State Rural Roads Development Agency Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

State Rural Roads Development Agency Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date19 Jul 2022
Closing Date22 Aug 2022
Tender Amount₹ 8,62,91,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3

3837.4

-

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth)

3837.4

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.( Carted Earth)

7791.66

-

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)

-

-

-

... More
At Km0/0-1/0

199.58

-

-

... More
At Km1/0-2/0

199.58

-

-

... More
At Km2/0-3/0

199.58

-

-

... More
At Km3/0-4/0

198.74

-

-

... More
At Km4/0-5/0

199.58

-

-

... More
At Km5/0-6/0

199.5

-

-

... More
At Km6/0-7/0

198.58

-

-

... More
At Km7/0-8/0

200

-

-

... More
At Km8/0-8/634

126.28

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 Grading III

-

-

-

... More
At Km0/0-1/0

229.79

-

-

... More
At Km1/0-2/0

246.74

-

-

... More
At Km2/0-3/0

253.82

-

-

... More
At Km3/0-4/0

248.09

-

-

... More
At Km4/0-5/0

255.79

-

-

... More
At Km5/0-6/0

409.95

-

-

... More
At Km6/0-7/0

258.14

-

-

... More
At Km7/0-8/0

245

-

-

... More
At Km8/0-8/634

203.38

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired density

-

-

-

... More
At Km0/0-1/0

494.71

-

-

... More
At Km1/0-2/0

485.62

-

-

... More
At Km2/0-3/0

832.94

-

-

... More
At Km3/0-4/0

949.25

-

-

... More
At Km4/0-5/0

695.83

-

-

... More
At Km5/0-6/0

1103.32

-

-

... More
At Km6/0-7/0

460.96

-

-

... More
At Km7/0-8/0

437.5

-

-

... More
At Km8/0-8/634

396.57

-

-

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

27850.62

-

-

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.

27850.62

-

-

... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 Kg/sqm on the prepared bituminous / granular surface cleaned with mechanical broom.

20266.24

-

-

... More
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @4.0 to 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects

2878.14

-

-

... More
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects

1443.5

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeding vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground levels as per drawings and Technical Specification Clause 801

-

-

-

... More
Logo board

3

-

-

... More
Sign board

12

-

-

... More
Octagonal Board

2

-

-

... More
Circular Board

1

-

-

... More
Citizen board

1

-

-

... More
Name board

1

-

-

... More
Maintanance board

1

-

-

... More
Provision for Kilometre Stones

8

-

-

... More
Provision for Hectametre Stones

35

-

-

... More
Provision for Thermaplastic paint

1727

-

-

... More
Provision for Studs

960

-

-

... More
Provision for Hazard marker

36

-

-

... More
Construction of box culvert 1.50 X 1.50 m At Km 0/472

-

-

-

... More
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT AND CUTOFF WALLS.

59.92

-

-

... More
Vibrated Cement Concrete of Grade M-10, Nominal Mix, 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF BOX CULVERT.-1 Cum.

6.71

-

-

... More
Vibrated Plain Cement Concrete of grade M15 (1:1.5:3) NOMINAL MIX using 40mm ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Retaining wall.

29.27

-

-

... More
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BASE SLAB, STEM AND TOP SLAB OF BOX CULVERT.

30.28

-

-

... More
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-500 grade

2.12

-

-

... More
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill.

16

-

-

... More
Construction of box culvert 1.50 X 1.50 m At Km 1/662

-

-

-

... More
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT AND CUTOFF WALLS.

59.92

-

-

... More
Vibrated Cement Concrete of Grade M-10, Nominal Mix, 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF BOX CULVERT.-1 Cum.

6.71

-

-

... More
Vibrated Plain Cement Concrete of grade M15 (1:1.5:3) NOMINAL MIX using 40mm ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Retaining wall.

29.06

-

-

... More
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BASE SLAB, STEM AND TOP SLAB OF BOX CULVERT.

30.28

-

-

... More
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-500 grade

2.12

-

-

... More
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill.

16

-

-

... More
Construction of box culvert 1.50 X 1.50 m At Km 2/817

-

-

-

... More
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT AND CUTOFF WALLS.

59.92

-

-

... More
Vibrated Cement Concrete of Grade M-10, Nominal Mix, 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF BOX CULVERT.

6.71

-

-

... More
Vibrated Plain Cement Concrete of grade M15 (1:1.5:3) NOMINAL MIX using 40mm ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Retaining wall.

29.06

-

-

... More
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BASE SLAB, STEM AND TOP SLAB OF BOX CULVERT.

30.28

-

-

... More
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-500 grade

2.12

-

-

... More
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill.

16

-

-

... More
Construction of box culvert 1.50 X 1.50 m At Km 3/0

-

-

-

... More
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT AND CUTOFF WALLS.

59.92

-

-

... More
Vibrated Cement Concrete of Grade M-10, Nominal Mix, 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF BOX CULVERT.-1 Cum.

6.71

-

-

... More
Vibrated Plain Cement Concrete of grade M15 (1:1.5:3) NOMINAL MIX using 40mm ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Retaining wall.

29.27

-

-

... More
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BASE SLAB, STEM AND TOP SLAB OF BOX CULVERT.

30.28

-

-

... More
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-500 grade

2.12

-

-

... More
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill.

16

-

-

... More
Construction of box culvert 1.50 X 1.50 m At KM 3/193

-

-

-

... More
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT AND CUTOFF WALLS.

59.92

-

-

... More
Vibrated Cement Concrete of Grade M-10, Nominal Mix, 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF BOX CULVERT.-1 Cum.

6.71

-

-

... More
Vibrated Plain Cement Concrete of grade M20 (1:1.5:3) NOMINAL MIX using 40mm ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Retaining wall Raft (footings)

29.27

-

-

... More
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BASE SLAB, STEM AND TOP SLAB OF BOX CULVERT.

30.28

-

-

... More
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-500 grade

2.12

-

-

... More
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill.

16

-

-

... More
Construction of box culvert 1.50 X 1.50 m At KM 3/905

-

-

-

... More
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT AND CUTOFF WALLS.

59.92

-

-

... More
Vibrated Cement Concrete of Grade M-10, Nominal Mix, 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF BOX CULVERT.

6.71

-

-

... More
Vibrated Plain Cement Concrete of grade M20 (1:1.5:3) NOMINAL MIX using 40mm ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Retaining wall Raft (footings)

29.27

-

-

... More
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BASE SLAB, STEM AND TOP SLAB OF BOX CULVERT.

30.28

-

-

... More
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-500 grade

2.12

-

-

... More
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill.

16

-

-

... More
Construction of box culvert 1.50 X 1.50 m At KM 4/372

-

-

-

... More
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT AND CUTOFF WALLS.

57.84

-

-

... More
Vibrated Cement Concrete of Grade M-10, Nominal Mix, 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF BOX CULVERT.-1 Cum.

6.71

-

-

... More
Vibrated Plain Cement Concrete of grade M20 (1:1.5:3) NOMINAL MIX using 40mm ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Retaining wall Raft (footings)

29.27

-

-

... More
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BASE SLAB, STEM AND TOP SLAB OF BOX CULVERT.

30.28

-

-

... More
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-500 grade

2.12

-

-

... More
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill.

16

-

-

... More
Construction of box culvert 1.50 X 1.50 m At KM 6/400

-

-

-

... More
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT AND CUTOFF WALLS.

59.92

-

-

... More
Vibrated Cement Concrete of Grade M-10, Nominal Mix, 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF BOX CULVERT.-

6.71

-

-

... More
Vibrated Plain Cement Concrete of grade M20 (1:1.5:3) NOMINAL MIX using 40mm ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Retaining wall Raft (footings)

29.27

-

-

... More
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BASE SLAB, STEM AND TOP SLAB OF BOX CULVERT.

30.28

-

-

... More
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-500 grade

2.12

-

-

... More
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill.

16

-

-

... More
Construction of box culvert 1 cell of 2.00 X 2.00 m At Km 8/2

-

-

-

... More
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT AND CUTOFF WALLS.

135.1

-

-

... More
Vibrated Cement Concrete of Grade M-10, Nominal Mix, 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF BOX CULVERT.-1 Cum.

7.27

-

-

... More
Vibrated Plain Cement Concrete of grade M20 (1:1.5:3) NOMINAL MIX using 40mm ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Retaining wall Raft (footings)

32.8

-

-

... More
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BASE SLAB, STEM AND TOP SLAB OF BOX CULVERT.

37.07

-

-

... More
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-500 grade

2.38

-

-

... More
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill.

16

-

-

... More
Construction of Side Drain At Km 5/500-5/600 Left & Right

-

-

-

... More
Earth work Excavation for structures as per drawing and technical specifications clause 305.1 including setting out , construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of side

445.5

-

-

... More
Vibrated Cement concrete in M-10 using ISS HBG including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per relevant standard specification for foundation.

40.5

-

-

... More
Vibrated Reinforced Cement Concrete M-20 Grade, Nominal Mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete for Drain Cover slab

177.53

-

-

... More
Supply and Fabrication of S-415 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlaping to the required.

7.56

-

-

... More
Dismantling Existing CD works @ Km. 9/160 , , 6/730, 7/178, 7/413 , 8/193, 8/900, 9/415, 9/520, 9/850

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.Foundation Concrete @ Ch.,3/000,3/905,4/372,6/400,1/662,2/817,3/193

16.51

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

52.52

-

-

... More
Dismantling, Clearing away and carefully stacking materials useful for re use. Removal of cut stone slabs

7.2

-

-

... More
Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202.

6

-

-

... More
Construction of Protective work @ Km. 2/10 R, Km.3/8 L, Km.3/10 L, Km.4/4 L, Km.4/4R, Km.5/2R, Km.6/6L

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Protective works @ Km. 2/10 R

32.73

-

-

... More
Protective works @ Km. 3/8 L & 3/10 L

112.21

-

-

... More
Protective works @ Km. 4/4 L & R

85.09

-

-

... More
Protective works @ Km. 5/2 R

45.79

-

-

... More
Protective works @ Km.6/6 L

93.5

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Protective works @ Km. 2/10 R

8.93

-

-

... More
Protective works @ Km. 3/8 L & 3/10 L

30.61

-

-

... More
Protective works @ Km. 4/4 L & R

23.21

-

-

... More
Protective works @ Km. 5/2 R

12.49

-

-

... More
Protective works @ Km.6/6 L

25.5

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Protective works @ Km. 2/10 R

5.95

-

-

... More
Protective works @ Km. 3/8 L & 3/10 L

20.4

-

-

... More
Protective works @ Km. 4/4 L & R

15.47

-

-

... More
Protective works @ Km. 5/2 R

8.33

-

-

... More
Protective works @ Km.6/6 L

17

-

-

... More
Cement concrete 1 : 2: 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.BELOW SILL

-

-

-

... More
Protective works @ Km. 2/10 R

15.75

-

-

... More
Protective works @ Km. 3/8 L & 3/10 L

54

-

-

... More
Protective works @ Km. 4/4 L & R

41.4

-

-

... More
Protective works @ Km. 5/2 R

22.28

-

-

... More
Protective works @ Km.6/6 L

45

-

-

... More
Cement concrete 1 : 2: 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.ABOVE SILL

-

-

-

... More
Protective works @ Km. 2/10 R

45.94

-

-

... More
Protective works @ Km. 3/8 L & 3/10 L

157.64

-

-

... More
Protective works @ Km. 4/4 L & R

78.88

-

-

... More
Protective works @ Km. 5/2 R

85.86

-

-

... More
Protective works @ Km.6/6 L

131.25

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
Protective works @ Km. 2/10 R

50

-

-

... More
Protective works @ Km. 3/8 L

75

-

-

... More
Protective works @ Km. 3/10 L

45

-

-

... More
Protective works @ Km. 4/4 L

60

-

-

... More
Protective works @ Km. 5/2 R

45

-

-

... More
Protective works @ Km.6/6 L

100

-

-

... More
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications

9.78

-

-

... More
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)

-

-

-

... More
For 1st year

1

-

-

... More
For 2nd year

1

-

-

... More
For 3rd Year

1

-

-

... More
For 4th Year

1

-

-

... More
For 5th Year

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.