Pradhan Mantri Gram Sadak Yojana Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Civil And Construction
Excavation
Eprocure
Opening Date19 Jul 2022
Closing Date17 Aug 2022
Tender Amount₹ 59,50,000 
Notes
Download

Costs

Summary

Dharmapuri District - Improvements Of Eri (desilting, Repairs To Sluice Weir) Works 3 Nos In Nallampalli Block P12

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery - Channel having width up to 3.00 M

90

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery - Channel having width up to 3.00 to 10.00M

360

-

-

... More
Construction of Weir

-

-

-

... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

51.75

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

8.95

-

-

... More
Supplying erecting of steel centring for cover slab and sides using steel shutters including all charges etc complete

217.13

-

-

... More
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

68.86

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

27.76

-

-

... More
Construction of Sluice

-

-

-

... More
Dismantling without damaging the near by Structure if any, wall in Brick masonary

31.47

-

-

... More
Dismantling without damaging the near by Structure if any, Plain Cement Concrete

18.92

-

-

... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

34.6

-

-

... More
Collection and supply of M sand and filling conveyance to the siteand all labour charges for filling as per standard speecifications

13.01

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

21.04

-

-

... More
Supplying and Fixing of RCC HUME PIPES NP3 Class including cost of all

10

-

-

... More
Providing Cut Stone roughly dressed unsettle cement mortor 1:4 including cost of all

0.46

-

-

... More
Supplying erecting of steel centring for cover slab and sides using steel shutters including all charges etc complete - A

41.19

-

-

... More
Supplying erecting of steel centring for cover slab and sides using steel shutters including all charges etc complete - B

38.29

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

55.68

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

0.68

-

-

... More
Fabricating, Supplying and Fixing of Plug and Plug rod arrangements made up to country wood for required size along with MS rod of 50mm dia to Suit the vent ect.

1

-

-

... More
Refilling in Basement with excavated earth in layers

141.96

-

-

... More
Providing of Name Board

1

-

-

... More
Improvements to Kadathur Chinnahalli Kuttai by Desiliting, Baby Pond Protective wall & Revetment H/o A.Jettihalli

-

-

-

... More
Clearing the Scrub jungle and removed away from the site including all cutting charges and all other charges as per Std.Specification.

8190

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete

5855.39

-

-

... More
Bathing Ghat

-

-

-

... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

15.9

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

8.81

-

-

... More
Supplying erecting of steel centring for cover slab and sides using steel shutters including all charges etc complete

38.48

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

16.99

-

-

-

-

-

... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

10.2

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

13.06

-

-

... More
Supplying erecting of steel centring for cover slab and sides using steel shutters including all charges etc complete

30

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

9

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

5.25

-

-

... More
Revetment

-

-

-

... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

36.3

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

8.85

-

-

... More
Supplying erecting of steel centring for cover slab and sides using steel shutters including all charges etc complete

124.5

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

24.45

-

-

... More
Rough Stone dry Packing for revetment and apron

68.93

-

-

... More
Protective wall in Baby Pond

-

-

-

... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

88.34

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

32.28

-

-

... More
Supplying erecting of steel centring for cover slab and sides using steel shutters including all charges etc complete

206.16

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

93.52

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

7.93

-

-

... More
Plastering with cement mortar 1;3, using 20 mm thick in all floors etc.,complete.

38.46

-

-

... More
Improvements to Boorikkal Kuttai by Desiliting, Baby Pond Protective wall, Apron & Retaining Wall H/o Maniyathahalli

-

-

-

... More
Clearing the Scrub jungle and removed away from the site including all cutting charges and all other charges as per Std.Specification.

8028

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete

3583.35

-

-

... More
Bathing Ghat

-

-

-

... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

15.9

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

8.81

-

-

... More
Supplying erecting of steel centring for cover slab and sides using steel shutters including all charges etc complete

38.48

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

16.99

-

-

-

-

-

... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

3.42

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

5.14

-

-

... More
Supplying erecting of steel centring for cover slab and sides using steel shutters including all charges etc complete

8.55

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

1.92

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

2.48

-

-

... More
Plastering with cement mortar 1;3, using 20 mm thick in all floors etc.,complete.

97

-

-

... More
Revetment

-

-

-

... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

48.6

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

9.72

-

-

... More
Supplying erecting of steel centring for cover slab and sides using steel shutters including all charges etc complete

259.2

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

101.25

-

-

... More
Protective wall in Baby Pond

-

-

-

... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

88.34

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

32.28

-

-

... More
Supplying erecting of steel centring for cover slab and sides using steel shutters including all charges etc complete

206.16

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

93.52

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

7.93

-

-

... More
Plastering with cement mortar 1;3, using 20 mm thick in all floors etc.,complete.

38.46

-

-

... More
Name Board

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.