National Bank For Agriculture And Rural Development Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Civil And Construction
Road Construction
Eprocure
Opening Date2 Jan 2023
Closing Date31 Jan 2023
Tender Amount₹ 5,80,85,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam of required thickness specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Rev-5.

3847.4

7411631

1926.4

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 502 & 900 of MORTH Rev-5.

16139.4

1242895

77.01

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 503 & 900 of MORTH Rev-5.

16139.4

292768

18.14

... More
Providing and laying Tack Coat over Dry lean cement concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 503 & 900 of MORTH Rev-5.

52.8

1097

20.79

... More
Providing and laying 50mm thick Consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20mm 0.430cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below IRC metal with 37 kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plants required, including all other and incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 504 & 900 of MORTH Rev-5.

809.8

6934770

8563.56

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50 - 2.36mm and 0.26 cum of 2.36mm and below with 50.30 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10t Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, Paver finisher, Vibratory roller and all other tools and plants required, including all other and incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 507 & 900 of MORTH Rev-5.

485.8

5532436

11388.3

... More
Providing and laying earth for making up berms using Carted earth with a lead of 4 Km including Labour charges for spreading, hire and fuel charges for all T & P employed etc., complete as directed by the departmental officers as per clause 111, 112, 202, 301, 302, 303, 305 & 900 of MORT&H Specification (Fifth Revision).

4320

922060

213.44

... More
Providing RCC M15 grade precast KM stone of standard design as per IRC 8 -1980 and fixing in position including painting and printing etc., complete (as per MORTH & H specification no 804).

4

3624

906

... More
Providing RCC M15 grade precast HM stone of standard design as per IRC 26 -1967 and fixing in position including painting and printing etc., complete (as per MORTH & H specification no 804).

17

4352

256

... More
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per clause 111, 112 & 304 of MORT&H V Revision for FOUNDATION OF BOX CULVERT AND PROTECTIVE WORKS.

-

-

-

... More
i) Construction of Box Culvert 1x1 at Km 1/8 (2 Nos), 2/2, 2/8, 3/4 & 4/2.

503.5

106993

212.5

... More
ii) Construction of Protective works

494.3

105038

212.5

... More
Plain Cement concrete grade M15 Nominal Mix 1:2:4 using 40mm size ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for LEVELING COURSE UNDER THE BASE SLAB OF BOX CULVERT.

-

-

-

... More
i) Construction of Box Culvert 1x1 at Km 1/8 (2 Nos), 2/2, 2/8, 3/4 & 4/2.

19.8

110636

5587.69

... More
Vibrated Reinforced cement concrete of grade M25 (design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel including cost of form work, labour charges for mixing, transporting, laying, curing concrete, potable water, working at heights, hire charges for tools and plants, including all other incidental charges etc., complete for Approach Slab as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for BASE SLAB, SIDE AND TOP SLAB OF BOX CULVERT.

-

-

-

... More
i) Construction of Box Culvert 1x1 at Km 1/8 (2 Nos), 2/2, 2/8, 3/4 & 4/2.

104.2

1112822

10679.68

... More
Supply and fabrication of Fe-500D grade Steel required for all RCC items of works involved in the schedule cost of steel at site and cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete as per section 1600 of MORT&H Specifications (Fifth Revision) for BOX CULVERT, BRIDGE AND SLAB CULVERT.

-

-

-

... More
i) Construction of Box Culvert 1x1 at Km 1/8 (2 Nos), 2/2, 2/8, 3/4 & 4/2.

7.99

744907

93230

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

6.96

648880

93230

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

6.96

648880

93230

... More
iv) Construction of Slab Culvert at Km 2/4.

9.45

881023

93230

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for FOOTING OF PROTECTIVE WORKS AND WING WALL BOX CULVERT. (BELOW SILL).

-

-

-

... More
i) Construction of Box Culvert 1x1 at Km 1/8 (2 Nos), 2/2, 2/8, 3/4 & 4/2.

72.6

418703

5767.27

... More
ii) Construction of Protective works

114.5

660067

5764.78

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for STEM OF PROTECTIVE WORKS AND WING WALL BOX CULVERT. (BELOW SILL).

-

-

-

... More
i) Construction of Box Culvert 1x1 at Km 1/8 (2 Nos), 2/2, 2/8, 3/4 & 4/2.

109.9

875031

7962.07

... More
ii) Construction of Protective works

236.7

1681999

7106.04

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for STEM OF PROTECTIVE WORKS AND WING WALL BOX CULVERT. (ABOVE SILL).

-

-

-

... More
i) Construction of Box Culvert 1x1 at Km 1/8 (2 Nos), 2/2, 2/8, 3/4 & 4/2.

78.6

788305

10029.33

... More
ii) Construction of Protective works

179.1

1635457

9131.53

... More
Vibrated Cement Concrete M15 grade Nominal Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specification, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) FOR PARAPET OF BOX CULVERT AND PROTECTIVE WORKS.

-

-

-

... More
i) Construction of Box Culvert 1x1 at Km 1/8 (2 Nos), 2/2, 2/8, 3/4 & 4/2.

19.6

207000

10561.25

... More
ii) Construction of Protective works

16.7

174309

10437.69

... More
Refilling the excavated earth including conveyance of all materials to work site, including labour charges for filling in layers compacting by power roller under optimum moisture content to get maximum density of layers including all incidental charges etc, complete for forming embankment as per clause 305, 2907 of MORT&H Specification (Fifth Revision) FOR BOX CULVET AND PROTECTIVE WORKS. (Labour Charges only).

-

-

-

... More
i) Construction of Box Culvert 1x1 at Km 1/8 (2 Nos), 2/2, 2/8, 3/4 & 4/2.

356.9

16574

46.44

... More
ii) Construction of Protective works

494.3

22955

46.44

... More
Providing and fixing PVC seepage pipes of 100mm dia. PVC pipes of requied lengths including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc., complete as per clause 2700 of MORT&H Specification (Fifth Revision) to drain of the backfill in between the BRIDGE, PROTECTIVE WORKS AND SLAB CULVERT.

-

-

-

... More
ii) Construction of Protective works

99.3

17625

177.5

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

69

12247

177.5

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

69

12247

177.5

... More
iv) Construction of Slab Culvert at Km 2/4.

50.8

9017

177.5

... More
Filling behind Retaining wall with Carted earth including cost and conveyance of earth to worksite, laying, handling charges and filling in layers including compacting with power roller to get the maximum density including watering and all other incidental charges etc, complete as per clause 305, 2907 of MORT&H Specification (Fifth Revision) for PROTECTIVE WORKS.

-

-

-

... More
ii) Construction of Protective works

136.9

25638

187.28

... More
Dismantling the existing Cement Concrete in the existing Bridge and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete as per clause 111, 112 & 202 of MORT&H specification (Fifth Revision)

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

78

32682

419

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

78

32682

419

... More
iv) Construction of Slab Culvert at Km 2/4.

29.4

12318

419

... More
Dismantling the existing RCC Slab Culvert in the existing Bridge and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete as per clause 111, 112 & 202 of MORT&H specification (Fifth Revision)

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

24

87648

3652

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

24

87648

3652

... More
iv) Construction of Slab Culvert at Km 2/4.

13.65

49849

3652

... More
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per clause 304 of MORT&H V Revision for DRESSING THE BED UPTO SILL LEVEL.

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

228.9

24320

106.25

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

228.9

24320

106.25

... More
iv) Construction of Slab Culvert at Km 2/4.

119

12643

106.25

... More
Earthwork excavation in all classes of soil except soft disintegrated rock and hard rock not requiring blasting and and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per clause 304 of MORT&H V Revision for FOUNDATION OF ABUTMENTS, PIERS & WINGS.

-

-

-

... More
iv) Construction of Slab Culvert at Km 2/4.

73.4

15138

206.25

... More
Earthwork excavation in soft disintegrated rock not requiring blasting except medium rock and hard rock requiring blasting and and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per clause 304 of MORT&H V Revision for FOUNDATION OF ABUTMENTS, PIERS & WINGS.

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

502.7

129797

258.2

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

375.6

96979

258.2

... More
iv) Construction of Slab Culvert at Km 2/4.

102.7

26517

258.2

... More
Earthwork excavation in soft rock requiring blasting except hard rock requiring blasting and and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per clause 304 of MORT&H V Revision for FOUNDATION OF ABUTMENTS, PIERS & WINGS.

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

21.7

18748

864

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

180.6

156038

864

... More
Plain Cement concrete grade M15 Nominal Mix, using 40mm size ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700,2100 & 2704 of MORT&H Specification (Fifth Revision) for LEVELING COURSE UNDER FOOTINGS.

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

14.5

80753

5569.21

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

14.5

81201

5600.13

... More
iv) Construction of Slab Culvert at Km 2/4.

14.7

82535

5614.67

... More
Vibrated Cement concrete grade M20 Nominal Mix, using 40mm size ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700,2100 & 2704 of MORT&H Specification (Fifth Revision) for FOOTINGS OF ABUTMENT, PIERS AND WINGS. (BELOW SILL LEVEL).

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

273.5

1740731

6364.65

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

273.5

1749185

6395.56

... More
iv) Construction of Slab Culvert at Km 2/4.

138.1

895295

6482.95

... More
Vibrated Cement concrete grade M20 Nominal Mix, using 40mm size ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700,2100 & 2704 of MORT&H Specification (Fifth Revision) for SUBSTRUCTURE OF ABUTMENTS, PIERS AND WINGS. (ABOVE SILL LEVEL).

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

100

769148

7691.48

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

100

772240

7722.4

... More
iv) Construction of Slab Culvert at Km 2/4.

77.5

605632

7814.61

... More
Vibrated Reinforced Cement concrete grade M30 Design mix, using ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700,2100 & 2704 of MORT&H Specification (Fifth Revision) for DIRT WALL CUM BED BLOCK OVER ABUTMENTS AND BED BLOCK OVER PIERS.

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

5.3

66374

12523.49

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

5.3

66538

12554.4

... More
iv) Construction of Slab Culvert at Km 2/4.

5.9

69483

11776.93

... More
Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to work site, labour charges for fixing the same in the correct position and all other incidental charges et., complete.

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

8.9

890

100

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

8.9

890

100

... More
iv) Construction of Slab Culvert at Km 2/4.

12.6

1260

100

... More
Vibrated Reinforced Cement concrete grade M30 Design mix, using ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700,2100 & 2704 of MORT&H Specification (Fifth Revision) for DECK SLAB.

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

66.9

767768

11476.36

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

66.9

769836

11507.27

... More
iv) Construction of Slab Culvert at Km 2/4.

42

527105

12550.14

... More
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges " Fifth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete.

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

44.1

46289

1049.65

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

44.1

47299

1072.55

... More
iv) Construction of Slab Culvert at Km 2/4.

34.7

36820

1061.1

... More
Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of earth to worksite, laying, handling charges and filling in layers including compacting with power roller to get the maximum density including watering and all other incidental charges etc, complete as per clause 305, 2907 of MORT&H Specification (Fifth Revision).

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

85

26227

308.56

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

85

26227

308.56

... More
iv) Construction of Slab Culvert at Km 2/4.

86.7

26752

308.56

... More
Providing and fixing PVC EXPANSION JOINT in between deck slabs over abutment and pier as shown in the drawing including cost and conveyance of expansion joints including shalimar pad and joint sealant etc, complete.

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

19.9

11820

594

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

19.9

11820

594

... More
iv) Construction of Slab Culvert at Km 2/4.

28.2

16750

594

... More
Supply and fabrication of Fe-240 grade Steel required for all RCC items of works involved in the schedule cost of steel at site and cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete as per section 1600 of MORT&H Specifications (Fifth Revision).

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

0.82

76448

93230

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

0.82

76448

93230

... More
iv) Construction of Slab Culvert at Km 2/4.

1.09

101620

93230

... More
Vibrated Cement concrete grade M15 Nominal Mix, using 40mm size ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700,2100 & 2704 of MORT&H Specification (Fifth Revision) for BASE COURSE BELOW APPROACH SLAB.

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

13

82618

6355.29

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

13

83020

6386.21

... More
iv) Construction of Slab Culvert at Km 2/4.

12.6

82139

6519.01

... More
Vibrated Reinforced Cement concrete grade M30 Design mix, using ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700,2100 & 2704 of MORT&H Specification (Fifth Revision) for APPROACH SLAB.

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

18.3

153050

8363.41

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

18.3

153616

8394.32

... More
iv) Construction of Slab Culvert at Km 2/4.

18.3

155184

8480

... More
Vibrated Cement concrete grade M30 Design mix, using ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700,2100 & 2704 of MORT&H Specification (Fifth Revision) for WEARING COAT OF 75MM UNIFORM THICKNESS OVER DECK SLAB AND APPROACH SLAB.

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

123

79354

645.16

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

123

79644

647.52

... More
iv) Construction of Slab Culvert at Km 2/4.

114

73682

646.34

... More
Vibrated Reinforced Cement concrete grade M40 Design mix, using ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700,2100 & 2704 of MORT&H Specification (Fifth Revision) for RCC CRASH BARRIERS OVER DECK SLAB.

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

5.4

81678

15125.59

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

5.4

81845

15156.51

... More
iv) Construction of Slab Culvert at Km 2/4.

4.7

71714

15258.47

... More
Vibrated Cement concrete grade M15 Nominal Mix, using 40mm size ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700,2100 & 2704 of MORT&H Specification (Fifth Revision) for PCC PARAPET OVER WINGS.

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

6.1

62297

10212.65

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

6.1

62485

10243.57

... More
iv) Construction of Slab Culvert at Km 2/4.

6.1

63614

10428.65

... More
Providing and fixing of GI drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc, complete.

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

4

9084

2271

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

4

9084

2271

... More
iv) Construction of Slab Culvert at Km 2/4.

4

9084

2271

... More
Supply and fixing of High Quality of PVC pipes of 150mm dia including cost and conveyance of pipes to the site and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges etc complete., for proving utility services in footpaths.

-

-

-

... More
iii) a) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 1/4.

65.6

27532

419.7

... More
iii) b) Reconstruction of High level Bridge in lieu of existing minor Bridge at Km 3/2.

65.6

27532

419.7

... More
iv) Construction of Slab Culvert at Km 2/4.

60.8

25517

419.7

... More
Providing and laying earth for filling approaches with a lead of 5 Km including labour charges for spreading, hire and fuel charges for all tools and plants employed etc, complete as directed by the departmental officers.

-

-

-

... More
iv) Construction of Slab Culvert at Km 2/4.

145.88

31136

213.44

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items (excluding GST)

1

-

49221720.87

... More
GST 18% for above SubTotal Amount

1

8859909

8859909.76

... More
Total in Figures (SubTotal + GST)

-

58081630

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.