National Bank For Agriculture And Rural Development Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date8 Jan 2024
Closing Date23 Jan 2024
Tender Amount₹ 7,07,80,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying of prime coat over WBM/WMM surface using 7 kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc, complete .(Specification Number as per MORTH Rev.V 111,112,502,900)

29649

2241464

75.6

... More
Providing and laying Tack Coat over WBM/WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion(RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete .(Specification Number as per MORTH Rev.V 111,112,503,900).

29649

504329

17.01

... More
Providing and laying 50mm consolidated thick bituminous macadam using 0.2cum of 26.5-13.2mm, 0.43cum of 13.20-2.36mm and 0.08 cum of 2.36mm and blow size IRC metal with 37 kg of VG30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross section and consolidated by 8-10 tone vibrator roller to the require density etc including labour for attending the paver to site, etc including hire charges and fuel charges for 20-30 ton CMP with bitumen boiler, tipper trucks, paver finisher / vibrator roller and all other tools and plants required including fuel and all other incidental charges etc complete as per specification using CMP (Specification Number as per MORTH Rev.V 111,112,504,900).

1483

11778608

7942.42

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 30mm with mechanical paver finisher to the specified grades and cross sections and consolidatedby8-10tonne Vibratory/ Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/9m paver finisher, Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.(Specification Number as per MORTH Rev.V 111,112,507,900).

890

9144598

10274.83

... More
Providing and laying Carted earth with lead of 15 km including const of Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank with initial lead and lift and all other incidental charges including hire charges for tools and plant for cutting road edge to required depth as per SS20B.complete as per MORT&H Specificaton No.304 & 305

7728

2680765

346.89

... More
Providing RCC M15 grade precast HM stone of standard design as per IRC 8-1980 and fixing in position including painting and printing etc complete (as per MORT&H specification No.805).

30

7680

256

... More
Provididing RCC M15 Grade Precast KM stone of standard desing as per IRC 8-1980 and fixing in position including painting and printing ect., complete (as per MORTH SPECIFICATION No.805)

7

6342

906

... More
Provision for Scheme Board Direction and Place Identification signs - Type IV. Providing and erecting Direction and place Identification Retro reflectorised sign made out of high Intensity Prismatic Grade sheeting confirming to type IV standards of IRC - 67: 2012 and ASTM D 4956-09. Specification and fixed over 2 mm thick Aluminium sheet fixed over a back supporting frame of 25mm x 25mm x 3mm Mild steel angel and supported on a mild steel angel post 75 X 75 X 6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painte as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cm X 45cm X 60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro Reflectro sheet shall consist of minimum co efficient of Retro - reflection as per Table 6.6 of IRC67-2012. The retro - reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67.2012. (as per MORT & H Specification No 801) (For Sign having area more than 0.9sqm) TYPE -IV

2.16

25498

11805

... More
SUB ESTIMATE - BOX CULVERT Dismantling the existing RR masonry in cement mortar upto 3.0 m height in the existing causeway and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the Departmental Officers including all labour and incidental charges etc., complete as per MOR&H Vth rev specification No.202,111,112

-

-

-

... More
Box Culvert Single vent (2.0mx2.0m) at Km 0/4

8

2059

257.4

... More
Box Culvert Double vent (2.0mx2.0m) at Km 3/4

23

5920

257.4

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(i)

12

3088

257.4

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(iii)

10

2574

257.4

... More
Dismantling the existing Cut Stone culvert and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete as per MOR&H Vth rev specification No.202111,112

-

-

-

... More
Box Culvert Double vent (3.0mx3.0m) at Km 5/4(ii)

30

13989

466.3

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(iii)

2

932

466.3

... More
Earthwork excavation in all classes of soil except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT and Retaining wall as per MORT&H Vth rev specification No.304,111,112

-

-

-

... More
Box Culvert Single vent (2.0mx2.0m) at Km 0/4

91

20393

224.1

... More
Box Culvert Double vent (2.0mx2.0m) at Km 3/4

190

42579

224.1

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(i)

105

23530

224.1

... More
Box Culvert Double vent (3.0mx3.0m) at Km 5/4(ii)

357

80003

224.1

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(iii)

113

25323

224.1

... More
Plain Cement Concrete M-15 Grade, Nominal Mix, 1:2:4, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of form work, lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in depths and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for Leveling course for Box culvert as per MORT&H Vth rev specification No.1000, 1500, 1700, 2200,2100.

-

-

-

... More
Box Culvert Single vent (2.0mx2.0m) at Km 0/4

7

43066

6152.34

... More
Box Culvert Double vent (2.0mx2.0m) at Km 3/4

8

49218

6152.34

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(i)

6

36783

6130.63

... More
Box Culvert Double vent (3.0mx3.0m) at Km 5/4(ii)

12

73567

6130.63

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(iii)

7

42914

6130.63

... More
Vibrated Cement Concrete M20 nominal mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Footing of wing wall as per MOR&H Vth rev specification No.1000, 1500, 1700, 2200, 2300.

-

-

-

... More
Box Culvert Single vent (2.0mx2.0m) at Km 0/4

6

38016

6336.05

... More
Box Culvert Double vent (2.0mx2.0m) at Km 3/4

21

133057

6336.05

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(i)

10

63143

6314.34

... More
Box Culvert Double vent (3.0mx3.0m) at Km 5/4(ii)

19

119972

6314.34

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(iii)

10

63143

6314.34

... More
Vibrated Cement Concrete M20 nominal mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Stem of wing wall as per MOR&H Vth rev specification No.1000, 1500, 1700, 2200, 2300.

-

-

-

... More
Box Culvert Single vent (2.0mx2.0m) at Km 0/4

29

254364

8771.2

... More
Box Culvert Double vent (2.0mx2.0m) at Km 3/4

95

811400

8541.06

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(i)

47

405031

8617.7

... More
Box Culvert Double vent (3.0mx3.0m) at Km 5/4(ii)

126

985453

7821.06

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(iii)

46

396414

8617.7

... More
Vibrated Reinforced Cement Concrete M25 design mix using 20mm ISS size HBG graded metal including cost and conveyance of all materials to worksite including cost of cement at site including soft water, labour charges for mixing transporting, laying and curing concrete, etc., complete as per relevant standard specification for Base Slab, Cover Slab and Side walls excluding Cost of Steel for culvert as per MORT&H Vth rev specification No.1000, 1500, 1700, 2200, 2300.

-

-

-

... More
Box Culvert Single vent (2.0mx2.0m) at Km 0/4

41

484682

11821.52

... More
Box Culvert Double vent (2.0mx2.0m) at Km 3/4

69

768860

11142.9

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(i)

36

423376

11760.47

... More
Box Culvert Double vent (3.0mx3.0m) at Km 5/4(ii)

102

1121520

10995.3

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(iii)

41

483792

11799.81

... More
Vibrated Cement Concrete M15 nominal mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Parapet over Box Culvert as per MOR&H Vth rev specification No.1000, 1500, 1700, 2200, 2300.

-

-

-

... More
Box Culvert Single vent (2.0mx2.0m) at Km 0/4

2

21794

10897.3

... More
Box Culvert Double vent (2.0mx2.0m) at Km 3/4

3

31688

10562.85

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(i)

1.5

16313

10875.59

... More
Box Culvert Double vent (3.0mx3.0m) at Km 5/4(ii)

4

41741

10435.34

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(iii)

2

21751

10875.59

... More
Supply and fabrication of Fe.500D steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete as per MOR&H Vth rev specification No.1600.

-

-

-

... More
Box Culvert Single vent (2.0mx2.0m) at Km 0/4

2.7

255971

94804.27

... More
Box Culvert Double vent (2.0mx2.0m) at Km 3/4

4

379217

94804.27

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(i)

2.35

222790

94804.27

... More
Box Culvert Double vent (3.0mx3.0m) at Km 5/4(ii)

7.2

682590

94804.27

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(iii)

2.7

255971

94804.27

... More
Supply and fabrication of Fe.240 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete as per MOR&H Vth rev specification No.1600.

-

-

-

... More
Box Culvert Single vent (2.0mx2.0m) at Km 0/4

0.1

9480

94804.27

... More
Box Culvert Double vent (2.0mx2.0m) at Km 3/4

0.2

18960

94804.27

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(i)

0.1

9480

94804.27

... More
Box Culvert Double vent (3.0mx3.0m) at Km 5/4(ii)

0.25

23701

94804.27

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(iii)

0.1

9480

94804.27

... More
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for mixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, formwork, cost of premoulded expansion joints and fixing the same in position etc., excluding steel complete for wearing coat of 75mm uniform thickness over deck slab as per MORTH Rev. V Specification No.1000, 1500, 1700, 2702.

-

-

-

... More
Box Culvert Single vent (2.0mx2.0m) at Km 0/4

24

17257

719.07

... More
Box Culvert Double vent (2.0mx2.0m) at Km 3/4

39

28043

719.07

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(i)

20

14348

717.41

... More
Box Culvert Double vent (3.0mx3.0m) at Km 5/4(ii)

56

40174

717.41

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(iii)

24

17217

717.41

... More
FILLING BEHIND ABUTMENTS AND RETURNS with clean gritty free draining gravel including cost and draining gravel having PHI value more than 35 conveyance of gravel to worksite , laying, handling charges and filling in layers tamping under optimum moisture content to get the maximum density, including watering, with all leads and lifts for water and all other incidental charges, etc., complete as per cl 710.1.4 & Appendix 6 of IRC 78- 2014

-

-

-

... More
Box Culvert Single vent (2.0mx2.0m) at Km 0/4

25

13410

536.4

... More
Box Culvert Double vent (2.0mx2.0m) at Km 3/4

20

10728

536.4

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(i)

20

10034

501.74

... More
Box Culvert Double vent (3.0mx3.0m) at Km 5/4(ii)

37

18564

501.74

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(iii)

25

12543

501.74

... More
Providing and fixing PVC seepage pipes of 100mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing, etc. complete to drain the backfill in between abutment and wings as per MOR&H Vth rev specification No.2706

-

-

-

... More
Box Culvert Single vent (2.0mx2.0m) at Km 0/4

12

2130

177.5

... More
Box Culvert Double vent (2.0mx2.0m) at Km 3/4

28

4970

177.5

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(i)

12

2130

177.5

... More
Box Culvert Double vent (3.0mx3.0m) at Km 5/4(ii)

16

2840

177.5

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(iii)

20

3550

177.5

... More
Clearing light jungle by cutting, removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees upto 150mm girth complete for Diversion road (Specification Number as per MORTH Rev.V 201),111,112

-

-

-

... More
Box Culvert Single vent (2.0mx2.0m) at Km 0/4

158

924

5.85

... More
Box Culvert Double vent (2.0mx2.0m) at Km 3/4

158

924

5.85

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(i)

158

924

5.85

... More
Box Culvert Double vent (3.0mx3.0m) at Km 5/4(ii)

176

1029

5.85

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(iii)

158

924

5.85

... More
Carted earth with lead of 15 km including cost of Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank with initial lead and lift and all other incidental charges including hire charges for tools and plant for cutting road edge to required depth for DIVERSION ROAD as per SS20B.complete as per MORT&H Specificaton No.304 & 305

-

-

-

... More
Box Culvert Single vent (2.0mx2.0m) at Km 0/4

392

154095

393.1

... More
Box Culvert Double vent (2.0mx2.0m) at Km 3/4

392

149567

381.55

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(i)

392

140508

358.44

... More
Box Culvert Double vent (3.0mx3.0m) at Km 5/4(ii)

471

168825

358.44

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(iii)

392

140508

358.44

... More
Construction of granular sub- base Grade.V of 150 mm thick by providing close graded Material, mixing in a mechanical mix plantat OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, for Diversion road complete (Specification Number as per MORTH Rev.V 111,112,401,900).

-

-

-

... More
Box Culvert Single vent (2.0mx2.0m) at Km 0/4

17

27132

1596.03

... More
Box Culvert Double vent (2.0mx2.0m) at Km 3/4

17

27132

1596.03

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(i)

17

27132

1596.03

... More
Box Culvert Double vent (3.0mx3.0m) at Km 5/4(ii)

17

27132

1596.03

... More
Box Culvert Single vent (2.0mx2.0m) at Km 5/4(iii)

17

27132

1596.03

... More
SUB ESTIMATE - PIPE CULVERT Dismantling the existing RR masonry in cement mortar upto 3.0 m height in the existing causeway and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the Departmental Officers including all labour and incidental charges etc., complete as per MOR&H Vth rev specification No.202,111,112

-

-

-

... More
Single row Pipe Culvert at Km 1/10

12

3088

257.4

... More
Single row Pipe Culvert at Km 4/10

12

3088

257.4

... More
Earthwork excavation in all classes of soil except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BODY WALL OF PIPE CULVERT as per MORT&H Vth rev specification No.304,111,112

-

-

-

... More
Single row Pipe Culvert at Km 1/10

35

7843

224.1

... More
Single row Pipe Culvert at Km 4/10

35

7843

224.1

... More
Plain Cement Concrete M-20 Grade, Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of form work, lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in depths and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for FOUNDATION OF BODY WALL as per MORT&H Vth rev specification No.111,112,900,1000, 1500, 1700, 2200.

-

-

-

... More
Single row Pipe Culvert at Km 1/10

4

25108

6277.1

... More
Single row Pipe Culvert at Km 4/10

4

25021

6255.4

... More
Vibrated Cement Concrete M-20 Grade, Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of form work, lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in depths and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for BODY WALL OF PIPE CULVERT BELOW SILL as per MORT&H Vth rev specification No.1000, 1500, 1700, 2100,111,112,900.

-

-

-

... More
Single row Pipe Culvert at Km 1/10

10

103639

10363.92

... More
Single row Pipe Culvert at Km 4/10

10

103422

10342.2

... More
Vibrated Cement Concrete M-20 Grade, Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of form work, lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in depths and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for BODY WALL AND PARAPET OF PIPE CULVERT ABOVE SILL as per MORT&H Vth rev specification No.1000, 1500, 1700, 1200,111,112,900

-

-

-

... More
Single row Pipe Culvert at Km 1/10

16

206037

12877.34

... More
Single row Pipe Culvert at Km 4/10

16

205690

12855.64

... More
Supplying of RCC Pipes conforming to IS 458 of NP3 class of 1000 mm dia of standard length in position with Collars including cost and conveyance of Pipes and Collars which will be supplied by the contractor himself at worksite including placing the pipes and position, packing joints in Cement Mortar 1:4 and all other incidental charges etc., complete as per the standard specification for Diversion road as per MORT&H Specificaton No.2900

-

-

-

... More
Single row Pipe Culvert at Km 1/10

7.5

29160

3888

... More
Single row Pipe Culvert at Km 4/10

7.5

29160

3888

... More
Hoisting and fixing of 1000mm dia NP3 pipe to proper gradient, including placing the pipes in position, packing joints with cement mortar 1:4 and all labour charges, all other incidental charges etc, complete for culverts as per sec 2900 of MORT&H rev.5

-

-

-

... More
Single row Pipe Culvert at Km 1/10

7.5

1815

242

... More
Single row Pipe Culvert at Km 4/10

7.5

1815

242

... More
Stone Dust Filling between body wall and around the RCC pipes with stone dust including cost and conveyance of stone dust to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete as per as per sec 1000 of MORT&H rev.5.

-

-

-

... More
Single row Pipe Culvert at Km 1/10

7

3109

444.22

... More
Single row Pipe Culvert at Km 4/10

7

3038

434.04

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items (excluding GST)

1

-

59982614.19

... More
GST 18% for above SubTotal Amount

1

10796870

10796870.55

... More
Total in Figures (SubTotal + GST)

-

70779484

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.