National Bank For Agriculture And Rural Development Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Eprocure
Opening Date6 Dec 2021
Closing Date22 Dec 2021
Tender Amount₹ 6,60,80,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing Reinforced Cement Concrete cast-in-situ bored piles of 1200 mm diameter in RCC using M35 (Design mix) using 20mm ISS HBG Metal with minimum cement content of 400 Kg/cum maximum water cement ration of 0.4 and slump of 150-200 mm by tremie concreting including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel and placing in position before concreting seting up of piling equipment, shifting the same from onelocation to another pile location , dismantling and including all labour for boring through all soils , leading the excavated earth to a distance 200m including forming of working platform, mixing concrete, filling in position by tremie pipe, cutting of pile head to cutt off level for casting pile cap including diversion of water course if necessary and all other incidental charges etc., complete as per standard specifications, forming and maintaining protective bunds and all other incidental charges etc., complete for PILES BELOW ABUTMENTS & PIERS as per MORT&H Vth Revision 1000,1107, 1100, 1600,1700,1107

422

-

-

... More
Plain Cement concrete M15 Grade (Nominal Mix 1:2:4) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for LEVELLING COURSE BELOW PILE CAP UNDER ABUTMENTS AND PIERS as per MORT&H 1000, 1500, 1700.

19

-

-

... More
Vibrated Reinforced Cement Concrete M35 (Design Mix) using HBG graded metal 20mm and 12mm ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for PILE CAP UNDER ABUTMENTS, RETURN WALLS AND PIERS as per MORT&H Vth Revision 1000, 1500, 1600, 1700, 2300, 1114

365

-

-

... More
Vibrated Reinforced Cement Concrete M35 (Design Mix) using HBG graded metal 20mm and 12mm ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for ABUTMENTS AND RETURN WALLS SUBSTRUCTURE as per MORT&H Vth Revision 1000, 1500, 1600, 1700, 2300

148

-

-

... More
Vibrated Reinforced Cement Concrete M35 (Design Mix) using HBG graded metal 20mm and 12mm ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for BED BLOCK cum DIRT WALL OVER ABUTMENTS AND PEDESTALS OVER ABUTMENTS as per MORT&H Vth Revision 1000, 1500, 1600, 1700, 2200, 2300

16

-

-

... More
Vibrated Reinforced Cement Concrete M35 (Design Mix) using HBG graded metal 20mm and 12mm ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for PIERS 1500mm dia as per MORT&H Vth Revision 1000, 1500, 1600, 1700, 2300

19

-

-

... More
Vibrated Reinforced Cement Concrete M35 (Design Mix) using HBG graded metal 20mm and 12mm ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for CAPPING BEAM OVER PIERS as per MORT&H Vth Revision 1000, 1500, 1600, 1700, 2200

47

-

-

... More
Supplying and fixing Elastomeric bearing of size 500x300x64mm including cost and conveyance charges etc., to work site labour for fixing of bearing in position and all other incidental charges complete as per MORT&H Vth Revision 2000 and IRC:83-2015 (Part-II)

230400

-

-

... More
Vibrated Reinforced Cement Concrete M35 (Design Mix) using HBG graded metal 20mm and below ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for T-BEAMS AND CROSS BEAMS as per MORT&H Vth Revision 1000, 1500, 1600, 1700, 2200, 2300

140

-

-

... More
Vibrated Reinforced Cement Concrete M35 (Design Mix) using HBG graded metal 20mm and below ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for DECK SLAB, KERB & SAFTEY KERBS as per MORT&H Vth Revision 1000, 1500, 1600, 1700

221

-

-

... More
Vibrated Reinforced Cement Concrete M-40 (Design mix) using 20mm and below ISS size HBG graded metal including cost and conveyance of all materials to site but excluding cost and conveyance and fabrication of steel including cost and labour charges for form work, labour charges for laying, compacting, curing, including all incidental charges etc., complete for CRASH BARRIER as per MORT&H Vth Revision 1000, 1500, 1600, 1700, 2700, 2703

45

-

-

... More
PROVIDING AND FIXING OF GALVINISED IRON DRAINAGE SPOUTS OF 100mm dia as per G.O.I drawing No.SD/205 with gratting arrangements at top as shown in the drawing using 12mm X 25mm flats for gratting arrangements and 100mm dia drainage spouts projecting atleast 300mm beyond the bottom of the deck slab including cost and conveyance of all materials to site and fixing them in position as directed by the departmental officers etc., complete for as per MORT&H Vth Revision 2705

24

-

-

... More
Vibrated cement concrete M15 Grade (Nominal mix 1:2:4) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for PARAPET OVER RETURN WALLS as per MORT& H Vth Revision 1000, 1500, 1700, 2100

8

-

-

... More
Supply and installation of STRIP SEAL EXPANSION joint system conforming in the 40mm wide expansion gap provided in between decks and in between deck and dirt wall over abutment with fatigue tested structural steel section at the nosing and anchorage assembly, including cost and conveyance of all materials, cost of testing as per the MORT&H specifications, including labour, equipment and incidental charges for fixing the joints complete in all respects, as per specifications as per MORT&H Vth Revision 2600.

49.75

-

-

... More
Vibrated cement concrete M15 Grade (Nominal mix 1:2:4) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for BASE COURSE BELOW APPROACH AND APPROACH RAMP as per MORT & H Vth Revision 1000, 1500, 1700,1600, 2300

14

-

-

... More
Vibrated Reinforced Cement Concrete M30 (Design mix) using HBG graded metal 20mm and below ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for APPROACH SLAB as per MORT & H Vth Revision 1000, 1500, 1600, 1700, 2704

19

-

-

... More
Vibrated Reinforced Cement Concrete M30 (Design mix) using HBG graded of size metal 25mm, 12mm & 6mm IRC size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work cost of premoulded expansion joint and fixing the same in position and centering labour charges for compacting, curing, including all incidental charges etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab as per MORT&H Vth Revision 1000, 1500, 1600, 1700, 2702

592

-

-

... More
Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and returns including cost and conveyance of all materials to worksite, cost and labour for semisperical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., to drain of the backfill as per MORT&H Vth Revision 2706

132

-

-

... More
Providing filter media behind the abutments and wings using 53mm - 5.60mm metal to 600 mm thick and well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance to worksite including all other incidental charges in accordance with the technical specification and as directed by the departmental officers etc., complete. as per MORT&H Vth Revision 2504 Cl.710.1.4 & Appendix-6 of IRC: 78-2014

105

-

-

... More
Filling behind Abutments and Wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete as per MORT&H Vth Revision 305 Cl.710.1.4 & Appendix-6 of IRC: 78-2014

245

-

-

... More
Supply and fabrication of Steel Grade Fe- 500 required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification upto 16mm dia & Above 16mm dia as per MORT&H Vth Revision 1000, 1600

139

-

-

... More
Supply and fabrication of Steel Grade Fe- 240 required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification as per MORT&H Vth Revision 1000, 1600

3.9

-

-

... More
Supply and fixing of High quality of PVC Duct pipes of 160 mm dia 4 Kg/cm2 including cost and conveyance of pipes to the sie and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges complete for providing utility services in footpaths.

330

-

-

... More
FORMATION OF APPROACH ROAD

-

-

-

... More
Picking the existing BT surface, leveling and sectioning in accordance with specifications and as directed by the Engineer. as per MORT & H 111, 112, 202, 303.4.3, 501

463.75

-

-

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way in accordance with the specifications and the lines, grades, and cross section shown in the drawings or as directed by the Engineer for Box Cutting as per MORTH V Revision 111, 112, 202, 301, 302, 303, 305, 900

126.99

-

-

... More
Providing and laying granular Sub-base as per table No.400-1/400-2 and Grading V of MORT&H Revision V with and any other Granular Material or a combination those of for required thick to give a CBR of 30 on prepared sub-grade in accordance with the requirements of the specification as per MORT&H Vth Revision 111, 112, 401, 900

275.24

-

-

... More
Providing and laying, spreading and compacting graded stone aggreegate to Wet mix macadam specification including pre-mixing the materials with water at OMC in base mix plant (pug mill ) carriage of mixed materials by tipper to site and laying in uniform layers in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MORT&H Vth Revision 111, 112, 406, 900

535.62

-

-

... More
Collection and supply of carted earth with an average lead including excavation, removal and satisfactory disposal of all materials necessary for the construction of road way in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer with 97% compaction for formation as per MORT&H Vth Revision 111, 112, 202, 301, 302, 303, 305, 900

980.58

-

-

... More
Providing and laying of Prime coat using Emulsion bitumen at the rate of 7Kg/10 Sqm. over the WMM surface preparatory to another bituminous construction over it as per MORT&H Vth Revision 111, 112, 501, 502, 900

2191.2

-

-

... More
Providing and laying of tack coat using Emulsion bitumen at the rate of 2.50 /10Sqm over the Prime coat surface preparatory to another bituminous construction over it as per MORT&H Vth Revision 111, 112, 501, 503, 900

2191.2

-

-

... More
Bituminous macadam of 50mm thickness which work shall consist of construction, in a single course of compacted crushed aggregates premixed with bituminous binder 60/70 grade bulk bitumen which will be procurred by the Contractor at the rate of 3.5 percent by weight of the total mix, to serve as base / binder couse, in accordance with the requirement of the specifications and in conformity with the drawing or as directed by the Engineer using approved CMP and paver finisher as per MORT& H Vth Revision 111, 112, 501, 504, 900

107.96

-

-

... More
Providing and laying 30mm thick compacted Bituminous Concrete which shall consist of construction of a single course binder / wearing course on a previously prepared bituminous base to the requirements of the specification using 60/70 Grade bitumen using approved CMP and paver finisher. as per MORT&H Vth Revision 111, 112, 501, 507, 509

64.77

-

-

... More
Collection and supply of carted earth with an average lead including excavation, removal and satisfactory disposal of all materials necessary for the construction of road way in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer with 100% compaction for making up low berms as per MORT&H Vth Revision 111, 112, 202, 301, 302, 303, 305, 900

667.8

-

-

... More
FORMATION OF DIVERSION ROAD

-

-

-

... More
Collection and supply of carted earth with an average lead including excavation, removal and satisfactory disposal of all materials necessary for the construction of road way in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer with 95% compaction for formation of embankment as per MORT&H Vth Revision 111, 112, 202, 301, 302, 303, 305, 900

2100

-

-

... More
Providing and laying granular Sub-base as per table No.400-1/400-2 and Grading V of MORT&H Revision V with and any other Granular Material or a combination those of for required thick to give a CBR 30 on prepared sub-grade in accordance with the requirements of the specification as per MORT&H Vth Revision 111, 112, 401, 900

101.25

-

-

... More
Providing and laying, spreading and compacting graded stone aggreegate to Wet mix macadam specification including pre-mixing the materials with water at OMC in base mix plant (pug mill ) carriage of mixed materials by tipper to site and laying in uniform layers in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MORT&H Vth Revision 111, 112, 406, 900

101.25

-

-

... More
Providing and laying of Prime coat using Emulsion bitumen at the rate of 7Kg/10 Sqm. over the WMM surface preparatory to another bituminous construction over it as per MORT&H Vth Revision 111, 112, 501, 502, 900

675

-

-

... More
Providing and laying of tack coat using Emulsion bitumen at the rate of 2.50 /10Sqm over the Prime coat surface preparatory to another bituminous construction over it as per MORT&H Vth Revision 111, 112, 501, 503, 900

675

-

-

... More
Providing laying and rolling of Close graded premix carpet 20mm thick with a liquid seal coat Type’A’ which shall consist of open graded carpet of 20mm thickness in a single course composed of suitable small sized aggregates premixed with bituminous binder with a application of liquid seal coat for sealing the voids in a bituminous surface conforming to the specifications using 60/70 Bulk Bitumen as per MORT&H Vth Revision 111, 112, 501, 503, 900

675

-

-

... More
Supplying fixing and hoisting of NP3 Class 1000mm inner dia R.C.C Pipes to suit the respective diametre of pipes confirming to IS Specifications 458 to various diametre of pipes including cost of Pipes inclusive of all taxes, loading, unloading conveyance and delivery at road site as directed by the departmental officers, including all other incidental charges etc, complete for as per MORT&H Vth Revision 2900

200

-

-

... More
DISMANTLING

-

-

-

... More
Dismantaling the existing Random Rubble Masonry in Cement Mortar in the existing causeway / bridge ad clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officer including all labour and incidental charges etc., complete as per MORT&H Vth Revision 111, 112, 202

495

-

-

... More
Dismantaling the existing Reinforced Cement Concrete Structure and removal and disposing of resulting materials and back filling the resulting trenches and pits etc. or as directed by the departmental officer including all labour and incidental charges etc., complete as per MORT&H Vth Revision 111, 112, 202

201

-

-

... More
CONSTRUCTION OF PCC RETAINING WALL

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOUNDATION OF RETAINING WALL as per MORT&H Vth Revision 304

109.8

-

-

... More
Vibrated cement concrete M20 Grade Nominal mix 1:1.5.3 using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for FOUNDATION OF RETAINING WALL FOOTING as per MORT&H Vth Revision 1000, 1500, 1700, 2100

33.3

-

-

... More
Vibrated cement concrete M20 Grade Nominal mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for BODY WALL OF RETAINING WALL (Below sill Level) as per MORT&H Vth Revision 1000, 1500, 1700, 2100

74.52

-

-

... More
Vibrated cement concrete M20 Grade Nominal mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for BODY WALL OF RETAINING WALL (Above sill Level) as per MORT&H Vth Revision 1000, 1500, 1700, 2100

131.54

-

-

... More
Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and returns including cost and conveyance of all materials to worksite, cost and labour for semisperical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., to drain of the backfill as per MORT&H Vth Revision 2700

60

-

-

... More
Refilling the Excavated earth complying with the standard specification for filling in the foundation trench including labour charges etc complete as per MORTH V 304

173.19

-

-

... More
CONSTRUCTION OF RCC RETAINING WALL

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOUNDATION OF RETAINING WALL as per MORT&H Vth Revision 304

1397.5

-

-

... More
Vibrated cement concrete M20 Grade Nominal mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for RETAINING WALL FOUNDATION CONCRETE as per MORT&H Vth Revision 1000, 1500, 1700, 2100

98

-

-

... More
Vibrated Reinforced Cement Concrete M25 (Design Mix) using HBG graded metal 20mm and below ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for RETAINING WALL as per MORT & H Vth Revision 1000, 1500, 1700, 2100

516

-

-

... More
Vibrated Reinforced Cement Concrete M25 (Design Mix) using HBG graded metal 20mm and below ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for RETAINING WALL as per MORT & H Vth Revision 1000, 1500, 1700, 2100

329

-

-

... More
Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and returns including cost and conveyance of all materials to worksite, cost and labour for semisperical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., to drain of the backfill as per MORT&H Vth Revision 2700

130

-

-

... More
Supply and fabrication of Steel Grade Fe- 500 required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges as per standard specification including suitable etc., complete as per MORT&H Vth Revision 1000, 1600

38.92

-

-

... More
CONSTRUCTION OF RCC BOX CULVERT

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOUNDATION OF BOX CULVERT AND WING WALL as per MORT&H Vth Revision 304

120.26

-

-

... More
Filling inside M.sand (Crushed stone sand) and conveyance of sand to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete as per MORT&H 304.

13.97

-

-

... More
Vibrated cement concrete M20 Grade Nominal mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for WING WALL (Below Sill Level) as per MORT&H Vth Revision 1000, 1500, 1700, 2100

17.4

-

-

... More
Vibrated cement concrete M20 Grade Nominal mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for WING WALL (Above Sill Level) as per MORT&H Vth Revision 1000, 1500, 1700, 2100

16.73

-

-

... More
Vibrated Reinforced Cement Concrete M25 (Design Mix) using HBG graded metal 20mm and 12mm ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for BOX CULVERT as per MORT&H Vth Revision 1000, 1500, 1600, 1700, 2200, 2300

37.38

-

-

... More
Supply and fabrication of Steel Grade Fe- 500 required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges as per standard specification including suitable etc., complete as per MORT&H Vth Revision 1000, 1600

2.84

-

-

... More
Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and returns including cost and conveyance of all materials to worksite, cost and labour for semisperical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., to drain of the backfill as per MORT&H Vth Revision 2706

8

-

-

... More
Filling behind culvert with clean grity gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete as per MORT&H Vth Revision 2907

20.04

-

-

... More
Vibrated Reinforced Cement Concrete M30 (Design mix) using HBG graded of size metal 25mm, 12mm & 6mm IRC size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work cost of premoulded expansion joint and fixing the same in position and centering labour charges for compacting, curing, including all incidental charges etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab as per MORT&H Vth Revision 1000, 1500, 1600, 1700, 2702

22.75

-

-

... More
Sub Total Bid Price (in figures)

1

-

-

... More
GST @ 12% of above all Schedules (in figures)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.