National Bank For Agriculture And Rural Development Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date8 Jan 2024
Closing Date23 Jan 2024
Tender Amount₹ 6,43,67,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road C

1692

9136

5.4

... More
Construction of granular sub - base Gr-V of 200 mm thick by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density (Specification Number as per MORTH Rev.V 111,112,401,900).

-

-

-

... More
Road A

1354

2029957

1499.23

... More
Construction of granular sub - base Gr-V of 150 mm thick by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density (Specification Number as per MORTH Rev.V 111,112,401,900).

-

-

-

... More
Road B

982

1437677

1464.03

... More
Road C

913

1336659

1464.03

... More
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including pre mixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc.,(Specification Number as per MORTH Rev.V 111,112,406,900).

-

-

-

... More
Road A

1714

3137871

1830.73

... More
Road B

1757

3216592

1830.73

... More
Road C

1609

2945644

1830.73

... More
Providing and laying of prime coat over WBM/WMM surface using 7 kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc,(Specification Number as per MORTH Rev.V 111,112,502,900)

-

-

-

... More
Road A

6855

518100

75.58

... More
Road B

7025

531090

75.6

... More
Road C

6435

486486

75.6

... More
Providing and laying Tack Coat over WBM/WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion(RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,(Specification Number as per MORTH Rev.V 111,112,503,900).

-

-

-

... More
Road A

6855

116535

17

... More
Road B

7025

119495

17.01

... More
Road C

6435

109459

17.01

... More
Providing and laying 50mm consolidated thick bituminous macadam using 0.2cum of 26.5-13.2mm, 0.43cum of 13.22-2.36mm and 0.08 cum of 2.36mm and blow size IRC metal with 37 kg of VG30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross section and consolidated by 8-10 tone vibrator roller to the require density etc including labour for attending the paver to site, etc including hire charges and fuel charges for 20-30 ton CMP with bitumen boiler, tipper trucks, paver finisher / vibrator roller and all other tools and plants required including fuel and all other incidental charges etc (Specification Number as per MORTH Rev.V 111,112,504,900).

-

-

-

... More
Road A

343

2725073

7944.82

... More
Road B

352

2799674

7953.62

... More
Road C

322

2561065

7953.62

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 30mm with mechanical paver finisher to the specified grades and cross sections and consolidatedby8-10tonne Vibratory/ Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/9m paver finisher, Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc.,(Specification Number as per MORTH Rev.V 111,112,507,900).

-

-

-

... More
Road A

206

2117453

10278.9

... More
Road B

211

2172002

10293.85

... More
Road C

194

1997006

10293.85

... More
Carted earth including cost and conveyance an average lead 5 km to worksite and stacking them on road side for taking premeasurements and spreading the same in the low berms as directed by the engineer with initial lift including all labour charges and consolidation with power roller including all tools and plants and all other incidental charges etc., complete for formation of side berms in accordance with standard specification as per MORTH Vth Rev.,304 & 305

-

-

-

... More
Road A

1696

375748

221.55

... More
Road B

1580

350049

221.55

... More
Road C

1306

289344

221.55

... More
Provididing RCC M15 Grade Precast HM stone of standard desing as per IRC 8-1980 and fixing in position including painting and printing ect., complete (as per MORTH SPECIFICATION No.805)

-

-

-

... More
Road A

8

2048

256

... More
Road B

8

2048

256

... More
Road C

6

1536

256

... More
Providing RCC M15 grade precast KM stone of standard design as per IRC 8-1980 and fixing in position including painting and printing etc complete (as per MORT&H specification No.805).

-

-

-

... More
Road A

1

906

906

... More
Road B

1

906

906

... More
Road C

1

906

906

... More
Provision for Scheme Board Direction and Place Identification signs - Type IV. Providing and erecting Direction and place Identification Retro reflectorised sign made out of high Intensity Prismatic Grade sheeting confirming to type IV standards of IRC - 67: 2012 and ASTM D 4956-09. Specification and fixed over 2 mm thick Aluminium sheet fixed over a back supporting frame of 25mm x 25mm x 3mm Mild steel angel and supported on a mild steel angel post 75 X 75 X 6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painte as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cm X 45cm X 60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro Reflectro sheet shall consist of minimum co efficient of Retro - reflection as per Table 6.6 of IRC67-2012. The retro - reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67.2012. (as per MORT & H Specification No 801) (For Sign having area more than 0.95qm) TYPE -IV

-

-

-

... More
Road A

2.16

25498

11805

... More
Road B

2.16

25498

11805

... More
Road C

2.16

25498

11805

... More
SUB ESTIMATE - Box Culvert Dismantling the existing RR masonry in cement mortar upto 3.0 m height in the existing causeway and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the Departmental Officers including all labour and incidental charges etc., complete as per MORT&H Vth specification No.111, 112, 202.

-

-

-

... More
Road A - Km 0/6 & 0/10 - 2.Nos

36.88

9492

257.4

... More
Road A - Km 1/2

18.44

4746

257.4

... More
Road A - Km 1/6

18.44

4746

257.4

... More
Road C - Km 0/10 & 1/2 - 2.Nos

36.88

9492

257.4

... More
Dismantling the existing Cut Stone culvert and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete as per MORT&H Vth specification No.111, 112, 202.

-

-

-

... More
Road A - Km 0/6 & 0/10 - 2.Nos

13.2

6155

466.3

... More
Road A - Km 1/2

6.6

3077

466.3

... More
Road A - Km 1/6

6.6

3077

466.3

... More
Road C - Km 0/10 & 1/2 - 2.Nos

13.2

6155

466.3

... More
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT as per MORT&H Vth specification No.111,112,304.

-

-

-

... More
Road A - Km 0/6 & 0/10 - 2.Nos

122.96

33703

274.1

... More
Road A - Km 1/2

61.48

16851

274.1

... More
Road A - Km 1/6

69.05

18926

274.1

... More
Road C - Km 0/10 & 1/2 - 2.Nos

122.96

33703

274.1

... More
Plain Cement Concrete M-15 Grade, Nominal Mix, 1:2:4, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of form work, lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in depths and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for Leveling course for Box culvert as per MORT&H Vth specification No.1000, 1500, 1700, 2100, 2200.

-

-

-

... More
Road A - Km 0/6 & 0/10 - 2.Nos

9.56

56268

5885.79

... More
Road A - Km 1/2

4.78

28134

5885.79

... More
Road A - Km 1/6

4.78

28198

5899.24

... More
Road C - Km 0/10 & 1/2 - 2.Nos

9.56

55111

5764.78

... More
Vibrated Reinforced Cement Concrete M25 design mix using 20mm ISS size HBG graded metal including cost and conveyance of all materials to worksite including cost of cement at site including soft water, labour charges for mixing transporting, laying and curing concrete, etc., complete as per relevant standard specification for Base Slab, Cover Slab and Side walls excluding Cost of Steel for culvert as per MORT&H Vth specification No.1000, 1500, 1700, 2200, 2300.

-

-

-

... More
Road A - Km 0/6 & 0/10 - 2.Nos

58.56

661109

11289.43

... More
Road A - Km 1/2

29.28

330554

11289.43

... More
Road A - Km 1/6

29.28

330948

11302.87

... More
Road C - Km 0/10 & 1/2 - 2.Nos

58.56

654022

11168.41

... More
Vibrated Cement Concrete M20 nominal mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Stem of Wing Wall and Parapet over Box Culvert as per MORT&H Vth specification No.1000, 1500, 1700, 2200, 2300.

-

-

-

... More
Road A - Km 0/6 & 0/10 - 2.Nos

52.08

417107

8008.98

... More
Road A - Km 1/2

26.04

208553

8008.98

... More
Road A - Km 1/6

31.25

247982

7935.45

... More
Road C - Km 0/10 & 1/2 - 2.Nos

49.72

400838

8061.92

... More
Supply and fabrication of Fe.500D steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete as per MORT&H Vth specification No.1600

-

-

-

... More
Road A - Km 0/6 & 0/10 - 2.Nos

3.82

362152

94804.27

... More
Road A - Km 1/2

1.91

181076

94804.27

... More
Road A - Km 1/6

1.91

181076

94804.27

... More
Road C - Km 0/10 & 1/2 - 2.Nos

3.82

362152

94804.27

... More
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for mixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, formwork, cost of premoulded expansion joints and fixing the same in position etc., excluding steel complete for wearing coat of 75mm uniform thickness over deck slab as per MORT&H Rev. V Specification No.1000, 1500, 1700, 2702.

-

-

-

... More
Road A - Km 0/6 & 0/10 - 2.Nos

34.32

23980

698.73

... More
Road A - Km 1/2

17.16

11990

698.73

... More
Road A - Km 1/6

17.16

12007

699.76

... More
Road C - Km 0/10 & 1/2 - 2.Nos

34.32

23663

689.5

... More
Providing and fixing PVC seepage pipes of 100mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing, etc. complete to drain the backfill in between abutment and wings as per MORT&H Vth specification No.2706

-

-

-

... More
Road A - Km 0/6 & 0/10 - 2.Nos

16

2840

177.5

... More
Road A - Km 1/2

8

1420

177.5

... More
Road A - Km 1/6

8

1420

177.5

... More
Road C - Km 0/10 & 1/2 - 2.Nos

16

2840

177.5

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drain in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer using Carted Earth with a lead of 5km for formation of Diversion road for 100% compaction as per MORT&H Vth specification No.111, 112, 304, 305.

-

-

-

... More
Road A - Km 0/6 & 0/10 - 2.Nos

339.76

75273

221.55

... More
Road A - Km 1/2

169.88

37636

221.55

... More
Road A - Km 1/6

169.88

37636

221.55

... More
Road C - Km 0/10 & 1/2 - 2.Nos

339.76

75273

221.55

... More
Construction of granular sub - base Gr-V of 150 mm thick by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density for Diversion Road complete as per clause 401 (Specification Number as per MORT&H Rev.V 111,112,401,900).

-

-

-

... More
Road A - Km 0/6 & 0/10 - 2.Nos

33.75

50599

1499.23

... More
Road A - Km 1/2

16.88

25307

1499.23

... More
Road A - Km 1/6

16.88

25307

1499.23

... More
Road C - Km 0/10 & 1/2 - 2.Nos

33.75

49411

1464.03

... More
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including pre mixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery,fuel and all other incidental chargesfor Diversion road. (Specification Number as per MORT&H Rev.V 111,112,406,900).

-

-

-

... More
Road A - Km 0/6 & 0/10 - 2.Nos

33.75

61787

1830.73

... More
Road A - Km 1/2

16.88

30902

1830.73

... More
Road A - Km 1/6

16.88

30902

1830.73

... More
Road C - Km 0/10 & 1/2 - 2.Nos

33.75

61787

1830.73

... More
Retaining Wall: Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for for FOUNDATION OF RETAINING WALL as per clause No.304 of MORT&H Vth rev.

-

-

-

... More
Road A - Km 1/2-1/4

445.5

112310

252.1

... More
Road A - Km 1/6-1/8

405

102100

252.1

... More
Road B - Km 0/6

453.6

114352

252.1

... More
Road B - Km 0/8-0/10

572

144201

252.1

... More
Vibrated Cement concrete of Grade M-20, Nominal mix, 1:1.5:3, using 40mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost and labour charges for formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc, as per relevant standard specification for FOOTING OF RETAINING WALL as per clause 1000, 1500, 1700, 2200.

-

-

-

... More
Road A - Km 1/2-1/4

89.1

540793

6069.51

... More
Road A - Km 1/6-1/8

81

492718

6082.95

... More
Road B - Km 0/6

90.72

538286

5933.49

... More
Road B - Km 0/8-0/10

86

510279

5933.48

... More
Vibrated Cement concrete of grade M20 Nominal mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost and labour charges for formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc, as per relevant standard specification for STEM OF RETAINING WALL BELOW SILL as per clause No.1000, 1500, 1700, 2200 of MORT&H Vth rev.

-

-

-

... More
Road A - Km 1/2-1/4

229.68

1654770

7204.68

... More
Road A - Km 1/6-1/8

208.8

1507331

7219.02

... More
Road B - Km 0/6

233.86

1652697

7067.04

... More
Road B - Km 0/8-0/10

323

2203296

6821.35

... More
Vibrated Cement concrete of grade M20 Nominal mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost and labour charges for formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc, as per relevant standard specification for STEM OF RETAINING WALL ABOVE SILL as per clause No.1000, 1500, 1700, 2200 of MORT&H Vth rev.

-

-

-

... More
Road A - Km 1/2-1/4

150.15

1266636

8435.81

... More
Road A - Km 1/6-1/8

136.5

1153591

8451.22

... More
Road B - Km 0/6

152.88

1268761

8299.07

... More
Road B - Km 0/8-0/10

184

1458623

7927.3

... More
Providing and fixing of Seepage Pipes of 100mm dia. using PVC pipes of requied lengths for including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken granite metals at the periphery and labour charges for fixing, etc., to drain of the backfill in the RETAINING WALL as per clause No.2707 of MORT&H Vth rev.

-

-

-

... More
Road A - Km 1/2-1/4

50.05

8883

177.5

... More
Road A - Km 1/6-1/8

45.5

8076

177.5

... More
Road B - Km 0/6

50.96

9045

177.5

... More
Road B - Km 0/8-0/10

46

8165

177.5

... More
Vibrated Cement Concrete M15 nominal mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Broken Parapet Over RETAINING WALL as per clause No.1000, 1500, 1700, 2200 of MORT&H Vth rev

-

-

-

... More
Road A - Km 1/2-1/4

19.98

216523

10837.01

... More
Road A - Km 1/6-1/8

17.82

193355

10850.46

... More
Road B - Km 0/6

19.98

213791

10700.27

... More
Road B - Km 0/8-0/10

13

139103

10700.27

... More
WELL PROTECTION WALL: Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for for FOUNDATION OF WELL PROTECTIVE WALLS as per clause No.111, 112, 304 of MORT&H Vth rev.

-

-

-

... More
Road B - Km 0/10

27

6806

252.1

... More
Vibrated Cement concrete of Grade M-20, Nominal mix, 1:1.5:3, using 40mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost and labour charges for formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc, as per relevant standard specification for FOOTING OF WELL PROTECTIVE WALLS as per clause 1000, 1500, 1700, 2100, 2200.

-

-

-

... More
Road B - Km 0/10

8.1

48055

5932.77

... More
Vibrated Cement concrete of grade M20 Nominal mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost and labour charges for formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc, as per relevant standard specification for STEM OF WELL PROTECTIVE WALLS BELOW SILL as per clause No.1000, 1500, 1700, 2200 of MORT&H Vth rev.

-

-

-

... More
Road B - Km 0/10

10.82

85420

7894.64

... More
Vibrated Cement concrete of grade M20 Nominal mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost and labour charges for formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc, as per relevant standard specification for STEM OF WELL PROTECTIVE WALLS ABOVE SILL a as per clause No.1000, 1500, 1700, 2200 of MORT&H Vth rev.

-

-

-

... More
Road B - Km 0/10

7.8

72296

9268.8

... More
Providing and fixing of Seepage Pipes of 100mm dia. using PVC pipes of requied lengths for including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken granite metals at the periphery and labour charges for fixing, etc., to drain of the backfill in the Well Protective Walls as per clause No.2706 of MORT&H Vth rev.

-

-

-

... More
Road B - Km 0/10

5.2

923

177.5

... More
Vibrated Cement Concrete M20 nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Parapet Over Well Protective Walls as per clause No.1000, 1500, 1700, 2200, 2300 of MORT&H Vth rev

-

-

-

... More
Road B - Km 0/10

6.08

61007

10034.09

... More
CC DRAIN: Earthwork excavation in all classes of soil such as hard stiff clay, stiff black cotton soil, hard red earth, shales, muram, gravel, stone earth etc., depositing on bank with all leads and lifts as per SS 20 B and all other incidental charges such as baling out water, shoring, strutting, walling, and forming protective bund wherever necessary etc., complete as directed by the Engineer as per MORTH No. 111, 112, 304. for Foundation.

-

-

-

... More
Road B - Km 0/2

123.75

17331

140.05

... More
Cement Concrete M10 Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement, centering, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants employed and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications as directed by the Engineer for Foundation (Leveling Course Below Drain) as per MORTH No. 304 Rev.V

-

-

-

... More
Road B - Km 0/2

33

166645

5049.85

... More
Vibrated cement concrete M20(Nominal mix) using 20mm ISS graded hard granite broken metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but transporting, placing in position vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges such as bailing out of water, maintaining of protective bunds, cofferdams, shoring,structing etc, complete as per relevant standards specification for Base slab as per MORT&H Vth specification No.1000, 1500, 1700, 2200

-

-

-

... More
Road B - Km 0/2

33

213810

6479.12

... More
Vibrated cement concrete M20(Nominal mix) using 20mm ISS graded hard granite broken metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but transporting, placing in position vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges such as bailing out of water, maintaining of protective bunds, cofferdams, shoring,structing etc, complete as per relevant standards specification for SIDE WALLS of CC Drain. as per MORT&H Vth specification No.1000, 1500, 1700, 2200

-

-

-

... More
Road B - Km 0/2

41.25

565258

13703.23

... More
Vibrated Reinforced Cement concrete M25 Design mix with crushed stone aggregates 20 mm ISS size HGB metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but transporting, placing in position vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges maintaining of protective bunds, cofferdams, shoring,structing etc, complete as per relevant standards specification for Cover Slab of CC Drain. Clause 1000 & 1700 of MORT & H specification

-

-

-

... More
Road B - Km 0/2

3

38739

12913.13

... More
Supply and fabrication of Fe.500D steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete as per MOR&H Vth specification No.1600.

-

-

-

... More
Road B - Km 0/2

1.36

128933

94804.27

... More
Supply and fixing of Drain pipe along the DRAIN including cost of Pipe laying in position all incidental charges all laboour lift etc complete as per clause No.2707 of MORT&H Vth rev.

-

-

-

... More
Road B - Km 0/2

40

7100

177.5

... More
PAVER BLOCK: Construction of Granular Sub-Base Grade V of 200mm thick by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORT&H Rev 5 (Specification Number as per MORT&H Rev.V 111,112,401,900)

-

-

-

... More
Road B - Km 0/2

104

152259

1464.03

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 (Specification Number as per MORT&H Rev.V 111,112,406,900)

-

-

-

... More
Road B - Km 0/2

130

237994

1830.73

... More
Supplying and Filling with M-Sand Bed to the required thickness including cost and conveyance of all materials to site from any approved source satisfying the standard specifications and all labour charges for filling in layers compacting, ramming to obtain the maximum density by watering with all leads for water including all other incidental charges such as bailing out water if necessary forming protective bunds etc, complete for Bedding to Blocks.

-

-

-

... More
Road B - Km 0/2

15.6

22711

1455.87

... More
Supplying and laying of M40 grade rubber moulded Interlocking Concrete Paver Blocks of 80mm thick with skid resistant over facing surfaces and with appropriate bonds or patterns of laying blocks to the site, labour charges for loading and unloading, laying charges, vibrator plate compactor charges , joint filling charges and all other incidental charges as per IRC:SP:63 - 2018

-

-

-

... More
Road B - Km 0/2

520

418631

805.06

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items (excluding GST)

1

-

54548284.35

... More
GST 18% for above SubTotal Amount

1

9818691

9818691.18

... More
Total in Figures (SubTotal + GST)

-

64366975

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.