Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date10 Jan 2025
Closing Date12 Feb 2025
Tender Amount₹ 59,95,00,000 
Notes
Download

Costs

Summary

Construction Of Rob At Km 1/8 Of Namakkal Bypass Road Km 0/8-2/2 Incl. Railway Portion At Railway Km 47/5-6 In Between Kalangani And Namakkal Railway Stations

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Forming Embankment using carted earth as per SS20B including cost of all labour charges, materialsWith a lead of 16km conveyance charges tools, equipments and all incidental charges, including compacting with powerroller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification For embankment / sub grade-95% compaction.

-

-

-

... More
(i) Service Road

2023.2

-

-

... More
(ii) Approach Road

7536.15

-

-

... More
Forming /Construction of subgrade using carted earth as per SS20B including cost of all labour charges, materials with a lead of 16km conveyance charges tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification For embankment / sub grade-97% compaction.

-

-

-

... More
(i) Service Road

6070.7

-

-

... More
(ii) Approach Road

5364.87

-

-

... More
Providing FILTER MEDIA behind Retaining wall for 600mm thickness using filter material conforming to clause 309.3.2.B of MOST well packed with small size towards the soil and bigger size the wall including cost and conveyance to work site including all other incidental charges etc., complete.

-

-

-

... More
(ii) Approach Road

1274.06

-

-

... More
Main Work

129

-

-

... More
Providing Granular sub base by providing coarse graded materials of grading V IRC size HGB metal mixing in mechanical mix plant at OMC carrying the mix to the work site spreading in uniform layers with motor grader on prepared surface and compacting with vibratory roller to achieve the desired density complete as per clause 401 of MORT&H.

-

-

-

... More
(i) Service Road

1472.9

-

-

... More
(ii) Approach Road

1479.5

-

-

... More
Providing Granular sub base by providing coarse graded materials of grading III IRC size HGB metal mixing in mechanical mix plant at OMC carrying the mix to the work site spreading in uniform layers with motor grader on prepared surface and compacting with vibratory roller to achieve the desired density complete as per clause 401 of MORT&H.

-

-

-

... More
(i) Service Road

1052.1

-

-

... More
(ii) Approach Road

1138.1

-

-

... More
Providing and laying Wet Mix Macadam Base Course of 250mm thickness in two layers of 125mm each or else as specified on the prepared sub-Base with graded stone aggregate and granular materials of quality size and grading placed in layers as specified including mixing in Base mix plant,spreading in nuiform layer in motor grader and compacting with Vibrating Roller of 80 to 100kN static weight and ffine dressing for required grade and cross slope as shown on the drawing, equipment safety measures, testing and incidentals necessary to complete the work as per Technical Specification as per clause 406 of MORT&H-Vth revision and as directed by Engineer.

-

-

-

... More
(i) Service Road

2630.2

-

-

... More
(ii) Approach Road

2845.2

-

-

... More
Providing and laying Prime Coat over WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10sqm for preparatory to another bituminous construction overit,including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,complete as per Clause 502 of MORTH Rev-5

-

-

-

... More
(i) Service Road

10558

-

-

... More
(ii) Approach Road

11380.7

-

-

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion (RS1) per 10sqm fo rpreparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

-

-

-

... More
(i) Service Road

10558

-

-

... More
(ii) Approach Road

11380.7

-

-

... More
Tack coat over DLC: Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.30 kg/sqm on the prepared Concrete surface cleaned with mechanical broom as per clause 503) -

-

-

-

... More
(i) Service Road

41

-

-

... More
(ii) Approach Road

125.5

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

583

-

-

... More
Dense Graded Bituminous Macadam (Table - 500-10): Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by JMF by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No.111, 112, 501, 505 & 900 Grading-II.

-

-

-

... More
(i) Service Road

629.8

-

-

... More
Providing and laying 95mm compacted thick of Dense bituminous macadam using 0.35 cum of 37.5-13.2mm graded metal and 0.45 cum of 13.2-2.36mm graded metal and 9.20 cum of 2.36mm and below HBG metal 0.0240m3 quantity dust and 69kg of bitumen 60/70 grade for pre mixing per 10 sqm including cost and conveyance of all materials to CMP site including bitumen, heating the bitumen and aggregate to required temperature and mixing themin required temperature in central hot mix plant 20-30 tones capacity, conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness with mechanic paver to the specified grades and cross sections compaction by 8-10 power roller to the required density etc., including labour charges for loading bitumen into bitumen tank and metal to feeder unit, bour for attenting to paver site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, paver finisher, power roller and all other incidental charges etc., complete as per clause 505 of MORT&H-Vth revision.

-

-

-

... More
(ii) Approach Road

1081.2

-

-

... More
Providing and laying Bitumen concrete to 30mm using 0.13 cum of 19.00-9.5mm, 0.217cum of 9.50-2.36mm and 0.26cum of 2.36mm and below and with 50.30kgs of VG 30 bitumen for premixing per 10sqm including cost and conveyance of all matreials to CMP site, heating the bitumen and aggregate to requied temperature and mixing them in required temperature in central hot mix palnt 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 540mm with mechanical paver to the specified grades and cross sections and consolidate mby 8-10 tonne vibratory/ pneumatic roller to the required density etc,. including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver Finisher/ 9m paver finisher, Vibratory / Pneumatic rollers and all other tools and palnt required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORT&H-Vth revision.

-

-

-

... More
(i) Service Road

316.8

-

-

... More
Providing and laying Bitumen concrete to 40mm using 0.13 cum of 19.00-9.5mm, 0.217cum of 9.50-2.36mm and 0.26cum of 2.36mm and below and with 50.30kgs of VG 40 bitumen for premixing per 10sqm including cost and conveyance of all matreials to CMP site, heating the bitumen and aggregate to requied temperature and mixing them in required temperature in central hot mix palnt 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 540mm with mechanical paver to the specified grades and cross sections and consolidate mby 8-10 tonne vibratory/ pneumatic roller to the required density etc,. including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver Finisher/ 9m paver finisher, Vibratory / Pneumatic rollers and all other tools and palnt required, including fuel and all other incidental charges etc., complete as per specification using CMPas per clause 507 of MORT&H-Vth revision.

-

-

-

... More
(ii) Approach Road

455.3

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

23.32

-

-

... More
Providing and laying Bitumen concrete to 50mm using 0.22 cum of 26.5-13.20mm, 0.24cum of 13.2-2.36 mm and 0.26cum of 2.36mm and below and with 50.30 kgs of VG 30 bitumen for premixing per 10sqm including cost and conveyance of all matreials to CMP site, heating the bitumen and aggregate to requied temperature and mixing them in required temperature in central hot mix palnt 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 540mm with mechanical paver to the specified grades and cross sections and consolidate mby 8-10 tonne vibratory/ pneumatic roller to the required density etc,. including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver Finisher/ 9m paver finisher, Vibratory / Pneumatic rollers and all other tools and palnt required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORT&H-Vth revision.

-

-

-

... More
(i) Service Road

2.1

-

-

... More
(ii) Approach Road

6.3

-

-

... More
Plain Cement Concrete M 15 (Nominal Mix) using 40mm ISS HBG metal, including cost and conveyance of all materials to site and cost of cement at site, including all labour charges for mixing concrete, laying, hire charges for Tools and Plants, compacting, curing with all leads for soft water, including all other incidental charges, form work etc., Complete for Surface Drain as per Section 1500, 1704.3 & 2704 of MORTH Specification ( Fifth Revision)

-

-

-

... More
(i) Service Road

56.8

-

-

... More
Earth work excavation in all classes of soils except hard rock and depositing on bank, with initial leads and lifts as per SS 20B,Including cost of all labour, equipments and all incidental charges back filling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for FOUNDATION OF ABUTMENT, PIERS AND RETAINING WALLS. as per section 300 of MORTH Specification - Fifth revision including 600mm from the face of the footing as per Cl.4.2.5.1 of IS :1200 Part-1-1992.

-

-

-

... More
(a) Upto 2.00m Height

7370

-

-

... More
(b) Upto 2.00m - 3.00m Height

906

-

-

... More
(c) Upto 3.00m - 4.00m Height

42

-

-

... More
Earthwork excavation in Kankar / Soft disintegrated rock not requiring blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENT,PIERS AND RETAINING WALLS. as per section 300 of MORTH Specification - Fifth revision as per Cl.4.2.5.1 of IS :1200 Part-1-1992.

-

-

-

... More
(a) Upto 2.00m Height

1605

-

-

... More
(b) Upto 2.00m - 3.00m Height

1355

-

-

... More
(c) Upto 3.00m - 4.00m Height

202

-

-

... More
Earth work excavation in hard rock requiring blasting and depositing on bank with initial leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges, backfilling and clearing the site and disposal of all surplus materials etc., complete for FOUNDATION OF ABUTMENT and PIERS as per Section 300 of MoRT&H Specifications (V Revision).

81

-

-

... More
Benching of hard rock a average 10cm depth , cleaning of any loose materials and levelleing with a layer of concrete of same grade as that of foundation to provide an even surface including labour etc complete as per relavant standard spevification for foundation of ABUTMENT and PIER as per section 2100 of MORTH Specification - Fifth revision.

151

-

-

... More
Compacted Cement concrete M10 ( Nominal mix ) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, Tools and Plants and incidential charges etc., complete as per relevant standard specification for LEVELLING COURSE BELOW FOUNDATION OF ABUTMENT AND PIERS as per Section 2101.3 of MORTH Specification. (Fifth revision).

349

-

-

... More
Vibrated Reinforced Cement Concrete of grade M 35 (Design Mix) using 20mm ISS HBG grded metal including cost and conveyance of all materials to site and also including cost of formwork, softwater, labour charges for mixing, transporting, laying, and curing concrete working depths and hire charges for Tools and Plants including all other incidental charges etc., complete for FOOTING FOR ABUTMENTS AND RETAINING WALL as per section 1500,1700 & 2100 of MORTH Specificatio (Fifth Revision).

1401

-

-

... More
Vibrated Reinforced Cement Concrete of grade M 40 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials and cost of cement to site but excluding cost and fabrication of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths hire charges for Tools and Plants including all other incidental charges, etc. complete, for FOOTING UNDER PIERS as per Section 1100, 1500 & 1700 of MoRT&H Specifications. (V Revision).

1627

-

-

... More
Compacted Plain Cement concrete M15 (Nominal mix ) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, Tools and Plants and incidential charges etc., complete as per relevant standard specification for Filling the trenches around Footing upto Top of Rock Level as per section 2101.3 of MORTH Specification ( Fifth Revision).

4

-

-

... More
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and also including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, and hire charges for Tools and Plants including all other incidental charges, etc. complete,for RETAINING WALL STEM as per Section 1500, 1700 & 2200 of MoRT&H Specifications (V Revision).

1375

-

-

... More
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and also including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, and hire charges for Tools and Plants including all other incidental charges, etc.,complete, for SUBSTRUCTURE OF ABUTMENT and RETURNS as per Section 1500, 1700 & 2200 of MoRT&H Specifications (V Revision).

196

-

-

... More
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials and cost of cement to site but excluding cost and fabrication of steel but including soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for Tools and Plants including all other incidental charges, etc.,complete, for BED BLOCK CUM DIRT WALL AND PEDESTRAL OVER ABUTMENTS as per Section 1500, 1700 & 2200 of MoRT&H Specifications (V Revision).

31

-

-

... More
Vibrated Reinforced Cement Concrete of grade M 40 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials and cost of cement to site but excluding cost and fabrication of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for Tools and Plants including all other incidental charges, etc.,complete, for PIERS - 2000 mm dia as per Section 1500, 1700 & 2200 of MoRT&H Specifications (V Revision).

425

-

-

... More
Vibrated Reinforced Cement Concrete of grade M 40 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials and cost of cement to site but excluding cost and fabrication of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for Tools and Plants including all other incidental charges, etc.,complete, for CAPPING BEAM AND PEDESTRAL OVER PIERS as per Section 1500, 1700 & 2200 of MoRT&H Specifications. (V Revision).

454

-

-

... More
Providing and Fixing of ELASTOMERIC BEARING of size 630 x 520 x 160 mm including cost and conveyance to work site, labour for fixing the bearing in position and all other incidental charges etc., complete as per Section 2000 of MoRT&H Specifications (V Revision) and IRC: 83 - 2015 (Part - II).

4612608

-

-

... More
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing transporting, laying, curing concrete, vibration charges,working at at heights , soft water and hire chargesfor tools and plants, including all other incidental charges etc, complete for T-BEAMS and CROSS BEAMS as per Section 1500, 1700 & 2300 of MoRT&H Specifications. (V Revision).

2808

-

-

... More
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site,but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, working at heights, soft water, hire charges for tools and plants, including all other incidental charges, etc., complete for DECK SLAB as per Sections 1500,1700 & 2300 of MoRT&H Specifications (V Revision).

1890.9

-

-

... More
Vibrated Reinforced Cement Concrete M40 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying, curing concrete, working at heights, soft water, hire charges for Tools and Plants, including all other incidental charges, etc., complete for CRASH BARRIER as per Sections 811, 1700 & 2703.3 of MoRT&H Specifications (V Revision) for Main Work and Railway Portion.

-

-

-

... More
Main Work

604

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

59

-

-

... More
Providing and fixing of G.I DRAINAGE SPOUTS 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance of Galvanised iron pipes and flats and fixing them in position, etc, complete as per Section 2705 of MoRT&H Specifications (V Revision) for Main Work and Railway Portion.

-

-

-

... More
Main Work

264

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

22

-

-

... More
Supplying and installation of STRIP SEAL EXPANSION joint system confirming to specifications for road and bridge works published by Ministry of Surface Transport (Road Wing) in the 40mm wide expansion gap provided in between decks over piers and in between deck and diry wall over abutment with fatigue tested structural steel section at the nosing and anchorage assembly, including labour, equipment and incidental charges for fixing the joints complete in all respects, as per Section 2600 of MoRT&H Specifications (V Revision).

288

-

-

... More
Vibrated Cement Concrete M15 (Nominal mix ) using 40mm ISS HBG metal , including cost and conveyance of all materials to site and cost of cement at site,including all lablour charges for mixing Concrete, laying, hire charges for Tools and plants , compacting, curing with all leads for soft water, including all other incidental charges, form work etc., complete, for BASE COURSE BELOW APPROACH SLAB as per Sections 1500, 1700 & 2704 of MoRT&H Specifications (V Revision).

11

-

-

... More
Vibrated reinforced Cement Concrete M30 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including labour charges for mixing , laying, curing concrete, working at heights, soft water, hire charges for Tools and Plants, including all other incidental charges, etc., complete for APPROACH SLAB as per Sections 1500, 1700 & 2704 of MoRT&H Specifications (V Revision).

24

-

-

... More
Vibrated cement concrete M30 (Design mix) using 25mm,12mm, 6mm ISS HBG Metal, including cost and conveyance of all materials to work site including all leads for softwater, including all other incidental charges formwork, cost of premoulded expansion joints and fixing the same in position etc, complete, for WEARING COAT OVER DECK SLAB AND APPROACH SLAB as per Section 2702.2 of MoRT&H Specifications (V Revision).

7330

-

-

... More
Providing Weep Holes with CLASS I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing , etc., complete to drain the backfill as per Section 2706 of MoRT&H Specifications (V Revision) for Main Work and Drain.

-

-

-

... More
Main Work

553

-

-

... More
(v) Construction of Storm Water Drain at Km 0/8-2/2.

45

-

-

... More
Filling behind Abutments and Returns as per Appendix 6 of IRC: 78- 2014 with clean gritty free draining material including cost and draining material having PHI value more than 35° conveyance of material to worksite , laying, handling charges and filling in layers tamping under optimum moisture content to get the maximum density, including watering, with all leads and lifts for water and all other incidental charges, etc., complete as per Cl 710.1.4 & Appendix 6 of IRC 78- 2014.

330

-

-

... More
Supply and fabrication of Fe-500 D steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening,cutting,bending,tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges, etc., complete as per Section 2706 of MoRT&H Specifications (V Revision) for Main Work, Box Culvert, Drain and Railway Portion.

-

-

-

... More
Main Work

1158

-

-

... More
(iii) Construction of Box Culvert at Km 1/2, 1/4, 2/2 and ODR Culvert.

21.46

-

-

... More
(v) Construction of Storm Water Drain at Km 0/8-2/2.

92.36

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

174

-

-

... More
Supply and fabrication of Fe-240 steel required in the schedule including cost of steel at site cost of providing and cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills including lapping to the required length wherever necessary and providing to the reinforcement, placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc complete, as per Section 2706 of MoRT&H Specifications (V Revision) For Main Work.

47

-

-

... More
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT AND WING WALL, PIER PROTECTICE WALL, DRAIN AND DECK DRAINAGE.

-

-

-

... More
(iii) Construction of Box Culvert at Km 1/2, 1/4, 2/2 and ODR Culvert.

626.2

-

-

... More
(iv) Providing Pier Protection.

239.5

-

-

... More
(v) Construction of Storm Water Drain at Km 0/8-2/2.

728

-

-

... More
(vi) Providing Deck Drainage.

39.8

-

-

... More
Plain Cement Concrete of grade M10 (Nominal Mix), using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including all labour charges for mixing, transporting, laying, and curing concrete, working at heights, and hire charges for tools and plants, andwith all leads for potable water including all other incidental charges, formwork etc., complete for BASE COURSE BELOW FOUNDATION FOR BOX CULVERT, DRAIN as per section 1500, 1700 & 2704 of MORT&H Specifications (Fifth Revision).

-

-

-

... More
(iii) Construction of Box Culvert at Km 1/2, 1/4, 2/2 and ODR Culvert.

50.6

-

-

... More
(v) Construction of Storm Water Drain at Km 0/8-2/2.

188

-

-

... More
Vibrated Reinforced cement concrete of grade M25 (design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel including cost of form work, labour charges for mixing, transporting, laying, curing concrete, potable water, working at heights, hire charges for tools and plants, including all other incidental charges etc., complete for Approach Slab as per section 1500, 1700 & 2704 of MORT&H Specifications (Fifth Revision) for BASE SLAB, SIDE AND TOP WALLS OF BOX CULVERT, DRAIN.

-

-

-

... More
(iii) Construction of Box Culvert at Km 1/2, 1/4, 2/2 and ODR Culvert.

345.2

-

-

... More
(v) Construction of Storm Water Drain at Km 0/8-2/2.

1531.9

-

-

... More
Vibrated Cement concrete grade M20 Nominal Mix 1:1.5:3 using 40mm size ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for footing of Wing wall, Pier Protective wall.

-

-

-

... More
(iii) Construction of Box Culvert at Km 1/2, 1/4, 2/2 and ODR Culvert.

19.1

-

-

... More
(iv) Providing Pier Protection.

296.7

-

-

... More
Vibrated Cement concrete grade M20 Nominal Mix 1:1.5:3 using 40mm size ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for stem of Wing wall, Pier Protective wall. (below sill).

-

-

-

... More
(iii) Construction of Box Culvert at Km 1/2, 1/4, 2/2 and ODR Culvert.

32.2

-

-

... More
(iv) Providing Pier Protection.

412

-

-

... More
Vibrated Cement concrete grade M20 Nominal Mix 1:1.5:3 using 40mm size ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for stem of Wing wall, Pier Protective wall. (above sill).

-

-

-

... More
(iii) Construction of Box Culvert at Km 1/2, 1/4, 2/2 and ODR Culvert.

26.4

-

-

... More
(iv) Providing Pier Protection.

159.6

-

-

... More
Vibrated Cement concrete grade M15 Nominal Mix 1:2:4 using 40mm size ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BROKEN PARAPETS.

-

-

-

... More
(iii) Construction of Box Culvert at Km 1/2, 1/4, 2/2 and ODR Culvert.

4.2

-

-

... More
Providing Barrier Type Kerb for median / islands using vibrated cement concrete of grade M20 (1:1.5:3) Nominal mix using 20 and 12mm ISS HBG metal from approved quarry, including cost and conveyance of all materials to worksite, including hire and fuel charges of all the machineries employed for this work, including all labour charges for mixing, laying, curing, painting, including all other incidental charges etc.,complete as per drawing and standard specification.

-

-

-

... More
(iv) Providing Pier Protection.

525.3

-

-

... More
Supply and fixing of SFRC Man hole Cover 750mm x 750mm with Frame as per IS 12592:2002 and as directed by the Departmental Officers for fixing at every interval on Top slab of drain including all incidental charges etc., complete for Drain.

-

-

-

... More
(v) Construction of Storm Water Drain at Km 0/8-2/2.

71

-

-

... More
Providing and fixing 160mm dia PVC pipes of approved class not less than 4 kg/m2 connecting the drainage spouts of the deck slab along both sides of the deck slab connected to the Rainwater harvesting system below every third span with all bends tees clamps and all other accessories and fixures complete including tools and plants, transporation etc.,

-

-

-

... More
(vi) Providing Deck Drainage.

1608

-

-

... More
Filling with M Sand including cost and conveyance of all materials and stacking at site to departmental guage for premeasurements, labour charges for laying, handling and filling in layers not more than 15 cm thick including watering with all leads for good soft water and all other incidental charges, tamping, compacting under optimum moisture content to get the maximum density for the pit and Rain water harvesting well.

-

-

-

... More
(vi) Providing Deck Drainage.

5.1

-

-

... More
Filling with 40mm size ISS HBG metal in the rain water harvesting system including cost and conveyance of all material and labour charges for filling complete as directed by the engineer in charge.

-

-

-

... More
(vi) Providing Deck Drainage.

5.1

-

-

... More
Filling with 20mm size ISS HBG metal in the rain water harvesting system including cost and conveyance of all material and labour charges for filling complete as directed by the engineer in charge.

-

-

-

... More
(vi) Providing Deck Drainage.

5.1

-

-

... More
Filling with 12mm size ISS HBG metal in the rain water harvesting system including cost and conveyance of all material and labour charges for filling complete as directed by the engineer in charge.

-

-

-

... More
(vi) Providing Deck Drainage.

5.1

-

-

... More
Filling with 6mm size ISS HBG metal in the rain water harvesting system including cost and conveyance of all material and labour charges for filling complete as directed by the engineer in charge.

-

-

-

... More
(vi) Providing Deck Drainage.

5.1

-

-

... More
Providing and laying of ISI Class NP 3 pipe of best quality of 1200mm dia. in the rain water harvesting system with all required specials including cost and conveyance of pipes and specials, labour charges for in position and all other incidental charges etc., complete for pipes as directed by the Engineer.

-

-

-

... More
(vi) Providing Deck Drainage.

22.5

-

-

... More
Earthwork excavation in all classes of ORDINARY SOIL except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF UNDER ABUTMENTS AND PIERS FOR OPEN & PILE CAP as per section 300 of MORTH specification (V Revision) and Is 1200:1992 Part 1 (IV Revision).

-

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion. (Height upto 2m)

94.3

-

-

... More
Earthwork excavation in Kankar / Soft disintegrated rock not requiring blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENT,PIERS AND RETAINING WALLS. as per section 300 of MORTH Specification - Fifth revision as per Cl.4.2.5.1 of IS :1200 Part-1-1992.

-

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

-

-

-

... More
(a) Height Upto 2m

222

-

-

... More
(b) Height between 2m - 3m

146.8

-

-

... More
(c) Height between 3m - 4m

66

-

-

... More
Earth work excavation in rock requiring blasting (Hard rock) and depositing on bank with initial leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges, backfilling and clearing the site and disposal of all surplus materials etc., complete for FOUNDATION OF ABUTMENT and PIERS as per Section 300 of MoRT&H Specifications (V Revision).

-

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

112.5

-

-

... More
Providing Dowel Bars in foundation using bars not less than 25mm dia in 40mm holes for the required depth and grouting in cement mortar including cost and conveyance of all cost and conveyance of all materials to site including the all other labour and incidental charges including the cost of the drilling and all other tools and plants employed etc., complete as per standard specifications for FOUNDATION OF PIERS.

-

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

600

-

-

... More
Plain Cement Concrete M10 (Nominal Mix) using 40mm ISS HBG metalincluding cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for LEVELLING COURSE BELOW PIERS.

-

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

15.9

-

-

... More
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for FOOTING OF PIER.

-

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

225

-

-

... More
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for COLUMN (BELOW GROUND LEVEL).

-

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

26.1

-

-

... More
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for COLUMN (ABOVE GROUND LEVEL).

-

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

104.7

-

-

... More
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for CAPPING BEAM OVER PIER as per section 1500 ,1700 and 2200 of MORT@H specifications (V Revisions).

-

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

122.6

-

-

... More
Vibrated Reinforced Cement Concrete M40 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for PEDESTAL OVER PIERS as per section 1500 ,1700 and 2200.

-

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

2.5

-

-

... More
Supplying, fabricating and erection of ISMC steel channel as per the detailed drawing and Technical specifications for Bearing Inspection Platform.

-

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

0.3

-

-

... More
Supplying, fixing and erection of GI pipes 40NB as per the detailed drawing and Technical specifications for Inspection Platform.

-

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

472.8

-

-

... More
Providing, supplying, fitting and fixing in position true to line and level VERSIFLX (TM) sliding plate bearing with PTFE surface sliding on stainless steel complete including all accessories as per drawings and BS: 5400, section 9.1 & 9.2 (for PTFE) a including cost of all material, labour, HOM of machineries complete as per Specification. MOST Specifications No. 2000.

-

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

-

-

-

... More
(a) Fixed Bearing

2

-

-

... More
(b) Longitudial Guided Bearing

2

-

-

... More
(c) Transverse Guided Bearing

3

-

-

... More
(d) Free Bearing

3

-

-

... More
Vibrated Reinforced Cement Concrete M40 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges,including inspection chamber, inclusive of 150mm ducts and other accessories of footpath etc., complete for DECK SLAB as per section 1500 ,1700 and 2300 of MORT@H specifications (V Revisions).

-

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

171.3

-

-

... More
Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting the requirements given in table 500-39, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated finegrained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces is not less than 1000C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 516.

-

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

583

-

-

... More
Supplying, fabrication, assembling of all types of steel girders of specified spans with structural steel conforming to Quality "B0" Grade Designation E350 conforming to IS:2062, erection/ slewing/ end launching of steel girders with cranes or any other approved launching methods as per site conditions (not requiring traffic block) on sub-structure including provision of trolley refuges etc., complete as per approved QAP and drawings conforming to IRS-B1-2001 and other relevant codes and specifications. Note: 1. Detailed fabrication and erection drawings & launching methodology will be prepared by the contractor and got approved from Railway. 2. The rate is all inclusive including launching in position, complete in all respect, except cost of (i) painting / Metalising; (ii) Bearings & (iii) HSFG Bolts which shall be paid extra under relevant item. 3) The payment shall be made on the theoretical weight of main components and gusset plates only.

-

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

450

-

-

... More
Painting two coat with ready mixed plastic emulsion paint and approved priming coat over the cement surface complete including scrapping clean removal of dirt parts for crash barrier, safety kerb, hand rails, bridge bottom sides, deck slab bottom, abutment , return walls and retaining wall sides with approved quality and colour including cost and converance of all materials to site , labour charges etc. complete as per standard specifications.

-

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

1854.8

-

-

... More
Supplying and fixing HSFG Bolts, of any dia and any length with suitable nuts including DTI washers conforming to IRS-B1-2001 for Bridges and steel Structures with Contractors, labours, tools and plants and lead and lift etc., complete.

-

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

12409

-

-

... More
Metallizing of steel work of Girders with sprayed aluminium after surface preparation by sand/ grit blasting followed by one coat of etch primer (IS:5666) & one coat of zinc chrome primer(IS:104) and two coats of aluminium paint(IS:2339) with all labour, T &P and material as a complete job duly confirming to all relevant specifications and process given under Clause 39 of IRS -B1-2001. Note: Nominal thickness of sprayed aluminium coating shall be 150 microns. DFT of zinc chrome, primer shall be 25-30 microns and DFT of each coat of aluminium paint shall be 12-14 microns.

-

-

-

... More
(vii) Construction of Substructure and Super Structure in Railway Portion.

2637

-

-

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items

1

-

-

... More
GST 18% for the above SubTotal Amount

1

-

-

... More
Total in Figures (SubTotal + GST)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.