National Bank For Agriculture And Rural Development Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date12 Apr 2025
Closing Date28 Apr 2025
Tender Amount₹ 5,78,10,000 
Notes
Download

AI Insights

Class Of Bidder
Bid Capacity
... View More
The formula for bid capacity is: Assessed Available Bid Capacity = (A x N x 2)-B Where A is Maximum value of construction works executed in any one year during the last five years (updated to the current price level) B is Value at current price level of the existing commitments and ongoing works to be completed during the next 6 months N is Number of years prescribed for completion of the works for which the bids are invited.
Technical Capacity
... View More
The required prior work experience for the bidder includes experience in civil engineering construction, specifically in fields such as road work, bridge work, and heavy earthmoving equipment. The bidder should have experience in using quality control equipment and mechanized granular pavement construction. The bidder should have achieved an average annual turnover of at least 40% of the value of the contract applied for, over the last five years, which is Rs.231.24 Lakhs. Additionally, the bidder should have successfully completed at least one contract of similar nature (Highways road and/or Bridge works/Airport contract) with a value of at least 40% of the proposed contract in any one year within the last five years, which is also Rs.231.24 Lakhs. The bidder should demonstrate experience in similar nature of work, including quantities such as: - Earthwork: 5341.90 m3 (completed) and 2136.76 m3 (minimum required) - Gravel Soling, GSB: 283.50 m3 (completed) and 113.40 m3 (minimum required) - WMM, CRM: 5627.10 m3 (completed) and 2250.84 m3 (minimum required) - Prime coat, Tack coat: 50896.90 m2 (completed) and 20358.76 m2 (minimum required) - BM, DBM: 1276.80 m3 (completed) and 510.72 m3 (minimum required) - BC, SDBC: 765.70 m3 (completed) and 306.28 m3 (minimum required) - CC, VCC, VRCC: 1189.96 m3 (completed) and 475.99 m3 (minimum required) - Steel: 5.04 MT (completed) and 2.02 MT (minimum required) No specific percentage of similar works completed is mentioned, but the bidder is required to provide information on the value of the total contract. The bid capacity to execute the work should be greater than Rs.578.10 Lakhs, and the bidder should have access to liquid assets of at least Rs.57.81 Lakhs.

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
C) Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

1051.2

6

6769.73

... More
Picking the existing BT surface upto 50mm thick depth etc. complete as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and depositing the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed for the work and including all other incidental charges etc., complete as per as per clause 111, 112, 202, 203, 303, 403 & 501 of MORT&H Specification (Fifth Revision).

-

-

-

... More
A) Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

4028.5

21

87982.44

... More
B) Upgradation of Karattandipatty to Adaiyur main road (via) Kandamoopanvalavu Km 0/0-2/500.

3364.4

21

73478.5

... More
C) Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

459.6

21

10037.66

... More
Construction of Granular Sub-base by providing close graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Specification for grading-V Material.

-

-

-

... More
A) Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

58.5

1881

110042.6

... More
C) Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

225

1762

396510.75

... More
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam of required thickness including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Rev-5.

-

-

-

... More
A) Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

2466.3

2211

5454987

... More
B) Upgradation of Karattandipatty to Adaiyur main road (via) Kandamoopanvalavu Km 0/0-2/500.

2425

2180

5288173.25

... More
C) Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

735.8

2211

1627449.8

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 502 & 900 of MORTH Rev-5.

-

-

-

... More
A) Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

12233.7

84

1028609.5

... More
B) Upgradation of Karattandipatty to Adaiyur main road (via) Kandamoopanvalavu Km 0/0-2/500.

10243.6

84

862101.38

... More
C) Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

2943

84

247653.45

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 503 & 900 of MORTH Rev-5.

-

-

-

... More
A) Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

12233.7

19

241860.25

... More
B) Upgradation of Karattandipatty to Adaiyur main road (via) Kandamoopanvalavu Km 0/0-2/500.

10243.6

19

202823.28

... More
C) Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

2943

19

58241.97

... More
Providing and laying Tack Coat over Dry Lean cement concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 503 & 900 of MORTH Rev-5.

-

-

-

... More
A) Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

31.1

22

697.88

... More
B) Upgradation of Karattandipatty to Adaiyur main road (via) Kandamoopanvalavu Km 0/0-2/500.

11.3

22

253.91

... More
C) Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

13.9

22

312.19

... More
Providing and laying 50mm thick Consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20mm 0.430cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below IRC metal with 37 kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plants required, including all other and incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 504 & 900 of MORTH Rev-5.

-

-

-

... More
A) Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

613.4

9152

5613910.41

... More
B) Upgradation of Karattandipatty to Adaiyur main road (via) Kandamoopanvalavu Km 0/0-2/500.

515.6

9148

4717028.47

... More
C) Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

147.8

9184

1357466.14

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50 - 2.36mm and 0.26 cum of 2.36mm and below with 50.30 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10t Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, Paver finisher, Vibratory roller and all other tools and plants required, including all other and incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 507 & 900 of MORTH Rev-5.

-

-

-

... More
A) Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

367

11880

4359978.35

... More
B) Upgradation of Karattandipatty to Adaiyur main road (via) Kandamoopanvalavu Km 0/0-2/500.

308

11897

3664577.84

... More
C) Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

88.4

11935

1055058.42

... More
Providing and laying Bituminous Concrete to 50mm thick using 0.22cum of 26.50-13.20mm, 0.24cum of 13.20 - 2.36mm and 0.26 cum of 2.36mm and below IRC HBG metal with 62.40 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10t Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, Paver finisher, Vibratory roller and all other tools and plants required, including all other and incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 507 & 900 of MORTH Rev-5.

-

-

-

... More
A) Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

1.6

11365

18185.18

... More
C) Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

0.7

11420

7994.24

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation backfilling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for Carted earth for making up berms with conveyance of 5 Km complete as directed by the departmental officers as per clause 111, 112, 301, 305 & 900 of MORT&H Specification (Fifth Revision)

-

-

-

... More
A) Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

1779.2

238

423520.77

... More
B) Upgradation of Karattandipatty to Adaiyur main road (via) Kandamoopanvalavu Km 0/0-2/500.

1801.8

238

428900.47

... More
C) Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

600.5

238

142943.02

... More
Providing RCC M15 grade precast KM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete (as per MORTH & H specification no 804).

-

-

-

... More
A) Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

3

2197

6591

... More
B) Upgradation of Karattandipatty to Adaiyur main road (via) Kandamoopanvalavu Km 0/0-2/500.

2

2197

4394

... More
Providing RCC M15 grade precast HM stone of standard design as per IRC 26 -1967 and fixing in position including painting and printing etc., complete (as per MORTH & H specification no 804).

-

-

-

... More
A) Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

13

574

7470.45

... More
B) Upgradation of Karattandipatty to Adaiyur main road (via) Kandamoopanvalavu Km 0/0-2/500.

10

574

5746.5

... More
C) Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

3

574

1723.95

... More
Supply and fixing of R.C.C. GUIDE POSTS of size 1.2x0.2x0.2 m with reflective star stickers with tin M.S. Sheet with two side packing and top cover of 0.75 inches in R.C.C 1:2:4 mix using 20mm HBG metal with 10mm dia bars as vertical with 8mm dia stirrups including 8.25 inches x 4.25 feet mould with star shape of 5 inches and top Projection by Projection by 0.75 inches x 3 inches including cost and conveyance of materials to worksite etc., complete.

-

-

-

... More
A) Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

50

1220

61011

... More
B) Upgradation of Karattandipatty to Adaiyur main road (via) Kandamoopanvalavu Km 0/0-2/500.

50

1220

61011

... More
C) Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

21

1220

25624.62

... More
Vibrated Reinforced Cement concrete grade M30 Design mix, using 20mm, 12mm, 6mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 2702.2 of MORT&H Specification (Fifth Revision) for WEARING COAT OF 75MM UNIFORM THICKNESS OVER EXISTING HARD BED.

-

-

-

... More
B) Upgradation of Karattandipatty to Adaiyur main road (via) Kandamoopanvalavu Km 0/0-2/500.

187.5

703

131981.25

... More
Dismantling the existing RR Masonry in Cement Mortar in the existing bridge and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete as per clause 111, 112 & 202 of MORT&H specification (Fifth Revision) FOR BOX CULVERT.

-

-

-

... More
A) i). Construction of Box Culvert at Km 0/4 & 2/8 for the work of Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

22.6

283

6398.96

... More
C) i). Reconstruction of Box Culvert at Km 0/2 for the work of Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

6

283

1698.84

... More
Dismantling the RCC Slab in the existing culvert and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete as per clause 111, 112 & 202 of MORT&H specification (Fifth Revision) FOR BOX CULVERT.

-

-

-

... More
A) i). Construction of Box Culvert at Km 0/4 & 2/8 for the work of Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

5.1

4308

21974.37

... More
C) i). Reconstruction of Box Culvert at Km 0/2 for the work of Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

5.6

4308

24128.72

... More
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per Clause 111, 112, 304 of MORT&H (V Revision) for FOUNDATION OF BOX CULVERT, RETAINING WALL AND PCC PROTECTIVE WORKS.

-

-

-

... More
A) i). Construction of Box Culvert at Km 0/4 & 2/8 for the work of Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

154.8

246

38161.3

... More
A) ii). Construction of PCC Protective Works at Km 0/0-3/210 for the work of Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

675.6

246

166548.91

... More
B) i). Construction of Retaining wall at Km 0/6, 0/8 & 1/8 for the work of Upgradation of Karattandipatty to Adaiyur main road (via) Kandamoopanvalavu Km 0/0-2/500.

258

246

63602.16

... More
C) i). Reconstruction of Box Culvert at Km 0/2 for the work of Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

72

246

17749.44

... More
Plain Cement Concrete of grade M10 (Nominal mix), using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for LEVELING COURSE OF BOX CULVERT.

-

-

-

... More
A) i). Construction of Box Culvert at Km 0/4 & 2/8 for the work of Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

8.2

5458

44758.96

... More
C) i). Reconstruction of Box Culvert at Km 0/2 for the work of Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

3.9

5403

21071.74

... More
Vibrated Reinforced cement concrete of grade M-25 (Design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel including cost of form work, labour charges for mixing, transporting, laying, curing concrete, potable water, working at heights, hire charges for tools and plants, including all other incidental charges etc., complete as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for BASE SLAB SIDE AND TOP SLAB OF BOX CULVERT.

-

-

-

... More
A) i). Construction of Box Culvert at Km 0/4 & 2/8 for the work of Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

49.6

11942

592337.58

... More
C) i). Reconstruction of Box Culvert at Km 0/2 for the work of Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

22.2

11830

262626.89

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for FOOTINGS OF WING WALL OF BOX CULVERT, RETAINING WALL AND PCC PROTECTIVE WORKS. (BELOW SILL).

-

-

-

... More
A) i). Construction of Box Culvert at Km 0/4 & 2/8 for the work of Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

18.2

6321

115059.67

... More
A) ii). Construction of PCC Protective Works at Km 0/0-3/210 for the work of Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

141.6

6320

894941.74

... More
B) i). Construction of Retaining wall at Km 0/6, 0/8 & 1/8 for the work of Upgradation of Karattandipatty to Adaiyur main road (via) Kandamoopanvalavu Km 0/0-2/500.

64.5

6390

412191.12

... More
C) i). Reconstruction of Box Culvert at Km 0/2 for the work of Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

8.5

6266

53266.02

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for STEM OF WING WALL OF BOX CULVERT, RETAINING WALL AND PCC PROTECTIVE WORKS. (BELOW SILL).

-

-

-

... More
A) i). Construction of Box Culvert at Km 0/4 & 2/8 for the work of Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

31.7

8156

258546.79

... More
A) ii). Construction of PCC Protective Works at Km 0/0-3/210 for the work of Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

297.4

8118

2414569.78

... More
B) i). Construction of Retaining wall at Km 0/6, 0/8 & 1/8 for the work of Upgradation of Karattandipatty to Adaiyur main road (via) Kandamoopanvalavu Km 0/0-2/500.

109.4

8252

902834.44

... More
C) i). Reconstruction of Box Culvert at Km 0/2 for the work of Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

14

8307

116301.92

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for STEM OF WING WALL OF BOX CULVERT, RETAINING WALL AND PCC PROTECTIVE WORKS. (ABOVE SILL).

-

-

-

... More
A) i). Construction of Box Culvert at Km 0/4 & 2/8 for the work of Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

30.5

10235

312180.62

... More
A) ii). Construction of PCC Protective Works at Km 0/0-3/210 for the work of Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

181

9996

1809390.03

... More
B) i). Construction of Retaining wall at Km 0/6, 0/8 & 1/8 for the work of Upgradation of Karattandipatty to Adaiyur main road (via) Kandamoopanvalavu Km 0/0-2/500.

78.4

10685

837736.93

... More
C) i). Reconstruction of Box Culvert at Km 0/2 for the work of Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

11.8

10642

125584.92

... More
Vibrated Cement Concrete M15 grade Nominal Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specification, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) FOR PARAPET OVER BOX CULVERT, RETAINING WALL AND PCC PROTECTIVE WORKS.

-

-

-

... More
A) i). Construction of Box Culvert at Km 0/4 & 2/8 for the work of Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

1.9

11135

21158.1

... More
A) ii). Construction of PCC Protective Works at Km 0/0-3/210 for the work of Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

83.9

10102

847628.28

... More
B) i). Construction of Retaining wall at Km 0/6, 0/8 & 1/8 for the work of Upgradation of Karattandipatty to Adaiyur main road (via) Kandamoopanvalavu Km 0/0-2/500.

18.3

11644

213095.27

... More
C) i). Reconstruction of Box Culvert at Km 0/2 for the work of Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

0.9

11167

10050.94

... More
Supply and fabrication of Fe-500D grade Steel required for all RCC items of works involved in the schedule cost of steel at site and cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete as per clause 1600 of MORT&H Specifications (Fifth Revision) for BOX CULVERT.

-

-

-

... More
A) i). Construction of Box Culvert at Km 0/4 & 2/8 for the work of Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

3.46

95609

330808.07

... More
C) i). Reconstruction of Box Culvert at Km 0/2 for the work of Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

1.58

95609

151253.87

... More
Providing and fixing PVC seepage pipes of 100mm dia. PVC pipes of requied lengths including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc., complete as per clause 2700 of MORT&H Specification (Fifth Revision) to drain of the backfill in THE ABUTMENTS AND WINGS FOR BOX CULVERT, PCC PROTECTIVE WORKS AND RETAINING WALL.

-

-

-

... More
A) i). Construction of Box Culvert at Km 0/4 & 2/8 for the work of Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

7.2

192

1386

... More
A) ii). Construction of PCC Protective Works at Km 0/0-3/210 for the work of Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

91.7

192

17652.25

... More
B) i). Construction of Retaining wall at Km 0/6, 0/8 & 1/8 for the work of Upgradation of Karattandipatty to Adaiyur main road (via) Kandamoopanvalavu Km 0/0-2/500.

43.2

192

8316

... More
C) i). Reconstruction of Box Culvert at Km 0/2 for the work of Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

5.4

192

1039.5

... More
Refilling behind body wall with excavated earth including conveyance of all materials to work site including labour charges for filling in layers compacting by manual labour under optimum moisture content to get the maximum density as layer including all incidental charges etc,. complete FOR BOX CULVERT, RETAINING WALL AND PCC PROTECTIVE WORKS. (Labour Charges only).

-

-

-

... More
A) i). Construction of Box Culvert at Km 0/4 & 2/8 for the work of Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

107.3

37

4036.63

... More
A) ii). Construction of PCC Protective Works at Km 0/0-3/210 for the work of Upgradation of Narikuravar Colony to Malaiadivaram Road Km 0/0-3/210.

661.6

37

24889.39

... More
B) i). Construction of Retaining wall at Km 0/6, 0/8 & 1/8 for the work of Upgradation of Karattandipatty to Adaiyur main road (via) Kandamoopanvalavu Km 0/0-2/500.

258

37

9705.96

... More
C) i). Reconstruction of Box Culvert at Km 0/2 for the work of Upgradation of Omalur Sankagiri Road to Manganur Road Km 0/0-0/720.

46.1

37

1734.28

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items (excluding GST)

1

48987000

-

... More
GST 18% for above SubTotal Amount

1

8817660

8817660

... More
Total Value put to Tender

1

57804660

-

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 12% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 12% of GST

1

-

-

... More
Total in Figures (SubTotal + GST)

-

-

57804660

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.