 21 to 23 kgs as per standard specification including all cost and conveyance etc., all complete

3

-

-

... More
Towards cost supply and fixing of RCC Jolly including all cost and conveyance etc.,all complete

2

-

-

... More
Provision for Incinerator

1

-

-

... More
Provision for supply and fixing of wash basin

1

-

-

... More
Supplying and fixing in position of IWC of size 580x440mm, white glazed earthen ware of approved qualtiy with "P" or "S" trap confirming to IS:2556-Part X!! With sand cushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete 1:2:5(one part of lime, two parts of sand and five parts of brick jelly)100mm thick and finishing the top to required slope and including giving necessary connection to pvc pipes by dismandling brick masonry, RCC roof or floor slab and making good the disturbed portion to original condition without leakage etc., complete complying with standard specification and as directed by the departmental officer

1

-

-

... More
Supplying and fixing in position white glazed EWC of best quality and approved make with 100mm "P" or "S" traps with double flapped right P.V.C seat cover with C.p brass hinges with 10.0litres PVC low level flushing tank with all internal fittings etc., all complete complying with standard specifications(white colour)

1

-

-

... More
Rain Water Harvesting

1

-

-

... More
Towards provision for Lock and key arrangements etc., all complete

1

-

-

... More
Provision of Name Board

1

-

-

... More
Construction of Boys Toilet at PUMS Alampadi H/O Vedakattamaduvu

-

-

-

... More
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm.

29.18

-

-

... More
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete

6.83

-

-

... More
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement

14.5

-

-

... More
Filling the Basement with excavated earth other than sand etc., complete complying to standard specification.

7.72

-

-

... More
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Complying with standard specification.

17.23

-

-

... More
Supplying and Errecting cenering for sides and soffits including necessary supports and strurring up to 3.29m hight for plane surface in all floors with all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffened,welded with steel ang

14.42

-

-

... More
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS )

0.18

-

-

... More
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and

2.25

-

-

... More
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete

0.48

-

-

... More
Supplying and fixing in position of IWC of size 580x440mm, white glazed earthen ware of approved qualtiy with "P" or "S" trap confirming to IS:2556-Part X!! With sand cushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete 1:2:5(one part of lime, two parts of sand and five parts of brick jelly)100mm thick and finishing the top to required slope and including giving necessary connection to pvc pipes by dismandling brick masonry, RCC roof or floor slab and making good the disturbed portion to original condition without leakage etc., complete complying with standard specification and as directed by the departmental officer

1

-

-

... More
Supplying and fixing in position white glazed EWC of best quality and approved make with 100mm "P" or "S" traps with double flapped right P.V.C seat cover with C.p brass hinges with 10.0litres PVC low level flushing tank with all internal fittings etc., all complete complying with standard specifications(white colour)

1

-

-

... More
Plastering with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.

12.76

-

-

... More
Plastering with Cement Mortar 1:4 (one cement and four sand ) 20mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.

35.87

-

-

... More
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.

117.17

-

-

... More
Pavinig the Floor with scratch proof antiskid tiles of size 200x200x20mm in cm 1:3,20mm thick.and pointing with whiote cement 0.40kg per sqm mixed with colouring pigments to suit the colour of the tiles including finishing the joints neatly complying with

17.14

-

-

... More
Dadooing walls with Glazed tiles of any colour and any size laid in cm 1:2,10 mm tk.and pointing with white cement 0.40 kg per sqm mixed with colouring pigments to siut the colour of the tiles including finishing the joints neatly complying with standared

25.31

-

-

... More
Towards cost supply and fixing of MS Door of size 0.75x1.80m of approximate weight of 21 to 23 kgs as per standard specification including all cost and conveyance etc., all complete

3

-

-

... More
Distembering two coats using best approved Interiar oil destember with one coat primer over New plastered Surface including cost and conveyance of materials and labour charges etc complete

5.94

-

-

... More
Exterior emulsion two coats using best freshly burnt shell lime ain all the floors using best quality and approved verity of colouring pigments including cost of lime,colouring pigments,fevicol type gum,brushes,scaffolding etc.,complete.

75.65

-

-

... More
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specific

9.9

-

-

... More
Provision for labour charges for fixing of sanitary pipes and specials including all cost etc., complete

1

-

-

... More
Provision for 1000 litre HDPE tank

1

-

-

... More
Towards cost supply and fixing of RCC Jolly including all cost and conveyance etc.,all complete

2

-

-

... More
Leach pit cover slab

2

-

-

... More
Supply and fixing of hand rail including all cost and materials at site etc., complete

2

-

-

... More
Rain Water Harvesting

1

-

-

... More
Provision for supply and fixing of wash basin

1

-

-

... More
Photo Charges

1

-

-

... More
Provision of Name Board

1

-

-

... More
Construction of Girls Toilet at PUMS Kongavembu H/O Kongavembu

-

-

-

... More
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm.

21.36

-

-

... More
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete

6.14

-

-

... More
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement

12.8

-

-

... More
Filling the Basement with excavated earth other than sand etc., complete complying to standard specification.

2.98

-

-

... More
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.

2.98

-

-

... More
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Complying with standard specification.

11.83

-

-

... More
Supplying and Errecting cenering for sides and soffits including necessary supports and strurring up to 3.29m hight for plane surface in all floors with all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffened,welded with steel ang

10.17

-

-

... More
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS )

0.28

-

-

... More
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and

2.05

-

-

... More
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers

25.45

-

-

... More
Plastering with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.

6.36

-

-

... More
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.

90.65

-

-

... More
Pavinig the Floor with scratch proof antiskid tiles of size 200x200x20mm in cm 1:3,20mm thick.and pointing with whiote cement 0.40kg per sqm mixed with colouring pigments to suit the colour of the tiles including finishing the joints neatly complying with

13.14

-

-

... More
Dadooing walls with Glazed tiles of any colour and any size laid in cm 1:2,10 mm tk.and pointing with white cement 0.40 kg per sqm mixed with colouring pigments to siut the colour of the tiles including finishing the joints neatly complying with standared

23.96

-

-

... More
Distembering two coats using best approved Interiar oil destember with one coat primer over New plastered Surface including cost and conveyance of materials and labour charges etc complete

24.95

-

-

... More
Exterior emulsion two coats using best freshly burnt shell lime ain all the floors using best quality and approved verity of colouring pigments including cost of lime,colouring pigments,fevicol type gum,brushes,scaffolding etc.,complete.

53.66

-

-

... More
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specific

8.1

-

-

... More
Provision for labour charges for fixing of sanitary pipes and specials including all cost etc., complete

1

-

-

... More
Transport Charges

1

-

-

... More
Provision for Labour charges for fixing of doors,windows ,Jolly including all cost etc., complete

1

-

-

... More
Provision for Towel rail, soap dish, buckets etc., all complete

1

-

-

... More
Supply and fixing of Mirror PVC / Fiber glass with frame including all cost etc., complete 600mm x 450mm

1

-

-

... More
Hand Rail for Ramp 40mm GI

-

-

-

... More
50mm GI pipe

108

-

-

... More
50mm GI pipe Coupling

20

-

-

... More
50mm GI Bend

24

-

-

... More
Provision for 1000 litre HDPE tank

1

-

-

... More
Towards cost supply and fixing of MS Door of size 0.75x1.80m of approximate weight of 21 to 23 kgs as per standard specification including all cost and conveyance etc., all complete

3

-

-

... More
Towards cost supply and fixing of RCC Jolly including all cost and conveyance etc.,all complete

2

-

-

... More
Provision for Incinerator

1

-

-

... More
Provision for supply and fixing of wash basin

1

-

-

... More
Supplying and fixing in position of IWC of size 580x440mm, white glazed earthen ware of approved qualtiy with "P" or "S" trap confirming to IS:2556-Part X!! With sand cushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete 1:2:5(one part of lime, two parts of sand and five parts of brick jelly)100mm thick and finishing the top to required slope and including giving necessary connection to pvc pipes by dismandling brick masonry, RCC roof or floor slab and making good the disturbed portion to original condition without leakage etc., complete complying with standard specification and as directed by the departmental officer

1

-

-

... More
Supplying and fixing in position white glazed EWC of best quality and approved make with 100mm "P" or "S" traps with double flapped right P.V.C seat cover with C.p brass hinges with 10.0litres PVC low level flushing tank with all internal fittings etc., all complete complying with standard specifications(white colour)

1

-

-

... More
Rain Water Harvesting

1

-

-

... More
Towards provision for Lock and key arrangements etc., all complete

1

-

-

... More
Provision of Name Board

1

-

-

... More
Construction of Girls Toilet at PUMS Sakkilipatti H/O Kongavembu

-

-

-

... More
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm.

21.36

-

-

... More
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete

6.14

-

-

... More
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement

12.8

-

-

... More
Filling the Basement with excavated earth other than sand etc., complete complying to standard specification.

2.98

-

-

... More
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.

2.98

-

-

... More
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Complying with standard specification.

11.83

-

-

... More
Supplying and Errecting cenering for sides and soffits including necessary supports and strurring up to 3.29m hight for plane surface in all floors with all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffened,welded with steel ang

10.17

-

-

... More
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS )

0.28

-

-

... More
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and

2.05

-

-

... More
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers

25.45

-

-

... More
Plastering with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.

6.36

-

-

... More
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.

90.65

-

-

... More
Pavinig the Floor with scratch proof antiskid tiles of size 200x200x20mm in cm 1:3,20mm thick.and pointing with whiote cement 0.40kg per sqm mixed with colouring pigments to suit the colour of the tiles including finishing the joints neatly complying with

13.14

-

-

... More
Dadooing walls with Glazed tiles of any colour and any size laid in cm 1:2,10 mm tk.and pointing with white cement 0.40 kg per sqm mixed with colouring pigments to siut the colour of the tiles including finishing the joints neatly complying with standared

23.96

-

-

... More
Distembering two coats using best approved Interiar oil destember with one coat primer over New plastered Surface including cost and conveyance of materials and labour charges etc complete

24.95

-

-

... More
Exterior emulsion two coats using best freshly burnt shell lime ain all the floors using best quality and approved verity of colouring pigments including cost of lime,colouring pigments,fevicol type gum,brushes,scaffolding etc.,complete.

53.66

-

-

... More
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specific

8.1

-

-

... More
Provision for labour charges for fixing of sanitary pipes and specials including all cost etc., complete

1

-

-

... More
Transport Charges

1

-

-

... More
Provision for Labour charges for fixing of doors,windows ,Jolly including all cost etc., complete

1

-

-

... More
Provision for Towel rail, soap dish, buckets etc., all complete

1

-

-

... More
Supply and fixing of Mirror PVC / Fiber glass with frame including all cost etc., complete 600mm x 450mm

1

-

-

... More
Hand Rail for Ramp 40mm GI

-

-

-

... More
50mm GI pipe

108

-

-

... More
50mm GI pipe Coupling

20

-

-

... More
50mm GI Bend

24

-

-

... More
Provision for 1000 litre HDPE tank

1

-

-

... More
Towards cost supply and fixing of MS Door of size 0.75x1.80m of approximate weight of 21 to 23 kgs as per standard specification including all cost and conveyance etc., all complete

3

-

-

... More
Towards cost supply and fixing of RCC Jolly including all cost and conveyance etc.,all complete

2

-

-

... More
Provision for Incinerator

1

-

-

... More
Provision for supply and fixing of wash basin

1

-

-

... More
Supplying and fixing in position of IWC of size 580x440mm, white glazed earthen ware of approved qualtiy with "P" or "S" trap confirming to IS:2556-Part X!! With sand cushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete 1:2:5(one part of lime, two parts of sand and five parts of brick jelly)100mm thick and finishing the top to required slope and including giving necessary connection to pvc pipes by dismandling brick masonry, RCC roof or floor slab and making good the disturbed portion to original condition without leakage etc., complete complying with standard specification and as directed by the departmental officer

1

-

-

... More
Supplying and fixing in position white glazed EWC of best quality and approved make with 100mm "P" or "S" traps with double flapped right P.V.C seat cover with C.p brass hinges with 10.0litres PVC low level flushing tank with all internal fittings etc., all complete complying with standard specifications(white colour)

1

-

-

... More
Rain Water Harvesting

1

-

-

... More
Towards provision for Lock and key arrangements etc., all complete

1

-

-

... More
Provision of Name Board

1

-

-

... More
Construction of Girls Toilet at PUMS Keelanoor H/O Sellampatti

-

-

-

... More
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm.

21.36

-

-

... More
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete

6.14

-

-

... More
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement

12.8

-

-

... More
Filling the Basement with excavated earth other than sand etc., complete complying to standard specification.

2.98

-

-

... More
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.

2.98

-

-

... More
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Complying with standard specification.

11.83

-

-

... More
Supplying and Errecting cenering for sides and soffits including necessary supports and strurring up to 3.29m hight for plane surface in all floors with all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffened,welded with steel ang

10.17

-

-

... More
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS )

0.28

-

-

... More
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and

2.05

-

-

... More
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers

25.45

-

-

... More
Plastering with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.

6.36

-

-

... More
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.

90.65

-

-

... More
Pavinig the Floor with scratch proof antiskid tiles of size 200x200x20mm in cm 1:3,20mm thick.and pointing with whiote cement 0.40kg per sqm mixed with colouring pigments to suit the colour of the tiles including finishing the joints neatly complying with

13.14

-

-

... More
Dadooing walls with Glazed tiles of any colour and any size laid in cm 1:2,10 mm tk.and pointing with white cement 0.40 kg per sqm mixed with colouring pigments to siut the colour of the tiles including finishing the joints neatly complying with standared

23.96

-

-

... More
Distembering two coats using best approved Interiar oil destember with one coat primer over New plastered Surface including cost and conveyance of materials and labour charges etc complete

24.95

-

-

... More
Exterior emulsion two coats using best freshly burnt shell lime ain all the floors using best quality and approved verity of colouring pigments including cost of lime,colouring pigments,fevicol type gum,brushes,scaffolding etc.,complete.

53.66

-

-

... More
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specific

8.1

-

-

... More
Provision for labour charges for fixing of sanitary pipes and specials including all cost etc., complete

1

-

-

... More
Transport Charges

1

-

-

... More
Provision for Labour charges for fixing of doors,windows ,Jolly including all cost etc., complete

1

-

-

... More
Provision for Towel rail, soap dish, buckets etc., all complete

1

-

-

... More
Supply and fixing of Mirror PVC / Fiber glass with frame including all cost etc., complete 600mm x 450mm

1

-

-

... More
Hand Rail for Ramp 40mm GI

-

-

-

... More
50mm GI pipe

120

-

-

... More
50mm GI pipe Coupling

18

-

-

... More
50mm GI Bend

24

-

-

... More
Provision for 1000 litre HDPE tank

1

-

-

... More
Towards cost supply and fixing of MS Door of size 0.75x1.80m of approximate weight of 21 to 23 kgs as per standard specification including all cost and conveyance etc., all complete

3

-

-

... More
Towards cost supply and fixing of RCC Jolly including all cost and conveyance etc.,all complete

2

-

-

... More
Provision for Incinerator

1

-

-

... More
Provision for supply and fixing of wash basin

1

-

-

... More
Supplying and fixing in position of IWC of size 580x440mm, white glazed earthen ware of approved qualtiy with "P" or "S" trap confirming to IS:2556-Part X!! With sand cushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete 1:2:5(one part of lime, two parts of sand and five parts of brick jelly)100mm thick and finishing the top to required slope and including giving necessary connection to pvc pipes by dismandling brick masonry, RCC roof or floor slab and making good the disturbed portion to original condition without leakage etc., complete complying with standard specification and as directed by the departmental officer

1

-

-

... More
Supplying and fixing in position white glazed EWC of best quality and approved make with 100mm "P" or "S" traps with double flapped right P.V.C seat cover with C.p brass hinges with 10.0litres PVC low level flushing tank with all internal fittings etc., all complete complying with standard specifications(white colour)

1

-

-

... More
Rain Water Harvesting

1

-

-

... More
Towards provision for Lock and key arrangements etc., all complete

1

-

-

... More
Provision of Name Board

1

-

-

... More
Construction of Boys Toilet at PUMS Keelanur H/O Sellampatti

-

-

-

... More
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm.

29.18

-

-

... More
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete

6.83

-

-

... More
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement

14.5

-

-

... More
Filling the Basement with excavated earth other than sand etc., complete complying to standard specification.

7.72

-

-

... More
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Complying with standard specification.

17.23

-

-

... More
Supplying and Errecting cenering for sides and soffits including necessary supports and strurring up to 3.29m hight for plane surface in all floors with all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffened,welded with steel ang

14.42

-

-

... More
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS )

0.18

-

-

... More
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and

2.25

-

-

... More
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete

0.48

-

-

... More
Supplying and fixing in position of IWC of size 580x440mm, white glazed earthen ware of approved qualtiy with "P" or "S" trap confirming to IS:2556-Part X!! With sand cushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete 1:2:5(one part of lime, two parts of sand and five parts of brick jelly)100mm thick and finishing the top to required slope and including giving necessary connection to pvc pipes by dismandling brick masonry, RCC roof or floor slab and making good the disturbed portion to original condition without leakage etc., complete complying with standard specification and as directed by the departmental officer

1

-

-

... More
Supplying and fixing in position white glazed EWC of best quality and approved make with 100mm "P" or "S" traps with double flapped right P.V.C seat cover with C.p brass hinges with 10.0litres PVC low level flushing tank with all internal fittings etc., all complete complying with standard specifications(white colour)

1

-

-

... More
Plastering with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.

12.76

-

-

... More
Plastering with Cement Mortar 1:4 (one cement and four sand ) 20mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.

35.87

-

-

... More
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.

117.17

-

-

... More
Pavinig the Floor with scratch proof antiskid tiles of size 200x200x20mm in cm 1:3,20mm thick.and pointing with whiote cement 0.40kg per sqm mixed with colouring pigments to suit the colour of the tiles including finishing the joints neatly complying with

17.14

-

-

... More
Dadooing walls with Glazed tiles of any colour and any size laid in cm 1:2,10 mm tk.and pointing with white cement 0.40 kg per sqm mixed with colouring pigments to siut the colour of the tiles including finishing the joints neatly complying with standared

25.31

-

-

... More
Towards cost supply and fixing of MS Door of size 0.75x1.80m of approximate weight of 21 to 23 kgs as per standard specification including all cost and conveyance etc., all complete

3

-

-

... More
Distembering two coats using best approved Interiar oil destember with one coat primer over New plastered Surface including cost and conveyance of materials and labour charges etc complete

5.94

-

-

... More
Exterior emulsion two coats using best freshly burnt shell lime ain all the floors using best quality and approved verity of colouring pigments including cost of lime,colouring pigments,fevicol type gum,brushes,scaffolding etc.,complete.

75.65

-

-

... More
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specific

9.9

-

-

... More
Provision for labour charges for fixing of sanitary pipes and specials including all cost etc., complete

1

-

-

... More
Provision for 1000 litre HDPE tank

1

-

-

... More
Towards cost supply and fixing of RCC Jolly including all cost and conveyance etc.,all complete

2

-

-

... More
Leach pit cover slab

2

-

-

... More
Supply and fixing of hand rail including all cost and materials at site etc., complete

2

-

-

... More
Rain Water Harvesting

1

-

-

... More
Provision for supply and fixing of wash basin

2

-

-

... More
Photo Charges

1

-

-

... More
Provision of Name Board

1

-

-

... More
Construction of Girls Toilet at PUES Nerupandakuppam H/O Agraharam

-

-

-

... More
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm.

21.36

-

-

... More
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete

6.14

-

-

... More
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement

12.8

-

-

... More
Filling the Basement with excavated earth other than sand etc., complete complying to standard specification.

2.98

-

-

... More
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.

2.98

-

-

... More
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Complying with standard specification.

11.83

-

-

... More
Supplying and Errecting cenering for sides and soffits including necessary supports and strurring up to 3.29m hight for plane surface in all floors with all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffened,welded with steel ang

10.17

-

-

... More
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS )

0.28

-

-

... More
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and

2.05

-

-

... More
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers

25.45

-

-

... More
Plastering with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.

6.36

-

-

... More
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.

90.65

-

-

... More
Pavinig the Floor with scratch proof antiskid tiles of size 200x200x20mm in cm 1:3,20mm thick.and pointing with whiote cement 0.40kg per sqm mixed with colouring pigments to suit the colour of the tiles including finishing the joints neatly complying with

13.14

-

-

... More
Dadooing walls with Glazed tiles of any colour and any size laid in cm 1:2,10 mm tk.and pointing with white cement 0.40 kg per sqm mixed with colouring pigments to siut the colour of the tiles including finishing the joints neatly complying with standared

23.96

-

-

... More
Distembering two coats using best approved Interiar oil destember with one coat primer over New plastered Surface including cost and conveyance of materials and labour charges etc complete

24.95

-

-

... More
Exterior emulsion two coats using best freshly burnt shell lime ain all the floors using best quality and approved verity of colouring pigments including cost of lime,colouring pigments,fevicol type gum,brushes,scaffolding etc.,complete.

53.66

-

-

... More
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specific

8.1

-

-

... More
Provision for labour charges for fixing of sanitary pipes and specials including all cost etc., complete

1

-

-

... More
Transport Charges

1

-

-

... More
Provision for Labour charges for fixing of doors,windows ,Jolly including all cost etc., complete

1

-

-

... More
Provision for Towel rail, soap dish, buckets etc., all complete

1

-

-

... More
Supply and fixing of Mirror PVC / Fiber glass with frame including all cost etc., complete 600mm x 450mm

1

-

-

... More
Hand Rail for Ramp 40mm GI

-

-

-

... More
50mm GI pipe

115

-

-

... More
50mm GI pipe Coupling

22

-

-

... More
50mm GI Bend

24

-

-

... More
Provision for 1000 litre HDPE tank

1

-

-

... More
Towards cost supply and fixing of MS Door of size 0.75x1.80m of approximate weight of 21 to 23 kgs as per standard specification including all cost and conveyance etc., all complete

3

-

-

... More
Towards cost supply and fixing of RCC Jolly including all cost and conveyance etc.,all complete

2

-

-

... More
Provision for Incinerator

1

-

-

... More
Provision for supply and fixing of wash basin

1

-

-

... More
Supplying and fixing in position of IWC of size 580x440mm, white glazed earthen ware of approved qualtiy with "P" or "S" trap confirming to IS:2556-Part X!! With sand cushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete 1:2:5(one part of lime, two parts of sand and five parts of brick jelly)100mm thick and finishing the top to required slope and including giving necessary connection to pvc pipes by dismandling brick masonry, RCC roof or floor slab and making good the disturbed portion to original condition without leakage etc., complete complying with standard specification and as directed by the departmental officer

1

-

-

... More
Supplying and fixing in position white glazed EWC of best quality and approved make with 100mm "P" or "S" traps with double flapped right P.V.C seat cover with C.p brass hinges with 10.0litres PVC low level flushing tank with all internal fittings etc., all complete complying with standard specifications(white colour)

1

-

-

... More
Rain Water Harvesting

1

-

-

... More
Towards provision for Lock and key arrangements etc., all complete

1

-

-

... More
Provision of Name Board

1

-

-

... More
Construction of Girls Toilet at PUES A.Velampatti H/O Agraharam

-

-

-

... More
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm.

21.36

-

-

... More
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete

6.14

-

-

... More
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement

12.8

-

-

... More
Filling the Basement with excavated earth other than sand etc., complete complying to standard specification.

2.98

-

-

... More
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.

2.98

-

-

... More
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Complying with standard specification.

11.83

-

-

... More
Supplying and Errecting cenering for sides and soffits including necessary supports and strurring up to 3.29m hight for plane surface in all floors with all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffened,welded with steel ang

10.17

-

-

... More
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS )

0.28

-

-

... More
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and

2.05

-

-

... More
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers

25.45

-

-

... More
Plastering with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.

6.36

-

-

... More
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.

90.65

-

-

... More
Pavinig the Floor with scratch proof antiskid tiles of size 200x200x20mm in cm 1:3,20mm thick.and pointing with whiote cement 0.40kg per sqm mixed with colouring pigments to suit the colour of the tiles including finishing the joints neatly complying with

13.14

-

-

... More
Dadooing walls with Glazed tiles of any colour and any size laid in cm 1:2,10 mm tk.and pointing with white cement 0.40 kg per sqm mixed with colouring pigments to siut the colour of the tiles including finishing the joints neatly complying with standared

23.96

-

-

... More
Distembering two coats using best approved Interiar oil destember with one coat primer over New plastered Surface including cost and conveyance of materials and labour charges etc complete

24.95

-

-

... More
Exterior emulsion two coats using best freshly burnt shell lime ain all the floors using best quality and approved verity of colouring pigments including cost of lime,colouring pigments,fevicol type gum,brushes,scaffolding etc.,complete.

53.66

-

-

... More
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specific

8.1

-

-

... More
Provision for labour charges for fixing of sanitary pipes and specials including all cost etc., complete

1

-

-

... More
Transport Charges

1

-

-

... More
Provision for Labour charges for fixing of doors,windows ,Jolly including all cost etc., complete

1

-

-

... More
Provision for Towel rail, soap dish, buckets etc., all complete

1

-

-

... More
Supply and fixing of Mirror PVC / Fiber glass with frame including all cost etc., complete 600mm x 450mm

1

-

-

... More
Hand Rail for Ramp 40mm GI

-

-

-

... More
50mm GI pipe

115

-

-

... More
50mm GI pipe Coupling

22

-

-

... More
50mm GI Bend

24

-

-

... More
Provision for 1000 litre HDPE tank

1

-

-

... More
Towards cost supply and fixing of MS Door of size 0.75x1.80m of approximate weight of 21 to 23 kgs as per standard specification including all cost and conveyance etc., all complete

3

-

-

... More
Towards cost supply and fixing of RCC Jolly including all cost and conveyance etc.,all complete

2

-

-

... More
Provision for Incinerator

1

-

-

... More
Provision for supply and fixing of wash basin

1

-

-

... More
Supplying and fixing in position of IWC of size 580x440mm, white glazed earthen ware of approved qualtiy with "P" or "S" trap confirming to IS:2556-Part X!! With sand cushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete 1:2:5(one part of lime, two parts of sand and five parts of brick jelly)100mm thick and finishing the top to required slope and including giving necessary connection to pvc pipes by dismandling brick masonry, RCC roof or floor slab and making good the disturbed portion to original condition without leakage etc., complete complying with standard specification and as directed by the departmental officer

1

-

-

... More
Supplying and fixing in position white glazed EWC of best quality and approved make with 100mm "P" or "S" traps with double flapped right P.V.C seat cover with C.p brass hinges with 10.0litres PVC low level flushing tank with all internal fittings etc., all complete complying with standard specifications(white colour)

1

-

-

... More
Rain Water Harvesting

1

-

-

... More
Towards provision for Lock and key arrangements etc., all complete

1

-

-

... More
Provision of Name Board

1

-

-

... More
Construction of Girls Toilet at Achalavadi PUMS H/O Achalvadi

-

-

-

... More
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm.

21.36

-

-

... More
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete

6.14

-

-

... More
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement

12.8

-

-

... More
Filling the Basement with excavated earth other than sand etc., complete complying to standard specification.

2.98

-

-

... More
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.

2.98

-

-

... More
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Complying with standard specification.

11.83

-

-

... More
Supplying and Errecting cenering for sides and soffits including necessary supports and strurring up to 3.29m hight for plane surface in all floors with all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffened,welded with steel ang

10.17

-

-

... More
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS )

0.28

-

-

... More
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and

2.05

-

-

... More
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers

25.45

-

-

... More
Plastering with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.

6.36

-

-

... More
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.

90.65

-

-

... More
Pavinig the Floor with scratch proof antiskid tiles of size 200x200x20mm in cm 1:3,20mm thick.and pointing with whiote cement 0.40kg per sqm mixed with colouring pigments to suit the colour of the tiles including finishing the joints neatly complying with

13.14

-

-

... More
Dadooing walls with Glazed tiles of any colour and any size laid in cm 1:2,10 mm tk.and pointing with white cement 0.40 kg per sqm mixed with colouring pigments to siut the colour of the tiles including finishing the joints neatly complying with standared

23.96

-

-

... More
Distembering two coats using best approved Interiar oil destember with one coat primer over New plastered Surface including cost and conveyance of materials and labour charges etc complete

24.95

-

-

... More
Exterior emulsion two coats using best freshly burnt shell lime ain all the floors using best quality and approved verity of colouring pigments including cost of lime,colouring pigments,fevicol type gum,brushes,scaffolding etc.,complete.

53.66

-

-

... More
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specific

8.1

-

-

... More
Provision for labour charges for fixing of sanitary pipes and specials including all cost etc., complete

1

-

-

... More
Transport Charges

1

-

-

... More
Provision for Labour charges for fixing of doors,windows ,Jolly including all cost etc., complete

1

-

-

... More
Provision for Towel rail, soap dish, buckets etc., all complete

1

-

-

... More
Supply and fixing of Mirror PVC / Fiber glass with frame including all cost etc., complete 600mm x 450mm

1

-

-

... More
Hand Rail for Ramp 40mm GI

-

-

-

... More
50mm GI pipe

120

-

-

... More
50mm GI pipe Coupling

18

-

-

... More
50mm GI Bend

24

-

-

... More
Provision for 1000 litre HDPE tank

1

-

-

... More
Towards cost supply and fixing of MS Door of size 0.75x1.80m of approximate weight of 21 to 23 kgs as per standard specification including all cost and conveyance etc., all complete

3

-

-

... More
Towards cost supply and fixing of RCC Jolly including all cost and conveyance etc.,all complete

2

-

-

... More
Provision for Incinerator

1

-

-

... More
Provision for supply and fixing of wash basin

1

-

-

... More
Supplying and fixing in position of IWC of size 580x440mm, white glazed earthen ware of approved qualtiy with "P" or "S" trap confirming to IS:2556-Part X!! With sand cushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete 1:2:5(one part of lime, two parts of sand and five parts of brick jelly)100mm thick and finishing the top to required slope and including giving necessary connection to pvc pipes by dismandling brick masonry, RCC roof or floor slab and making good the disturbed portion to original condition without leakage etc., complete complying with standard specification and as directed by the departmental officer

1

-

-

... More
Supplying and fixing in position white glazed EWC of best quality and approved make with 100mm "P" or "S" traps with double flapped right P.V.C seat cover with C.p brass hinges with 10.0litres PVC low level flushing tank with all internal fittings etc., all complete complying with standard specifications(white colour)

1

-

-

... More
Rain Water Harvesting

1

-

-

... More
Towards provision for Lock and key arrangements etc., all complete

1

-

-

... More
Provision of Name Board

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.