National Bank For Agriculture And Rural Development Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date12 Apr 2025
Closing Date5 May 2025
Tender Amount₹ 5,26,20,000 
Notes
Download

AI Insights

Class Of Bidder
Bid Capacity
... View More
The formula for bid capacity is: Assessed Available Bid Capacity = (A x N x 2)-B, where A is the Maximum value of construction works executed in any one year during the last five years, B is the Value at current price level of the existing commitments and ongoing works to be completed during the next 7 months, and N is the Number of years prescribed for completion of the works, noting that 7 months may need to be converted to years for the calculation.
Technical Capacity
... View More
The required prior work experience for the bidder includes experience as a prime contractor or sub-contractor in similar works, such as highways and airfields. The bidder should have experience in using heavy earthmoving equipment and quality control equipment for road work and bridge work. The bidder should provide details of their experience in mechanized granular pavement construction, construction of Asphaltic Overlays, and construction of Bridge Works, including Bridge Works in Open Foundations. The bidder should also provide information on their annual turnover for the last five years, with the amount billed to clients for each year for work in progress or completed. The required prior work experience for the bidder includes: - For works up to Rs. 200.00 Lakhs: One B.E Degree Holder (or) One Diploma Holder in Civil Engineering with Five year experience in similar works. - For works above Rs. 200.00 Lakhs up to Rs. 1000.00 Lakhs: One B.E Degree Holder in Civil Engineering with one-year experience in similar works and One Diploma Holder in Civil Engineering with five years’ experience in similar works. - For works above Rs. 1000.00 Lakhs to Rs.5000.00 Lakhs: One B.E Degree Holder in Civil Engineering with one year experience in similar works and Two Diploma Holder in Civil Engineering with five years’ experience in similar works. - For works above Rs. 5000.00 Lakhs to Rs.10000.00 Lakhs: Two B.E Degree Holder in Civil Engineering with one year experience in similar works and Four Diploma Holder in Civil Engineering with five years’ experience in similar works. - For works above Rs. 10000.00 Lakhs to Rs.20000.00 Lakhs: Three B.E Degree Holder in Civil Engineering with one year experience in similar works and Six Diploma Holder in Civil Engineering with five years’ experience in similar works. - For works above Rs. 20000.00 Lakhs: Four B.E Degree Holder in Civil Engineering with one year experience in similar works and Eight Diploma Holder in Civil Engineering with five years’ experience in similar works. The values of similar works completed are: - Earthwork: 5213.10 m3 (maximum) and 2086.00 m3 (minimum) - GSB / WMM: 6257.63 m3 (maximum) and 2504.00 m3 (minimum) - BM / DBM: 886.13 m3 (maximum) and 355.00 m3 (minimum) - BC / SDBC (Wearing Course): 515.00 m3 (maximum) and 206.00 m3 (minimum) - VCC/ VRCC: 725.74 m3 (maximum) and 291.00 m3 (minimum) - Steel: 20.82 MT (maximum) and 8.328 MT (minimum) The bidder should have achieved an average annual turnover of at least 40% of the value of the contract applied for over the last five years. The contract value is mentioned as Rs. 210.48 Lakhs. The bidder should also demonstrate access to liquid assets or credit facilities of not less than 10% of the contract value, which is Rs. 52.62 Lakhs. No specific percentage of similar works completed is mentioned, other than the requirement that the bidder should have earlier carried out satisfactorily work of similar size, nature, and complexity.

Costs

Summary

Tn.no.01 / Si.no.04 / 2025-2026 / Sdo / Cpt - 04

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Picking 5cm to 10cm old B.T surface and sectioning and to bring to camber and super elevation as directed by the departmental officers including labour charges for picking including hire charges for all tools and equipments employed and all other incidental charges etc., complete as per standard specification.

-

-

-

... More
Road B

2494

21

54468.96

... More
Construction of Granular Sub-Base Grade V of 200mm thick by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete (Specification Number as per MORT&H Rev.V 111,112,401,900)

-

-

-

... More
Road A

1831

2542

4655610.46

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 (Specification Number as per MORT&H Rev.V 111,112,406,900)

-

-

-

... More
Road A

2300

2840

6533679

... More
Road B

1986

2840

5641689.78

... More
Providing and laying Prime Coat over WBM/WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10sqm for pre paratory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 (Specification Number as per MORT&H Rev.V 111,112,502,900)

-

-

-

... More
Road A

9199

83

771336.15

... More
Road B

7943

83

666179.41

... More
Providing and laying Tack Coat over primed surface (treated with primer) using 2.50Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction overit including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 (Specification Number as per MORT&H Rev.V 111,112,503,900)

-

-

-

... More
Road A

9199

19

181128.31

... More
Road B

7943

19

156397.67

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 (Specification Number as per MORT&H Rev.V 111,112,504,900)

-

-

-

... More
Road A

460

9730

4475901.2

... More
Road B

398

9730

3872627.56

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 (Specification Number as per MORT&H Rev.V 111,112,507,900)

-

-

-

... More
Road A

276

12382

3417467.88

... More
Road B

239

12382

2959329.07

... More
Carted earth including cost and conveyance an average lead of 5km to worksite and stackong them on road side for taking premeasurements and spreading the same in the low berms as directed by the Engineer with initial lift including all labour charges and consolidation with power roller including all tools and plants and all other incidental charges etc., complete for formation of side Berms in accordance with standard Specifications as per MORT&H Vth Rev., 111, 112 408 &900.

-

-

-

... More
Road A

2380

238

566440

... More
Road B

1282

238

305116

... More
Providing RCC M15 Grade Precast HM stone of standard design as per IRC 26-1967 and fixing in position including painting and Lettering etc., complete (as per MORTH SPECIFICATION No.805)

-

-

-

... More
Road A

10

574

5746.5

... More
Road B

8

574

4597.2

... More
Providing RCC M15 Grade Precast KM stone of standard design as per IRC 8-1980 and fixing in position including painting and Lettering ect., complete (as per MORTH SPECIFICATION No.805)

-

-

-

... More
Road A

2

2197

4394

... More
Road B

2

2197

4394

... More
Providing and erecting of Direction and Place Identification Retro-reflectorised Sign made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 -09, specification and fixed over 2mm thickAluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro- reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012. (as per MORT&H Specification No.801) (For sign having area more than 0.9sq.m) Type-IV

-

-

-

... More
Road A

1.08

11805

12749.4

... More
Road B

1.08

11805

12749.4

... More
Supply and fixing of RCC guide post of size1.20 x 0.20 x 0.20 m with reflective star stickers with tin M.s sheet with two side packing and top cover of 0.75 inches in RCC 1: 2: 4 Mix using 20 mm HBG ISS metal with 10 mm. dia bars as vertical with 8mm dia Stirrups including 8.25 inches x 4.25 feet mould with star shape of 5 inches and top projection by 0.75 inches x 3 inches including cost and conveyance of materials to worksite etc., complete.,

-

-

-

... More
Road A

10

1220

12202.2

... More
SUB ESTIMATE - Box Culvert Dismantling the the existing Plain Cement concrete in the existing damaged pipe culvert and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.(Specification No.111,112,202.)

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/6 & 1/6

9.75

486

4740.45

... More
Road A - Single Cell 2x2 at Km 2/0(i)

19.73

486

9592.73

... More
Road A - Two Cell 3x3 at Km 2/0(ii)

14.23

486

6918.63

... More
Road B - Single Cell 2x2 at Km 1/6(i) & 1/6(ii)

39.46

486

19185.45

... More
Dismantling the the existing RCC Cement concrete in the existing causeway / bridge and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.(Specification No.111,112,202.)

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/6 & 1/6

4

4308

17234.8

... More
Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation of BOx Culvert (Specification No.111,112,304.)

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/6

99.07

246

24422.74

... More
Road A - Single Cell 2x2 at Km 1/6

99.07

246

24422.74

... More
Road A - Single Cell 2x2 at Km 2/0(i)

99.07

246

24422.74

... More
Road A - Two Cell 3x3 at Km 2/0(ii)

269.81

246

66513.56

... More
Road B - Single Cell 2x2 at Km 1/6(i) & 1/6(ii)

198.14

246

48845.47

... More
Plain Cement Concrete M15 grade (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants etc. Complete for Levelling Course for Box Culvert as per MORTH Rev. V Specification No. 1000,1500,1700,2100,2200

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/6

5.29

6851

36245.92

... More
Road A - Single Cell 2x2 at Km 1/6

5.29

6860

36294.58

... More
Road A - Single Cell 2x2 at Km 2/0(i)

5.29

6860

36294.58

... More
Road A - Two Cell 3x3 at Km 2/0(ii)

18.25

6860

125212.89

... More
Road B - Single Cell 2x2 at Km 1/6(i) & 1/6(ii)

10.57

7035

74369.67

... More
Vibrated Reinforced Cement concrete in M25 using 20mm and below ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete for Base slab Side wall & Deck slab of CELL BOX as per MORTH Rev. V Specification No. 1000,1500,1700,2200,2300

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/6

34.93

12851

448890.32

... More
Road A - Single Cell 2x2 at Km 1/6

34.93

12860

449211.68

... More
Road A - Single Cell 2x2 at Km 2/0(i)

34.93

12860

449211.68

... More
Road A - Two Cell 3x3 at Km 2/0(ii)

101.92

12230

1246527.46

... More
Road B - Single Cell 2x2 at Km 1/6(i) & 1/6(ii)

69.86

13035

910644.66

... More
Vibrated Reinforced Cement concrete in M30 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for Approach Slab

-

-

-

... More
Road A - Two Cell 3x3 at Km 2/0(ii)

15.75

9938

156538.62

... More
Supply and fabrication of steel grade Fe-500D steel required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and palcing the reinforcement in position as specified in the drawings including cost of binding wire, provision for spacing bars, cover blocks and all other incidental charges etc., complete as per per MORTH Rev. V specifications No.1600.

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/6

2.3

95609

219901.32

... More
Road A - Single Cell 2x2 at Km 1/6

2.3

95609

219901.32

... More
Road A - Single Cell 2x2 at Km 2/0(i)

2.3

95609

219901.32

... More
Road A - Two Cell 3x3 at Km 2/0(ii)

8.4

95609

803117.87

... More
Road B - Single Cell 2x2 at Km 1/6(i) & 1/6(ii)

4.6

95609

439802.64

... More
Supply and fabrication of steel grade Fe-240 steel required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and palcing the reinforcement in position as specified in the drawings including cost of binding wire, provision for spacing bars, cover blocks and all other incidental charges etc., complete as per per MORTH Rev. V specifications No.1600.

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/6

0.1

95609

9560.93

... More
Road A - Single Cell 2x2 at Km 1/6

0.1

95609

9560.93

... More
Road A - Single Cell 2x2 at Km 2/0(i)

0.1

95609

9560.93

... More
Road A - Two Cell 3x3 at Km 2/0(ii)

0.42

95609

40155.89

... More
Road B - Single Cell 2x2 at Km 1/6(i) & 1/6(ii)

0.2

95609

19121.85

... More
Vibrated cement Concrete M30 design mix using 20mm and below ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for mixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, formwork, cost of premoulded expansion joints and fixing the same in position etc., excluding steel complete for wearing coat of 75mm uniform thickness over deck slab as per MORTH Rev. V Specification No.1000, 1500, 1700, 2702.

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/6

19.5

783

15286.64

... More
Road A - Single Cell 2x2 at Km 1/6

19.5

784

15300.29

... More
Road A - Single Cell 2x2 at Km 2/0(i)

19.5

784

15300.29

... More
Road A - Two Cell 3x3 at Km 2/0(ii)

106.43

784

83508.17

... More
Road B - Single Cell 2x2 at Km 1/6(i) & 1/6(ii)

39

797

31121.22

... More
Vibrated Cement Concrete M20 grade (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including all other incidental charges etc for Wing wall as per MORTH Rev. V Specification No.1000, 1500, 1700, 2200,2300

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/6

46.77

8634

403819.2

... More
Road A - Single Cell 2x2 at Km 1/6

46.77

8643

404249.48

... More
Road A - Single Cell 2x2 at Km 2/0(i)

46.77

8643

404249.48

... More
Road A - Two Cell 3x3 at Km 2/0(ii)

130.79

8282

1083227.63

... More
Road B - Single Cell 2x2 at Km 1/6(i) & 1/6(ii)

93.54

8818

824862.85

... More
Vibrated Cement Concrete M20 grade (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including all other incidental charges etc for Parapet Wall as per MORTH Rev. V Specification No.1000, 1500, 1700, 2200,2300

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/6

1.17

11881

13901.69

... More
Road A - Single Cell 2x2 at Km 1/6

1.17

11890

13912.46

... More
Road A - Single Cell 2x2 at Km 2/0(i)

1.17

11890

13912.46

... More
Road A - Two Cell 3x3 at Km 2/0(ii)

3.24

11428

37028.79

... More
Road B - Single Cell 2x2 at Km 1/6(i) & 1/6(ii)

2.34

12065

28234.28

... More
Filling Gravel behind the culvert walls with clean gritty free drainage gravel including cost and drainage gravel having PHI value more than 35 conveyence of gravel to worksite laying, handling charges and filling in layers tamping under Optimum Moisture content to get the maximum density, including watering, with all leads and lifts for water and allother incidental charges, etc.., Complete as per Cl. 710.1.4 & Appendix 6 of IRC 78-2014 as per MORTH Rev. V Specification No.1000

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/6

13.03

324

4228.24

... More
Road A - Single Cell 2x2 at Km 1/6

13.03

324

4228.24

... More
Road A - Single Cell 2x2 at Km 2/0(i)

13.03

324

4228.24

... More
Road A - Two Cell 3x3 at Km 2/0(ii)

17.38

324

5639.81

... More
Road B - Single Cell 2x2 at Km 1/6(i) & 1/6(ii)

26.9

324

8729.05

... More
Providing and fixing PVC Seepage Pipes of 100mm dia at 1.0m c/c staggered of required lengths for abutments and return walls including cost and conveyance of all materials to work site and labour charges for fixing etc, complete to drain of the backfill as per MOR&H Vth specification No.2706

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/6

9.6

177

1704

... More
Road A - Single Cell 2x2 at Km 1/6

9.6

177

1704

... More
Road A - Single Cell 2x2 at Km 2/0(i)

9.6

177

1704

... More
Road A - Two Cell 3x3 at Km 2/0(ii)

9.6

177

1704

... More
Road B - Single Cell 2x2 at Km 1/6(i) & 1/6(ii)

19.2

177

3408

... More
Carted earth with lead of 5 km including cost of Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of Diversion road. (Specification Number as per MORT&H Rev.V 304,305)

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/6 & 1/6

228

238

54264

... More
Road A - Single Cell 2x2 at Km 2/0(i)

114

238

27132

... More
Road A - Two Cell 3x3 at Km 2/0(ii)

171.25

238

40757.5

... More
Road B - Single Cell 2x2 at Km 1/6(i) & 1/6(ii)

228

238

54264

... More
Construction of Granular Sub-Base Grade V of 200mm thick by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (Specification Number as per MORT&H Rev.V 111,112,401,900) for Diversion road.

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/6 & 1/6

45

2542

114419.7

... More
Road A - Single Cell 2x2 at Km 2/0(i)

22.5

2542

57209.85

... More
Road A - Two Cell 3x3 at Km 2/0(ii)

28.13

2542

71525.03

... More
Road B - Single Cell 2x2 at Km 1/6(i) & 1/6(ii)

45

2793

125705.7

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 200mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 (Specification Number as per MORT&H Rev.V 111,112,406,900) for Diversion road.

-

-

-

... More
Road A - Two Cell 3x3 at Km 2/0(ii)

28.13

2840

79909.74

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items (excluding GST)

1

44593114

-

... More
GST 18% for above SubTotal Amount

1

8026760

8026760.56

... More
Total in Figures (SubTotal + GST)

-

-

52619874.77



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.