Pradhan Mantri Gram Sadak Yojana Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Eprocure
Opening Date19 Sep 2020
Closing Date1 Oct 2020
Tender Amount₹ 61,54,000 
Notes
Download

Costs

Summary

Dharmapuri District - Updation / Strengthening Of Road 1 No In Package No. Tn 04-06 Tnrris 2019-20 Of Palacode Block P06

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Collection and suply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compation with power roller etc complete

-

-

-

... More
Km 0/0 - 1/0

214.69

-

-

... More
Km 1/0 - 1/45

100.6

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premising the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired density.

-

-

-

... More
Km.0/0-1/45

630.58

-

-

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

4203.9

-

-

... More
Providing and laying TACK COAT over the WBM surface using 4.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.

-

-

-

... More
Km.0/0-1/45

4230

-

-

... More
Providing and laying premix carpet with seal coat type A for 20mm thickness using 0.18 Cum of 13.20 mm IRC size HGB metal and 0.09 cum of 11.20 mm IRC size HGB metal with and 0.09Cum of 6.70 mm IRC size HGB metal 24.40 kg of 60/70 bitumen for premixing 10 Sqm of Premix carpet including cost and conveyance of all materials to the work site and stacking them to the departmental metric gauge for Premeasurement, heating the bitumen in bitumen boiler, heating the aggregate and mixing them with bitumen in mini hot mix plant for premix carpet only, rolling by 80-100 KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet, application of bitumen for seal coat separately over premix carpet etc., including hire charges and fuel charges for Mini hot mix Plant, bitumen boiler, power roller and all other tools and plants employed but excluding cost of primer/tack cost etc., complete as per clause 509 of MOST specification..

-

-

-

... More
Km 0/0 - 1/0

2880

-

-

... More
Km 1/0 - 1/45

1350

-

-

... More
Culvert 1.5m span @ 63

-

-

-

... More
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation

70.27

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.

9.22

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

68

-

-

... More
Culvert

157.33

-

-

... More
Deck Slab

9.88

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works

0.27

-

-

... More
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum

2.69

-

-

... More
Reinforcement Concrete 1: 1 .5: 3 Mix using 20mm ISS HG metal including cost and conveyance of all materials and Labours charges ect., completed

2.65

-

-

... More
Constuction of Unreinforced Dowel Jointed at Expansion & Consturciton Joint thickness as per Design, Over a preapared sub base with 43 Grade cement M30 grade etc

2.52

-

-

... More
Tar Paper

15.12

-

-

... More
Culvert 1.5m span @ 210

-

-

-

... More
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation

70.27

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.

9.22

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

68

-

-

... More
Culvert

157.33

-

-

... More
Deck Slab

9.88

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works

0.27

-

-

... More
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum

2.69

-

-

... More
Reinforcement Concrete 1: 1 .5: 3 Mix using 20mm ISS HG metal including cost and conveyance of all materials and Labours charges ect., completed

2.65

-

-

... More
Constuction of Unreinforced Dowel Jointed at Expansion & Consturciton Joint thickness as per Design, Over a preapared sub base with 43 Grade cement M30 grade etc

2.52

-

-

... More
Tar Paper

15.12

-

-

... More
Culvert 1.5m span @ 1350

-

-

-

... More
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation

70.27

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.

9.22

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

68

-

-

... More
Culvert

157.33

-

-

... More
Deck Slab

9.88

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works

0.27

-

-

... More
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum

2.69

-

-

... More
Reinforcement Concrete 1: 1 .5: 3 Mix using 20mm ISS HG metal including cost and conveyance of all materials and Labours charges ect., completed

2.65

-

-

... More
Constuction of Unreinforced Dowel Jointed at Expansion & Consturciton Joint thickness as per Design, Over a preapared sub base with 43 Grade cement M30 grade etc

2.52

-

-

... More
Tar Paper

15.12

-

-

... More
Hard Bed @ ch 360-380 m

-

-

-

... More
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation

34.02

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.

6.8

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

25.72

-

-

... More
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm WBM Grade III

7.49

-

-

... More
Deck Slab

89.46

-

-

... More
M30 grade design

24

-

-

... More
Construction of Granular Sub base by providing well graded material(63mm to 26.5mm @35%,26.5mm to 4.75 @45% and 4.75 mm below @ 20%)& spreading in uniform layers with tractor with grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per (Mix -in - place method).

14.98

-

-

... More
Bitumen pad

8.4

-

-

... More
Hard Bed @ ch 420-450

-

-

-

... More
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation

34.02

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.

6.8

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

25.72

-

-

... More
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm WBM Grade III

7.49

-

-

... More
Deck Slab

89.46

-

-

... More
M30 grade design

24

-

-

... More
Construction of Granular Sub base by providing well graded material(63mm to 26.5mm @35%,26.5mm to 4.75 @45% and 4.75 mm below @ 20%)& spreading in uniform layers with tractor with grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per (Mix -in - place method).

14.98

-

-

... More
Bitumen pad

8.4

-

-

... More
Retaining Wall @ 570-610

-

-

-

... More
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation

60

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.

9

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

85.2

-

-

... More
Deck Slab

204

-

-

... More
Well protection wall @ 325

-

-

-

... More
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation

20.2

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.

3.04

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

31.18

-

-

... More
Deck Slab

84

-

-

... More
Provision of Name Board

1

-

-

... More
Provision of Km Stone

1

-

-

... More
Provision of Hm Stone

6

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.