Nuclear Fuel Complex Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Nuclear Fuel Complex - NFC Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date2 Feb 2024
Closing Date7 Feb 2024
Tender Amount₹ 18,34,000
Costs
EMD
₹ 36,680Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_NFC_793259_1Bid Award Id
ViewTender No
ZC/NFC/CIVIL/808/2024Tender Authority
Nuclear Fuel Complex ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
b) Depth exceeding 1.5 m
20
-
-
... More
Lead charges for the 1 KM or part thereof for additional lead over the initial lead of 50 m by mechanical transport, including loading, unloading, stacking, the disposable soil, rock etc., Note: Measurement of lead charges will be based on truck measurement with a deduction of voids @20% and 50% for soils and rock or debris respectively
-
-
-
... More
a) For soil for 1KM lead.
25
-
-
... More
b) For Debris 1Km lead
25
-
-
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift.
25
-
-
... More
Supplying and filling of sand in sides of foundations etc. In all depth, consolidating by ramming and watering, lead up to 50 and for all lift.
25
-
-
... More
Construction of granular sub-base With material conforming to Grade-III (size range 26.5 mm to 0.075 mm ) having CBR Value-20 by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.
8
-
-
... More
Cement concrete 1:3:6 using Portland Slag Cement (PSC) conforming to IS 455 (M/s. ACC, Ultra Tech,Chettinadu, Coramandal, KCP or equivalent), crushed stone sand, graded stone aggregates of 20 mm maximum size at and at all depths below plinth level including consolidation, finishing smooth/broom finish as applicable, curing, etc., complete but excluding formwork as per specifications and direction of EIC.
12
-
-
... More
Reinforced Cement Concrete by insitu mixing using Weigh Batching or approved RMC source of following Grade up to specified level using Portland Slag Cement (PSC) conforming to IS 455 Part-1 (M/s. ACC, Ultra Tech,Chettinadu, Birla, Coromandal, , KCP or equivalent make) with manufactured/robo sand and graded stone aggregates of 20mm maximum size including mixing superplasticizer of brand M/s. Fosroc, Demech, Huntsman, Pidilite, Sunanda Chemicals, Agro Chemicals, MBT or equivalent make in proportion as per Manufacturer's Specifications, Pumping / Lifting of concrete to the required heights, Concrete laid to proper level, profile and slope, placing concrete, consolidation, finishing, curing, etc., but excluding Formwork as specified and directed by EIC.
-
-
-
... More
M - 30 (Minimum Cementitious Content not less than 350 Kg/Cum)
40
-
-
... More
M - 35 (Minimum Cementitious Content not less than 370 Kg/Cum)
12
-
-
... More
Supplying, Fabricating, erecting / fixing in position Reinforcement for reinforced cement concrete items at all depths and heights below and above plinth level with high yield strength deformed bars conforming to IS 1786, Fe 500D with TM Treatment from approved source (Vizag steel, Tata, SAIL, Jindal or equivalent make) including transporting steel to site, loading , unloading, decoiling, straightening, cutting, bending using rod bending machine , fixing and tying in position with two strands of 18 gauge soft drawn annealed MS binding wire, providing cement mortar cover blocks in CM 1:1, etc., complete as per specifications and as directed by the EIC.
5
-
-
... More
Supplying, fabricating, erecting and fixing in position, foundation bolts using MS rounds conforming to IS 432 and suitable nuts including threading, placing in position in concrete in level using template, providing grease and protective cover like covering with polyethelene sheet to bolts and nuts to correct levels complete and as directed.
0.4
-
-
... More
Providing formwork (centering and shuttering) using timer planks/steel plates at and at all depths and heights below and above plinth level, in vertical, horizontal and inclined plates including propping and bracing using Acro pipes or steel tubular staging, stripping for in-situ reinforced and plain cement concrete work as required, chamfers, splays, keys, wedges, nails, bracings, brackets and applying a coat of shuttering oil on all contact surfaces with concrete, hacking the surfaces in contract with masonry after stripping etc., complete as specified and directed by EIC.
80
-
-
... More
BRICKWORK in foundation, plinth and superstructure using quality fly ash bricks of class designation 7.5 using cement mortar 1:6 (1 cement :6 using crushed stone sand of grade conforming to BIS 2116) at and at all depths below & above plinth level, simultaneous pointing with same mortar below ground level, and ranking out joints above ground level, curing etc., complete as per specifications and as directed by EIC.
5
-
-
... More
Dismantling/breaking the existing plain cement concrete/gsb/solling surfaces carefully in flooring, platforms etc. to the required size, using pneumatic cutters or any approved means including disposing of debris within a distance of 50 m etc., complete as specified and directed.
15
-
-
... More
Dismantling very carefully the existing reinforced cement concrete at all depths and heights below and above plinth level using pneumatic cutters or any approved means including cutting the reinforcement and transporting bars to departmental stores disposing the debris within the lead of 50 m complete as specified and directed
10
-
-
... More
Providing grouting (including tamping) for foundations, structures, equipments, base plates, anchor holes, etc., with non-shrink, free flow grout of shrinkhomp-30 of M/S A.C.C, Fosroc or equivalent mixed with/without filler like sand in 1:1, including shuttering wherever necessary at and at all depths and heights below and above plinth level complete as specified and directed. Note: Weight of grout used in the work will be measured for payment. However, the rate quoted shall inclusive of all materials.
-
-
-
... More
a). At the base of the machine without aggregate.
1
-
-
... More
b). In pockets with mixing of aggregate in 1:1.
0.5
-
-
... More
Proving and filling with polysulphide filler 25mm thick upto 150mm deep in between machine foundation and existing flooring joint etc., complete as directed by Engineer-in-charge.
80
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements