National Bank For Agriculture And Rural Development Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Eprocure
Opening Date13 Jun 2020
Closing Date14 Jul 2020
Tender Amount₹ 5,02,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
c) Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

1608

-

4.4

... More
Picking the existing BT surface up to 50 mm thick depth etc complete as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed for the work and including all other incidental charges etc., complete as per MORTH Specification.

-

-

-

... More
(b) Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

3006.3

-

15.31

... More
c) Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

1706.3

-

15.31

... More
Granular Sub-base with Graded Material (Table:-400-1)-Plant Mix Method Construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in uniform layers of 150mm thick with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification for grading-V Material.

-

-

-

... More
(a) Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

1916.8

-

1383.64

... More
Providing and laying, spreading and compacting graded stone aggregates to Wet mix macadam specification including premixing the materials with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub base course on well prepared surface and compacting with Vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 406 of MORTH Rev-5.

-

-

-

... More
(a) Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

3194.6

-

1688.34

... More
(b) Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

2254.7

-

1688.34

... More
c) Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

1279.7

-

1688.34

... More
Providing and laying Prime Coat over WMM surface using 7 Kgs of Emulsion Bitumen (SS I) for 10sqm for preparatory to another Bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5.

-

-

-

... More
(a) Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

12778.2

-

50.87

... More
(b) Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

9018.8

-

50.88

... More
c) Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

5118.8

-

50.86

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.5kgs Bitumen Emulsion (RS I) for 10sqm for preparatory to another Bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5.

-

-

-

... More
(a) Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

12778.2

-

10.81

... More
(b) Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

9018.8

-

10.81

... More
c) Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

5118.8

-

10.8

... More
Providing and laying 50mm thick Consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20mm 0.430cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below IRC metal with 37 kg of VG30 bitumen for premixing per 10sqm including coat and conveyance of all materials to CMP site including heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 tones capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10t Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, paver finisher/ 9m paver finisher, Vibratory roller and all other Tools and plants required, including fuel and all other and incidental charges etc., complete as per Specification using CMP as per clause 504 of MORTH rev-5.

-

-

-

... More
(a) Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

639.9

-

5406.86

... More
(b) Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

451.9

-

5406.86

... More
c) Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

256.9

-

5406.86

... More
Providing and laying Bituminous concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50 - 2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tonnes capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10t Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, paver finisher/ 9m paver finisher, Vibratory roller and all other Tools and plants required, including fuel and all other and incidental charges etc., complete as per Specification using CMP as per clause 507 of MORTH rev-5.

-

-

-

... More
(a) Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

383.4

-

6744.98

... More
(b) Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

270.6

-

6744.98

... More
c) Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

153.6

-

6744.98

... More
Providing and laying earth for making up berms using Carted earth with a lead of 5 Km including Labour charges for spreading, hire and fuel charges for all T & P employed etc., complete as directed by the departmental officers for filling labour charges only.

-

-

-

... More
(a) Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

3801.6

-

154.57

... More
(b) Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

2376

-

154.57

... More
c) Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

1061

-

154.57

... More
Providing RCC M15 grade precast HM stone of stanard design as per IRC 26-1967 and fixing in position including painting and printing etc complete (as per MORTH & H specification no 804)

-

-

-

... More
(a) Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

13

-

256

... More
(b) Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

10

-

256

... More
c) Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

5

-

256

... More
Providing RCC M15 grade precast KM stone of stanard design as per IRC 8 - 1980 and fixing in position including painting and printing etc complete (as per MORTH & H specification no 804)

-

-

-

... More
(a) Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

3

-

906

... More
(b) Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

2

-

906

... More
c) Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

1

-

906

... More
Dismantling the RR Masonry in Cement Mortar in the existing culvrt and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.

-

-

-

... More
(b.3) Construction of Box Culvert at Km 0/2 for the work of Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

17.11

-

193

... More
Earthwork Excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including Cost of all labour, equipments and all incidental charges such as cofferdams, sheeting, shoring bracing and their subsequent removal, removal of logs, stumps,grubs,and other deleterious matter and obstructins, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF RETAINING WALL, WELL PROTECTIVE WALL AND BOX CULVERT.

-

-

-

... More
(a.1) Construction of Retaining wall at Km.2/4 for the work of Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

333

-

84

... More
(a.2) Construction of Well Protective wall at Km.2/6 for the work of Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

112.5

-

84

... More
(b.1) Construction of Retaining wall at Km.2/2 for the work of Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

347

-

84

... More
(b.2) Construction of Well Protective wall at Km 0/8 for the work of Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

150

-

84

... More
(b.3) Construction of Box Culvert at Km 0/2 for the work of Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

43.1

-

84

... More
(c.1) Construction of Retaining wall at Km.0/8 for the work of Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

351.12

-

84

... More
Vibrated Cement Concrete of Grade M-20, Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for FOOTINGS OF RETAINING WALl.

-

-

-

... More
(a.1) Construction of Retaining wall at Km.2/4 for the work of Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

99.9

-

5334

... More
(b.1) Construction of Retaining wall at Km.2/2 for the work of Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

104

-

5249

... More
(c.1) Construction of Retaining wall at Km.0/8 for the work of Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

105.4

-

5252

... More
Vibrated Cement Concrete of Grade M-20, Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for STEM OF RETAINING WALL.

-

-

-

... More
(a.1) Construction of Retaining wall at Km.2/4 for the work of Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

323.1

-

7420

... More
(b.1) Construction of Retaining wall at Km.2/2 for the work of Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

336.3

-

7335

... More
(c.1) Construction of Retaining wall at Km.0/8 for the work of Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

340.8

-

7338

... More
Providing and fixing seepage pipes of 110mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill in the retaining wall.

-

-

-

... More
(a.1) Construction of Retaining wall at Km.2/4 for the work of Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

292

-

172.8

... More
(b.1) Construction of Retaining wall at Km.2/2 for the work of Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

304

-

172.8

... More
(c.1) Construction of Retaining wall at Km.0/8 for the work of Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

186

-

172.8

... More
Vibrated Cement Concrete of Grade M-20, Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for PCC PARAPET OVER AND BOX CULVERT.

-

-

-

... More
(a.1) Construction of Retaining wall at Km.2/4 for the work of Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

25.6

-

8865

... More
(b.1) Construction of Retaining wall at Km.2/2 for the work of Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

23.1

-

8781

... More
(b.3) Construction of Box Culvert at Km 0/8 for the work of Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

47.82

-

7501

... More
(c.1) Construction of Retaining wall at Km.0/8 for the work of Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

25.8

-

8496

... More
Filling behind the Retaining wall with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete for Retaining wall And Box Culvert.

-

-

-

... More
(a.1) Construction of Retaining wall at Km.2/4 for the work of Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

497

-

273

... More
(a.2) Construction of Well Protective wall at Km.2/6 for the work of Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

33.8

-

273

... More
(b.1) Construction of Retaining wall at Km.2/2 for the work of Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

510.6

-

273

... More
(b.2) Construction of Well Protective wall at Km 0/8 for the work of Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

39.15

-

273

... More
(b.3) Construction of Box Culvert at Km 0/8 for the work of Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

21.6

-

273

... More
(c.1) Construction of Retaining wall at Km.0/8 for the work of Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

524.2

-

273

... More
Plain Cement Concrete of Grade M-15, Nominal Mix, 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE OF WELL PROTECTIVE WALL AND BOX CULVERT.

-

-

-

... More
(a.2) Construction of Well Protective wall at Km.2/6 for the work of Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

9

-

5098

... More
(b.2) Construction of Well Protective wall at Km 0/8 for the work of Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

12

-

4992

... More
(b.3) Construction of Box Culvert at Km 0/8 for the work of Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

4.28

-

5045

... More
Vibrated Cement Concrete of Grade M-15, Nominal Mix, 12:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for WELL PROTECTIVE WALL.

-

-

-

... More
(a.2) Construction of Well Protective wall at Km.2/6 for the work of Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

56.7

-

7142

... More
(b.2) Construction of Well Protective wall at Km 0/8 for the work of Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

75.6

-

7020

... More
Vibrated Cement Concrete of Grade M-20, Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BOX CULVERT.

-

-

-

... More
(b.3) Construction of Box Culvert at Km 0/8 for the work of Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

9.6

-

5228

... More
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site but excluding cost and fabrication of steel and including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, formwork, cost of premoulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab for BASE SLAB, STEM AND TOP SLAB OF BOX CULVERT.

-

-

-

... More
(b.3) Construction of Box Culvert at Km 0/8 for the work of Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

26.43

-

9807

... More
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings,including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete for Box Culvert.

-

-

-

... More
(b.3) Construction of Box Culvert at Km 0/8 for the work of Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

2.19

-

73383

... More
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site but excluding cost and fabrication of steel and including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, formwork, cost of premoulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over Top slab of Box Culvert.

-

-

-

... More
(b.3) Construction of Box Culvert at Km 0/8 for the work of Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

17.16

-

575.4

... More
Direction and Place identification signs-Type-IV Providing and erecting direction and place identification Retro Refectorised signs made out of Cube corner Micro Prismatic Grade Sheeting confirming to Type IV standards to IRC 67-2012 and ASTM D 4956-09, Specification and fixed over 2mm thick Aluminium sheet fixed over back supporting frame of 25mm x 25mm x 3mm Mild steel angle and supported on a mild steel angle post 75mm x 75mm x 6mm with a clear hieght of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. the sign post should be painted as per IRC 67 - 2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cm x 45cm x 60cm size including cost and conveyance of all materials, equipments, machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. Micro Prismatic grade retro-reflectorised sheet shall consist of minimum co-efficient of Retro-reflection as per Table 6.9 of IRC 67-2012. The retro reflective sheeting shall be covered and under 10 year warranty issued for field performance and certified copy of 3 years outdoor exposure report shall be obtained as per IRC- 67-2012. (as per MORT&H specification 801) (For location of blackspot, curve, sharp bend, junction, ghat roads, and critical zone application)

-

-

-

... More
For sign having area upto 0.9 sqm

-

-

-

... More
(a) Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

3.24

-

9057

... More
(b) Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

4.32

-

9057

... More
c) Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

2.16

-

9057

... More
Retro Reflectorised Traffic signs (Without definition board) Type-IV Providing and erecting of Retro Refectorised Retro Refectorised Cautionary, mandatory and informatory sign (without definition board) made out of High Intensity Prismatic Grade Sheeting confirming to Type IV standards to IRC 67-2012 and ASTM D 4956-09, Specification and fixed over 2mm thick Aluminium sheet fixed over back supporting frame of 25mm x 25mm x 3mm Mild steel angle and supported on a mild steel angle post 75mm x 75mm x 6mm with a clear hieght of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. the sign post should be painted as per IRC 67 - 2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cm x 45cm x 60cm size including cost and conveyance of all materials, equipments, machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity retro-reflectorised sheet shall consist of minimum co-efficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro reflective sheeting shall be covered and under 7 year warranty issued for field performance and certified copy of 3 years outdoor exposure report shall be obtained as per IRC- 67-2012. (as per MORT&H specification 801)

-

-

-

... More
90 cm Equilateral Triangle

-

-

-

... More
(a) Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

8

-

4048

... More
(b) Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

6

-

4048

... More
c) Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

8

-

4048

... More
Providing and laying of hot applied thermoplastic cmpound 2.5mm thick including reflectorising glass beeds at 250 gms per sqm area thickness of 2.5mm is exclusive of surface applied glass beeds as per IRC:35, the finished surface to be level, uniform anf free from streaks and holes etc., complete.

-

-

-

... More
(a) Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

646

-

841

... More
(b) Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

480

-

841

... More
c) Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

268

-

841

... More
Providing and erecting single sided double guard metal Beam Crash Barrier System 1.80m high, comprising of 3mm thick wall "w" Beams posts and spacer channels shall be made cold roll forming using HD confirm to IS 5986 Fe 410 / 360 and dip galvanized having Zinc Mass of 550gms/sqm minimum 95mm above road / ground lavel fixed on ISMC serier channel vertical post 150x755x5mm spaced 2m center to center 312mmx83mm flange width x 3mm thick, 4318mm long post directely embedded in the concrete (M15) pit size 350x350x800mm for a depth of 750mm below ground. All fixing bolts and nuts hot dip galvanized confirming to IS 1367 clause 4.60 all complete as per technical specification as directed by the Engineer - in Charge.

-

-

-

... More
(b) Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

84

-

5864

... More
c) Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

20

-

5864

... More
Providing and fixing Reflective road studs of category 'A' raised Pavement Markers made out of poly carbonate / ABS Moulded body confirming to ASTM D 788 and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with retro reflectance and chromaticity values confirming to ASTM F 4280. The reflective raised pavement markers shall also confirm to MORTH circular No RW/NH 33023/10/ 97 DO III Dt:11.06.97 and the length, height and width of the shall not be less than 15mm, 90mm and 100mm and with minimum reflective area of 13 Sq.cm on each side and the slope to the base shall be 35 +/- 5 degree. Each reflector shall have a CIL not less than values specified in table 2 of said MORT &H Circular. The strength of detachment of the integrated Cylinderical shanks, (of diameter not less than 19 +/- 2mm and height not less than 30 + /- 2mm) from the body is to be a minimum value of 500 kgf. Fixing will be by drilling holes on the road for the shanks to o inside, without nails and using epoxy resin based adhesive as per manufacture's recommendation and complete as directed by the engineer. The marker shall support a load of 13635 kg tested in acordance with ASTM D 4280 and confirming to IRC 35-2015 guideliness and MORT&H specification 804 etc., Complete.

-

-

-

... More
(a) Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

1400

-

414

... More
(b) Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

480

-

414

... More
c) Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

260

-

414

... More
Hazard Marker Traffic Signs - Type - IV Providing and fixing of Retro Refectorised Hazard Marker Traffic Sign made out of High Intensity Prismatic Grade Sheeting confirming to Type IV standards to IRC 67-2012 and ASTM D 4956-09, Specification and fixed over 2mm thick Aluminium sheet fixed over back supporting frame of 25mm x 25mm x 3mm Mild steel angle and supported on a mild steel angle post 75mm x 75mm x 6mm and 0.60m below ground level. The sign post should be painted as per IRC 67 - 2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cm x 45cm x 60cm size including cost and conveyance of all materials, equipments, machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity retro-reflectorised sheet shall consist of minimum co-efficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro reflective sheeting shall be covered and under 7 year warranty issued for field performance and certified copy of 3 years outdoor exposure report shall be obtained as per IRC- 67-2012. (as per MORT&H specification 801) 30x90cm Rectangular

-

-

-

... More
(a) Upgradation of Palacode Bye Pass Road to Belerahalli Km 0/0-3/230

6

-

3342

... More
(b) Upgradation of Samanoor Road to Dhoddabadagandahalli Road Km 0/0-2/400

10

-

3342

... More
c) Upgradation of Palacode Kaveripattinam Road to Mottaiyankottai (Via) Manukankottai Km 0/0-1/340

6

-

3342

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items (excluding GST)

1

-

44814891.17

... More
GST 12% for above SubTotal Amount

1

-

5377786.94

... More
Total in Figures (SubTotal + GST)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.