National Bank For Agriculture And Rural Development Tender
... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
National Bank For Agriculture And Rural Development - NABARD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date14 Dec 2022
Closing Date27 Dec 2022
Tender Amount₹ 1,20,06,000
Costs
EMD
₹ 72,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_HWAY_272280_1Bid Award Id
ViewTender No
TN No_13_2022_2023_ParamankurichiTender Authority
National Bank For Agriculture And Rural Development ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Granular Sub-base with Graded Material (Table:-400-1)-Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401)-for Grading V Material (Specification Number as per MORTH Rev.V 111,112,401,900).
810
-
1571.31
... More
Wet Mix Macadam (Table400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406) (Specification Number as per MORTH Rev.V 111,112,406,900).
1350
-
1859.32
... More
Prime coat (Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502) - over WMM/ WBM.(Specification Number as per MORTH Rev.V 111,112,502,900).
5400
-
78.39
... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm over granular surfaces treated with primer.(Specification Number as per MORTH Rev.V 111,112,503,900).
5400
-
18.65
... More
Bituminous Macadam - Providing and laying bituminous macadam 50mm compacted thick with Central Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 of MORTH Specification - Grading II
270
-
8687.56
... More
Bituminous Concrete 30mm thick (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading,premixed with bituminous binder (Viscosity Grade - 30) at percentage specified by JMF of mix and filer, transporting the hot mix to work site, laying wih a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No.507 complete in all respects) - Grading II.(Specification Number as per MORTH Rev.V 111,112,507,900).
162
-
11542.25
... More
Earthwork for subgrade, shoulders and back fills in accordance with the specifications, lines, grades and cross sections as shown in the drawings or as indicated by the Engineer as per SS20B for 97% Compaction for making up Berms using Carted Earth with an average lead of 1Km MORTH Rev. V
2592
-
214.06
... More
Providing RCC M 15 grade precast KM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete
1
-
906
... More
Providing RCC M 15 grade precast HM stone of standard design as per IRC 8 - 1980 and fixing in position including painting, printing etc., complete
5
-
256
... More
CONSTRUCTION OF PCC RETAINING WALL
-
-
-
... More
Earthwork excavation in all classes of soil except Kankar / Soft disintegrated rock not requiring blasting, medium rock and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF PCC RETAINING WALL.
58.5
-
106.25
... More
Plain Cement Concrete of grade M10 Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for LEVELLING COURSE OF PCC RETAINING WALL.
4.5
-
5204.92
... More
Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for FOOTING OF PCC RETAINING WALL WALL.
12.3
-
6989.92
... More
Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for STEM OF PCC RETAINING WALL- BELOW SILL LEVEL.
21.6
-
7680.98
... More
Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for STEM OF PCC RETAINING WALL - ABOVE SILL LEVEL.
18
-
9433.71
... More
Providing and fixing CLASS I PVC SEEPAGE PIPES of 100 mm dia. of required lengths for abutments and returnwalls including costs and conveyance of all materials to work site and labour charges for fixing , etc., complete to drain the backfill as per section 2706 of MORT&H specifications (Fifth Revision).
36
-
177.5
... More
CONSTRUCTION OF PCC TOE WALL
-
-
-
... More
Earthwork excavation in all classes of soil except Kankar / Soft disintegrated rock not requiring blasting, medium rock and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF PCC TOE WALL.
96.53
-
106.25
... More
Plain Cement Concrete of grade M10 Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for LEVELLING COURSE OF PCC TOE WALL.
8.78
-
5204.92
... More
Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for FOOTING OF PCC TOE WALL WALL.
23.63
-
6921.67
... More
Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for STEM OF PCC TOE WALL- BELOW SILL LEVEL.
29.3
-
6921.67
... More
Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for STEM OF PCC TOE WALL - ABOVE SILL LEVEL.
22.59
-
7008.51
... More
Providing and fixing CLASS I PVC SEEPAGE PIPES of 100 mm dia. of required lengths for abutments and returnwalls including costs and conveyance of all materials to work site and labour charges for fixing , etc., complete to drain the backfill as per section 2706 of MORT&H specifications (Fifth Revision).
19.35
-
177.5
... More
Calculation of SubTotal, GST and Total carried out by system automatically
-
-
-
... More
Sub Total Amount for above all items (excluding GST)
1
-
10174281.22
... More
GST 18% for above SubTotal Amount
1
-
1831370.62
... More
Total in Figures (SubTotal + GST)
-
-
-
Evaluation Notes How It Works ?