National Bank For Agriculture And Rural Development Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Works
Road Construction
Eprocure
Opening Date15 Apr 2025
Closing Soon19 May 2025
Tender Amount₹ 17,61,38,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Three cell Box culvert (2x2) @ Km 2/0 (Construction)

12.8

177

2272

... More
Single cell Box culvert (2x2) @ Km 11/8 (Reconstruction)

34.93

13062

456287.1

... More
Providing and laying Tack Coat over primed surface (treated with primer) using 2.50Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction overit including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete (Specification Number as per MORT&H Rev.V 111,112,503,900)

40393

19

795338.17

... More
Supply and fabrication of steel grade Fe-500D steel required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision for spacing bars, cover blocks and all other incidental charges etc., complete as per per MORTH Rev. V specifications No.1600.

-

-

-

... More
Single cell Box culvert (2x2) @ Km 11/4 (Reconstruction)

34.93

13072

456608.8

... More
Single cell Box culvert (2x2) @ Km 7/4 (Construction)

19.5

803

15670.2

... More
Single cell Box culvert (2x2) @ Km 7/8 (Reconstruction)

1.17

12130

14192.55

... More
Vibrated cement Concrete M30 design mix using 20mm and below ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for mixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, formwork, cost of premoulded expansion joints and fixing the same in position etc., excluding steel complete for wearing coat of 75mm uniform thickness over deck slab as per MORTH Rev. V Specification No.1000, 1500, 1700, 2702.

-

-

-

... More
Three cell Box culvert (3x3) @ Km 5/8 (Reconstruction)

0.57

98284

56022.03

... More
Single cell Box culvert (2x2) @ Km 9/0 (i) & (ii) (Construction)

135.25

8794

1189471

... More
Single cell Box culvert (2x2) @ Km 8/8 (ii) (Construction)

2.3

98284

226053.82

... More
Single cell Box culvert (2x2) @ Km 9/6 (i) & 9/6 (ii) (Reconstruction)

39

801

31258.11

... More
Single cell Box culvert (2x2) @ Km 7/6 & 8/4 (Construction)

25.6

177

4544

... More
Single cell Box culvert (2x2) @ Km 7/2 (Reconstruction)

121.57

246

29969.44

... More
Providing and laying Prime Coat over WBM/WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10sqm for pre paratory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete (Specification Number as per MORT&H Rev.V 111,112,502,900)

40393

83

3387760.91

... More
Single cell Box culvert (2x2) @ Km 11/8 (Reconstruction)

2.3

98284

226053.82

... More
Single cell Box culvert (2x2) @ Km 8/8 (i) & 9/4 (Reconstruction)

39

802

31285.8

... More
Single cell Box culvert (2x2) @ Km 11/6 & 12/0(ii) (Construction)

2.34

12093

28298.91

... More
Single cell Box culvert (2x2) @ Km 8/8 (i) & 9/4 (Reconstruction)

25.6

177

4544

... More
Three cell Box culvert (3x3) @ Km 5/8 (Reconstruction)

12.8

177

2272

... More
Single cell Box culvert (2x2) @ Km 11/6 & 12/0(ii) (Construction)

69.86

13062

912574.19

... More
Single cell Box culvert (2x2) @ Km 5/2 (Reconstruction)

34.93

13127

458538.34

... More
Single cell Box culvert (2x2) @ Km 5/2 (Reconstruction)

1.17

12158

14224.86

... More
Single cell Box culvert (2x2) @ Km 7/6 & 8/4 (Construction)

69.86

13099

915147.14

... More
Three cell Box culvert (3x3) @ Km 5/8 (Reconstruction)

22.26

7118

158464.04

... More
Single cell Box culvert (2x2) @ Km 7/6 & 8/4 (Construction)

0.2

98284

19656.85

... More
Single cell Box culvert (2x2) @ Km 11/6 & 12/0(ii) (Construction)

135.25

8766

1185735.4

... More
Single cell Box culvert (2x2) @ Km 8/8 (i) & 9/4 (Reconstruction)

0.2

98284

19656.85

... More
Single cell Box culvert (2x2) @ Km 7/8 (Reconstruction)

67.63

8803

595402.35

... More
Single cell Box culvert (2x2) @ Km 8/8 (ii) (Construction)

67.63

8794

594779.47

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 (Specification Number as per MORT&H Rev.V 111,112,504,900)

2020

9730

19655044.4

... More
Three cell Box culvert (2x2) @ Km 2/0 (Construction)

17.5

7155

125223.18

... More
Single cell Box culvert (2x2) @ Km 7/4 (Construction)

121.57

246

29969.44

... More
Single cell Box culvert (2x2) @ Km 11/4 (Reconstruction)

121.57

246

29969.44

... More
Single cell Box culvert (2x2) @ Km 9/6 (i) & 9/6 (ii) (Reconstruction)

69.86

13081

913860.32

... More
Single cell Box culvert (2x2) @ Km 11/4 (Reconstruction)

1.17

12102

14160.22

... More
Single cell Box culvert (2x2) @ Km 11/4 (Reconstruction)

67.63

8776

593533.73

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP (Specification Number as per MORT&H Rev.V 111,112,507,900)

1212

12382

15007141.56

... More
Single cell Box culvert (2x2) @ Km 8/8 (i) & 9/4 (Reconstruction)

69.86

13090

914503.73

... More
Three cell Box culvert (3x3) @ Km 5/8 (Reconstruction)

139.03

8492

1180731.74

... More
Three cell Box culvert (3x3) @ Km 5/8 (Reconstruction)

427.46

246

105377.44

... More
Three cell Box culvert (3x3) @ Km 1/8 (Construction)

15.75

10263

161648.39

... More
Plain Cement Concrete M15 grade (Nominal mix) 1:2:4 using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants etc. Complete for Levelling Course for Box Culvert as per MORTH Rev. V Specification No. 1000,1500,1700,2100

-

-

-

... More
Construction of Granular Sub-Base Grade III of 100mm thick by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete (Specification Number as per MORT&H Rev.V 111,112,401,900)

3993

3111

12424618.8

... More
Providing RCC M15 Grade Precast HM stone of standard design as per IRC 26:1967 and fixing in position including painting and Lettering etc., complete (as per MORTH SPECIFICATION No.805)

50

574

28732.5

... More
Single cell Box culvert (2x2) @ Km 8/8 (i) & 9/4 (Reconstruction)

135.25

8794

1189471

... More
Single cell Box culvert (2x2) @ Km 11/8 (Reconstruction)

67.63

8766

592911.53

... More
Single cell Box culvert (2x2) @ Km 11/4 (Reconstruction)

39.46

486

19185.45

... More
Single cell Box culvert (2x2) @ Km 5/2 (Reconstruction)

121.57

246

29969.44

... More
Single cell Box culvert (2x2) @ Km 9/2 (i) & (ii) (Construction)

243.14

246

59938.87

... More
Three cell Box culvert (2x2) @ Km 2/0 (Construction)

0.45

98284

44227.92

... More
Three cell Box culvert (3x3) @ Km 1/8 (Construction)

427.46

246

105377.44

... More
Single cell Box culvert (2x2) @ Km 7/2 (Reconstruction)

5.29

7109

37609.63

... More
Single cell Box culvert (2x2) @ Km 7/6 & 8/4 (Construction)

10.57

7100

75050.91

... More
Single cell Box culvert (2x2) @ Km 11/8 (Reconstruction)

1.17

12093

14149.45

... More
Single cell Box culvert (2x2) @ Km 11/4 (Reconstruction)

5.29

7072

37414.8

... More
Single cell Box culvert (2x2) @ Km 7/2 (Reconstruction)

19.5

803

15670.2

... More
Single cell Box culvert (2x2) @ Km 8/8 (ii) (Construction)

1.17

12121

14181.77

... More
Single cell Box culvert (2x2) @ Km 7/6 & 8/4 (Construction)

135.25

8803

1190716.66

... More
Single cell Box culvert (2x2) @ Km 11/0 & 11/2 (Construction)

243.14

246

59938.87

... More
Single cell Box culvert (2x2) @ Km 7/2 & 7/8 (Reconstruction)

39.46

486

19185.45

... More
Single cell Box culvert (2x2) @ Km 9/2 (i) & (ii) (Construction)

4.6

98284

452107.64

... More
Single cell Box culvert (2x2) @ Km 9/6 (i) & 9/6 (ii) (Reconstruction)

39.46

486

19185.45

... More
Three cell Box culvert (3x3) @ Km 5/8 (Reconstruction)

15.75

10226

161068.32

... More
Single cell Box culvert (2x2) @ Km 12/0(i) & 12/2 (Reconstruction)

243.14

246

59938.87

... More
Three cell Box culvert (3x3) @ Km 1/8 (Construction)

139.03

8529

1185852.21

... More
Three cell Box culvert (3x3) @ Km 1/8 (Construction)

12.8

177

2272

... More
Single cell Box culvert (2x2) @ Km 11/4 (Reconstruction)

0.1

98284

9828.43

... More
Single cell Box culvert (2x2) @ Km 11/4 (Reconstruction)

2.3

98284

226053.82

... More
Single cell Box culvert (2x2) @ Km 11/0 & 11/2 (Construction)

69.86

13072

913217.61

... More
Single cell Box culvert (2x2) @ Km 11/8 (Reconstruction)

13.87

324

4500.82

... More
Three cell Box culvert (3x3) @ Km 5/8 (Reconstruction)

12.8

98284

1258038.66

... More
Single cell Box culvert (2x2) @ Km 7/2 (Reconstruction)

13.87

324

4500.82

... More
Single cell Box culvert (2x2) @ Km 9/6 (i) & 9/6 (ii) (Reconstruction)

243.14

246

59938.87

... More
Single cell Box culvert (2x2) @ Km 7/2 (Reconstruction)

34.93

13108

457894.93

... More
Single cell Box culvert (2x2) @ Km 7/4 (Construction)

1.17

12139

14203.31

... More
Single cell Box culvert (2x2) @ Km 7/2 (Reconstruction)

67.63

8813

596024.54

... More
Single cell Box culvert (2x2) @ Km 11/0 & 11/2 (Construction)

2.34

12102

28320.44

... More
Single cell Box culvert (2x2) @ Km 9/2 (i) & (ii) (Construction)

2.34

12121

28363.54

... More
Three cell Box culvert (2x2) @ Km 2/0 (Construction)

83.51

13013

1086757.39

... More
Single cell Box culvert (2x2) @ Km 7/4 (Construction)

67.63

8813

596024.54

... More
Total in Figures (SubTotal + GST)

-

-

176137174.14

... More
Single cell Box culvert (2x2) @ Km 7/4 (Construction)

34.93

13108

457894.93

... More
Single cell Box culvert (2x2) @ Km 7/2 (Reconstruction)

1.17

12139

14203.31

... More
Single cell Box culvert (2x2) @ Km 7/4 (Construction)

13.87

324

4500.82

... More
Single cell Box culvert (2x2) @ Km 8/8 (ii) (Construction)

19.5

802

15642.9

... More
Single cell Box culvert (2x2) @ Km 5/2 (Reconstruction)

19.5

805

15697.7

... More
Three cell Box culvert (3x3) @ Km 1/8 (Construction)

22.26

7155

159283.88

... More
Three cell Box culvert (2x2) @ Km 2/0 (Construction)

100.11

8694

870429.42

... More
Single cell Box culvert (2x2) @ Km 9/2 (i) & (ii) (Construction)

10.57

7091

74953.56

... More
Single cell Box culvert (2x2) @ Km 5/2 (Reconstruction)

13.87

324

4500.82

... More
Single cell Box culvert (2x2) @ Km 8/8 (ii) (Construction)

12.8

177

2272

... More
Single cell Box culvert (2x2) @ Km 8/8 (ii) (Construction)

5.29

7091

37512.24

... More
Single cell Box culvert (2x2) @ Km 7/6 & 8/4 (Construction)

2.34

12130

28385.09

... More
Providing RCC M15 Grade Precast KM stone of standard design as per IRC 8:1980 and fixing in position including painting and Lettering ect., complete (as per MORTH SPECIFICATION No.805)

12

2197

26364

... More
Single cell Box culvert (2x2) @ Km 12/0(i) & 12/2 (Reconstruction)

10.57

7063

74661.62

... More
Single cell Box culvert (2x2) @ Km 7/8 (Reconstruction)

12.8

177

2272

... More
Single cell Box culvert (2x2) @ Km 8/8 (i) & 9/4 (Reconstruction)

26.9

324

8729.05

... More
Single cell Box culvert (2x2) @ Km 7/8 (Reconstruction)

5.29

7100

37560.96

... More
Single cell Box culvert (2x2) @ Km 7/4 (Construction)

5.29

7109

37609.63

... More
Single cell Box culvert (2x2) @ Km 12/0(i) & 12/2 (Reconstruction)

26.9

324

8729.05

... More
Single cell Box culvert (2x2) @ Km 9/0 (i) & (ii) (Construction)

10.57

7091

74953.56

... More
Single cell Box culvert (2x2) @ Km 7/8 (Reconstruction)

19.5

802

15656.55

... More
Single cell Box culvert (2x2) @ Km 9/2 (i) & (ii) (Construction)

39

802

31285.8

... More
Single cell Box culvert (2x2) @ Km 7/6 & 8/4 (Construction)

26.9

324

8729.05

... More
Vibrated Cement Concrete M20 grade (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including all other incidental charges etc for Parapet Wall as per MORTH Rev. V Specification No.1000, 1500, 1700, 2200,2300

-

-

-

... More
Single cell Box culvert (2x2) @ Km 11/6 & 12/0(ii) (Construction)

10.57

7063

74661.62

... More
Single cell Box culvert (2x2) @ Km 8/8 (ii) (Construction)

13.87

324

4500.82

... More
Single cell Box culvert (2x2) @ Km 11/0 & 11/2 (Construction)

26.9

324

8729.05

... More
Single cell Box culvert (2x2) @ Km 7/4 (Construction)

12.8

177

2272

... More
Construction of Granular Sub-Base Grade V of 150mm thick by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete (Specification Number as per MORT&H Rev.V 111,112,401,900)

5990

3017

18076981.4

... More
Single cell Box culvert (2x2) @ Km 11/8 (Reconstruction)

12.8

177

2272

... More
Supply and fabrication of steel grade Fe-240 steel required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision for spacing bars, cover blocks and all other incidental charges etc., complete as per per MORTH Rev. V specifications No.1600.

-

-

-

... More
Direction and Place Identification Signs- Type- IV Providing and erecting direction and Place Identification Retro-reflectorised Sign made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 -09, specification and fixed over 2mm thickAluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro- reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012. (as per MORT&H Specification No.801) (For sign having area more than 0.9sq.m) Type-IV

1.08

11805

12749.4

... More
Single cell Box culvert (2x2) @ Km 9/0 (i) & (ii) (Construction)

243.14

246

59938.87

... More
Single cell Box culvert (2x2) @ Km 11/6 & 12/0(ii) (Construction)

243.14

246

59938.87

... More
Single cell Box culvert (2x2) @ Km 8/8 (ii) (Construction)

0.1

98284

9828.43

... More
Three cell Box culvert (2x2) @ Km 2/0 (Construction)

107.55

807

86804.68

... More
Single cell Box culvert (2x2) @ Km 9/2 (i) & (ii) (Construction)

69.86

13090

914503.73

... More
Single cell Box culvert (2x2) @ Km 9/6 (i) & 9/6 (ii) (Reconstruction)

10.57

7081

74856.21

... More
Three cell Box culvert (3x3) @ Km 1/8 (Construction)

12.8

98284

1258038.66

... More
Single cell Box culvert (2x2) @ Km 11/0 & 11/2 (Construction)

10.57

7072

74758.86

... More
Single cell Box culvert (2x2) @ Km 9/2 (i) & (ii) (Construction)

0.2

98284

19656.85

... More
Single cell Box culvert (2x2) @ Km 7/8 (Reconstruction)

13.87

324

4500.82

... More
Single cell Box culvert (2x2) @ Km 5/2 (Reconstruction)

67.63

8831

597270.29

... More
Single cell Box culvert (2x2) @ Km 7/8 (Reconstruction)

0.1

98284

9828.43

... More
Filling Gravel behind the Culverts walls with clean gritty free drainage gravel including cost and drainage gravel having PHI value more than 35 conveyence of gravel to worksite laying, handling charges and filling in layers tamping under Optimum Moisture content to get the maximum density, including watering, with all leads and lifts for water and allother incidental charges, etc.., Complete as per Cl. 710.1.4 & Appendix 6 of IRC 78-2014 as per MORTH Rev. V Specification No.1000

-

-

-

... More
Three cell Box culvert (3x3) @ Km 1/8 (Construction)

133.05

807

107385.99

... More
Single cell Box culvert (2x2) @ Km 12/0(i) & 12/2 (Reconstruction)

2.34

12093

28298.91

... More
SUB ESTIMATE Dismantling the existing plain cement concrete in the existing damaged culvert and clearing aways from the work site and carefully stacking the usefull material for reuse on the road side departmental officer including all labour and incidental charges etc.,complete

-

-

-

... More
Three cell Box culvert (2x2) @ Km 2/0 (Construction)

17.39

324

5643.06

... More
Single cell Box culvert (2x2) @ Km 7/6 & 8/4 (Construction)

4.6

98284

452107.64

... More
Single cell Box culvert (2x2) @ Km 11/0 & 11/2 (Construction)

135.25

8776

1186979.7

... More
Three cell Box culvert (2x2) @ Km 2/0 (Construction)

15.75

10263

161648.39

... More
Single cell Box culvert (2x2) @ Km 5/2 (Reconstruction)

0.1

98284

9828.43

... More
Three cell Box culvert (2x2) @ Km 2/0 (Construction)

3.3

11727

38702.1

... More
Single cell Box culvert (2x2) @ Km 8/8 (i) & 9/4 (Reconstruction)

4.6

98284

452107.64

... More
Single cell Box culvert (2x2) @ Km 9/6 (i) & 9/6 (ii) (Reconstruction)

2.34

12111

28341.99

... More
Single cell Box culvert (2x2) @ Km 9/0 (i) & (ii) (Construction)

2.34

12121

28363.54

... More
Single cell Box culvert (2x2) @ Km 12/0(i) & 12/2 (Reconstruction)

69.86

13062

912574.19

... More
Single cell Box culvert (2x2) @ Km 5/2 (Reconstruction)

12.8

177

2272

... More
Clearing Scrub jungle by cutting, removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees upto 300mm girth. (Specification Number as per MORT&H Rev.V 201)

20832

5

123742.08

... More
Single cell Box culvert (2x2) @ Km 11/0 & 11/2 (Construction)

39

800

31230.81

... More
Three cell Box culvert (3x3) @ Km 1/8 (Construction)

17.39

324

5643.06

... More
Single cell Box culvert (2x2) @ Km 9/2 (i) & (ii) (Construction)

25.6

177

4544

... More
Single cell Box culvert (2x2) @ Km 9/6 (i) & 9/6 (ii) (Reconstruction)

135.25

8785

1188225.35

... More
Vibrated Cement Concrete M20 grade (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including all other incidental charges etc for Retaining wall as per MORTH Rev. V Specification No.1000, 1500, 1700, 2200,2300

-

-

-

... More
Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation of BOx Culvert (Specification No.111,112,304.)

-

-

-

... More
Single cell Box culvert (2x2) @ Km 7/4 (Construction)

0.1

98284

9828.43

... More
Single cell Box culvert (2x2) @ Km 7/2 (Reconstruction)

0.1

98284

9828.43

... More
Vibrated Reinforced Cement concrete in M25 grade (design mix) using 20mm and below ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete for Base slab Side wall & Deck slab of CELL BOX as per MORTH Rev. V Specification No. 1000,1500,1700,2200,2300

-

-

-

... More
Single cell Box culvert (2x2) @ Km 12/0(i) & 12/2 (Reconstruction)

135.25

8766

1185735.4

... More
Single cell Box culvert (2x2) @ Km 9/0 (i) & (ii) (Construction)

25.6

177

4544

... More
Three cell Box culvert (3x3) @ Km 5/8 (Reconstruction)

147.51

12215

1801933.48

... More
Single cell Box culvert (2x2) @ Km 11/8 (Reconstruction)

121.57

246

29969.44

... More
GST 18% for above SubTotal Amount

1

26868382

26868382.5

... More
Single cell Box culvert (2x2) @ Km 7/2 (Reconstruction)

12.8

177

2272

... More
Three cell Box culvert (3x3) @ Km 5/8 (Reconstruction)

45.92

486

22326.3

... More
Single cell Box culvert (2x2) @ Km 7/6 & 8/4 (Construction)

243.14

246

59938.87

... More
Single cell Box culvert (2x2) @ Km 11/8 (Reconstruction)

19.5

800

15601.76

... More
Single cell Box culvert (2x2) @ Km 9/2 (i) & (ii) (Construction)

135.25

8794

1189471

... More
Single cell Box culvert (2x2) @ Km 12/0(i) & 12/2 (Reconstruction)

39

800

31203.51

... More
Single cell Box culvert (2x2) @ Km 11/0 & 11/2 (Construction)

4.6

98284

452107.64

... More
Single cell Box culvert (2x2) @ Km 11/4 (Reconstruction)

12.8

177

2272

... More
Single cell Box culvert (2x2) @ Km 9/6 (i) & 9/6 (ii) (Reconstruction)

4.6

98284

452107.64

... More
Single cell Box culvert (2x2) @ Km 7/8 (Reconstruction)

121.57

246

29969.44

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete (Specification Number as per MORT&H Rev.V 111,112,406,900)

10099

2840

28688532.27

... More
Single cell Box culvert (2x2) @ Km 11/4 (Reconstruction)

13.87

324

4500.82

... More
Providing and fixing PVC Seepage Pipes of 100mm dia at 1.0m c/c staggered of required lengths for abutments and return walls including cost and conveyance of all materials to work site and labour charges for fixing etc, complete to drain of the backfill as per MOR&H Vth specification No.2706

-

-

-

... More
Three cell Box culvert (3x3) @ Km 1/8 (Construction)

0.57

98284

56022.03

... More
Single cell Box culvert (2x2) @ Km 11/6 & 12/0(ii) (Construction)

25.6

177

4544

... More
Sub Total Amount for above all items (excluding GST)

1

149268791

-

... More
Vibrated Reinforced Cement concrete in M30 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for Approach Slab

-

-

-

... More
Single cell Box culvert (2x2) @ Km 8/8 (i) & 9/4 (Reconstruction)

243.14

246

59938.87

... More
Single cell Box culvert (2x2) @ Km 8/8 (ii) (Construction)

34.93

13090

457251.86

... More
Single cell Box culvert (2x2) @ Km 9/0 (i) & (ii) (Construction)

39

802

31285.8

... More
Single cell Box culvert (2x2) @ Km 12/0(i) & 12/2 (Reconstruction)

39.46

486

19185.45

... More
Single cell Box culvert (2x2) @ Km 11/6 & 12/0(ii) (Construction)

0.2

98284

19656.85

... More
Single cell Box culvert (2x2) @ Km 7/6 & 8/4 (Construction)

39

802

31313.1

... More
Single cell Box culvert (2x2) @ Km 8/8 (ii) (Construction)

121.57

246

29969.44

... More
Single cell Box culvert (2x2) @ Km 11/8 (Reconstruction)

5.29

7063

37366.13

... More
Single cell Box culvert (2x2) @ Km 9/6 (i) & 9/6 (ii) (Reconstruction)

26.9

324

8729.05

... More
Single cell Box culvert (2x2) @ Km 8/8 (i) & 9/4 (Reconstruction)

2.34

12121

28363.54

... More
Three cell Box culvert (3x3) @ Km 1/8 (Construction)

4.83

11647

56255.64

... More
Single cell Box culvert (2x2) @ Km 11/6 & 12/0(ii) (Construction)

39

800

31203.51

... More
Single cell Box culvert (2x2) @ Km 11/6 & 12/0(ii) (Construction)

26.9

324

8729.05

... More
Single cell Box culvert (2x2) @ Km 11/4 (Reconstruction)

19.5

800

15615.41

... More
Single cell Box culvert (2x2) @ Km 5/2 (Reconstruction)

2.3

98284

226053.82

... More
Single cell Box culvert (2x2) @ Km 9/0 (i) & (ii) (Construction)

69.86

13090

914503.73

... More
Carted earth including cost and conveyance an average lead of 5km to worksite and stacking them on road side for taking premeasurements and spreading the same in the low berms as directed by the Engineer with initial lift including all labour charges and consolidation with power roller including all tools and plants and all other incidental charges etc., complete for formation of side Berms in accordance with standard Specifications as per MORT&H Vth Rev., sec.304 &305

24553

238

5843614

... More
Single cell Box culvert (2x2) @ Km 12/0(i) & 12/2 (Reconstruction)

0.2

98284

19656.85

... More
Single cell Box culvert (2x2) @ Km 8/8 (i) & 9/4 (Reconstruction)

10.57

7091

74953.56

... More
Single cell Box culvert (2x2) @ Km 11/6 & 12/0(ii) (Construction)

4.6

98284

452107.64

... More
Single cell Box culvert (2x2) @ Km 11/8 (Reconstruction)

0.1

98284

9828.43

... More
Single cell Box culvert (2x2) @ Km 5/2 (Reconstruction)

19.73

486

9592.73

... More
Single cell Box culvert (2x2) @ Km 9/0 (i) & (ii) (Construction)

0.2

98284

19656.85

... More
Three cell Box culvert (3x3) @ Km 5/8 (Reconstruction)

4.83

11610

56077.75

... More
Single cell Box culvert (2x2) @ Km 9/0 (i) & (ii) (Construction)

26.9

324

8729.05

... More
Three cell Box culvert (3x3) @ Km 1/8 (Construction)

147.51

12252

1807361.85

... More
Three cell Box culvert (3x3) @ Km 5/8 (Reconstruction)

133.05

804

107012.12

... More
Single cell Box culvert (2x2) @ Km 12/0(i) & 12/2 (Reconstruction)

25.6

177

4544

... More
Single cell Box culvert (2x2) @ Km 11/0 & 11/2 (Construction)

0.2

98284

19656.85

... More
Three cell Box culvert (2x2) @ Km 2/0 (Construction)

7.95

98284

781359.95

... More
Single cell Box culvert (2x2) @ Km 8/8 (i) & 9/4 (Reconstruction)

39.46

486

19185.45

... More
Single cell Box culvert (2x2) @ Km 7/8 (Reconstruction)

34.93

13099

457573.57

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Single cell Box culvert (2x2) @ Km 11/0 & 11/2 (Construction)

25.6

177

4544

... More
Single cell Box culvert (2x2) @ Km 7/2 (Reconstruction)

2.3

98284

226053.82

... More
Single cell Box culvert (2x2) @ Km 9/6 (i) & 9/6 (ii) (Reconstruction)

25.6

177

4544

... More
Three cell Box culvert (2x2) @ Km 2/0 (Construction)

281.13

246

69304.17

... More
Single cell Box culvert (2x2) @ Km 12/0(i) & 12/2 (Reconstruction)

4.6

98284

452107.64

... More
Single cell Box culvert (2x2) @ Km 7/4 (Construction)

2.3

98284

226053.82

... More
Three cell Box culvert (3x3) @ Km 5/8 (Reconstruction)

17.39

324

5643.06

... More
Single cell Box culvert (2x2) @ Km 9/0 (i) & (ii) (Construction)

4.6

98284

452107.64

... More
Single cell Box culvert (2x2) @ Km 9/6 (i) & 9/6 (ii) (Reconstruction)

0.2

98284

19656.85



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.