National Bank For Agriculture And Rural Development Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date19 Sep 2024
Closing Date8 Oct 2024
Tender Amount₹ 3,26,45,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam of required thickness including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Rev-5.

2598.3

5915055

2276.51

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 502 & 900 of MORTH Rev-5.

10393.2

848604

81.65

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 503 & 900 of MORTH Rev-5.

10393.2

195600

18.82

... More
Providing and laying Tack Coat over Dry Lean cement concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 503 & 900 of MORTH Rev-5.

48.2

1026

21.3

... More
Providing and laying 50mm thick Consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20mm 0.430cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below IRC metal with 37 kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plants required, including all other and incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 504 & 900 of MORTH Rev-5.

520.8

4537969

8713.46

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50 - 2.36mm and 0.26 cum of 2.36mm and below with 50.30 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10t Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, Paver finisher, Vibratory roller and all other tools and plants required, including all other and incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 507 & 900 of MORTH Rev-5.

313.3

3469531

11074.15

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation backfilling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for Carted earth for making up berms with conveyance of 5 Km complete as directed by the departmental officers as per clause 111, 112, 301, 305 & 900 of MORT&H Specification (Fifth Revision)

2600

618748

237.98

... More
Providing RCC M15 grade precast HM stone of standard design as per IRC 26 -1967 and fixing in position including painting and printing etc., complete (as per MORTH & H specification no 804).

11

6321

574.65

... More
Providing RCC M15 grade precast KM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete (as per MORTH & H specification no 804).

2

4394

2197

... More
Supply and fixing of R.C.C. GUIDE POSTS of size 1.2x0.2x0.2 m with reflective star stickers with tin M.S. Sheet with two side packing and top cover of 0.75 inches in R.C.C 1:2:4 mix using 20mm HBG metal with 10mm dia bars as vertical with 8mm dia stirrups including 8.25 inches x 4.25 feet mould with star shape of 5 inches and top Projection by Projection by 0.75 inches x 3 inches including cost and conveyance of materials to worksite etc., complete.

30

36606

1220.22

... More
Providing and erecting of Direction and Place Identification Retro-Reflectorized Sign made out of High Intensity Prismatic grade sheeting confirming to Type IV standards of IRC 67-2012 and ASTM D 4956-09 specification and fixed over 2mm thick aluminium sheet fixed over a back supporting frame of size 25mm x 25mm x 3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmx45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall he obtained as per IRC 67:2012. (as per MORT&H Specification No 801). Rate per Sqm (For sign having area more than 0.9 sqm) Type-IV

1.8

21249

11805

... More
Earthwork excavation in all classes of soil except Soft disintegrated rock and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per Clause 111, 112, 304 of MORT&H (V Revision) for FOUNDATION OF BOX CULVERT, RETAINING WALL AND MINOR BRIDGE.

-

-

-

... More
i) Construction of Box Culvert at Km 1/4, 1/8 & 2/4.

243.6

60052

246.52

... More
ii) Construction of Retaining wall at Km 0/2 & 1/6.

118.1

29114

246.52

... More
iii) Construction of Minor Bridge at Km 0/2.

561.4

138396

246.52

... More
Plain Cement Concrete of grade M10 (Nominal mix), using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for LEVELING COURSE OF BOX CULVERT.

-

-

-

... More
i) Construction of Box Culvert at Km 1/4, 1/8 & 2/4.

12.6

68815

5461.56

... More
Vibrated Reinforced cement concrete of grade M25 (design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel including cost of form work, labour charges for mixing, transporting, laying, curing concrete, potable water, working at heights, hire charges for tools and plants, including all other incidental charges etc., complete as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for BASE SLAB, SIDE AND TOP SLAB OF BOX CULVERT.

-

-

-

... More
i) Construction of Box Culvert at Km 1/4, 1/8 & 2/4.

70.1

817419

11660.76

... More
Supply and fabrication of Fe-500D grade Steel required for all RCC items of works involved in the schedule cost of steel at site and cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete as per clause 1600 of MORT&H Specifications (Fifth Revision) for BOX CULVERT AND MINOR BRIDGE.

-

-

-

... More
i) Construction of Box Culvert at Km 1/4, 1/8 & 2/4.

4.88

466573

95609.27

... More
iii) Construction of Minor Bridge at Km 0/2.

12.2

1166433

95609.27

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for FOOTINGS OF WING WALL OF BOX CULVERT AND RETAINING WALL. (BELOW SILL).

-

-

-

... More
i) Construction of Box Culvert at Km 1/4, 1/8 & 2/4.

39.9

252367

6325.01

... More
ii) Construction of Retaining wall at Km 0/2 & 1/6.

29.6

186942

6315.63

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for STEM OF WING WALL OF BOX CULVERT AND RETAINING WALL. (BELOW SILL).

-

-

-

... More
i) Construction of Box Culvert at Km 1/4, 1/8 & 2/4.

65.6

547241

8342.09

... More
ii) Construction of Retaining wall at Km 0/2 & 1/6.

53.9

430111

7979.8

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for STEM OF WING WALL OF BOX CULVERT AND RETAINING WALL. (ABOVE SILL).

-

-

-

... More
i) Construction of Box Culvert at Km 1/4, 1/8 & 2/4.

51

545739

10700.78

... More
ii) Construction of Retaining wall at Km 0/2 & 1/6.

46.2

439992

9523.64

... More
Vibrated Cement Concrete M15 grade Nominal Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specification, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) FOR PARAPET OVER BOX CULVERT, RETAINING WALL AND MINOR BRIDGE.

-

-

-

... More
i) Construction of Box Culvert at Km 1/4, 1/8 & 2/4.

3

33339

11113.05

... More
ii) Construction of Retaining wall at Km 0/2 & 1/6.

4.8

54925

11442.73

... More
iii) Construction of Minor Bridge at Km 0/2.

6.1

65351

10713.4

... More
Providing and fixing PVC seepage pipes of 100mm dia. PVC pipes of requied lengths including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc., complete as per clause 2700 of MORT&H Specification (Fifth Revision) to drain of the backfill in the BOX CULVERT AND RETAINING WALL.

-

-

-

... More
i) Construction of Box Culvert at Km 1/4, 1/8 & 2/4.

16.2

2875

177.5

... More
ii) Construction of Retaining wall at Km 0/2 & 1/6.

25.2

4473

177.5

... More
Refilling behind the body wall with excavated earth including conveyance of all materials to work site including labour charges for filling in layers compacting by manual labour under optimum moisture content to get the maximum density as layer including all incidental charges etc,. complete FOR BOX CULVERT AND RETAINING WALL. (Labour Charges only).

-

-

-

... More
i) Construction of Box Culvert at Km 1/4, 1/8 & 2/4.

199

8527

42.85

... More
ii) Construction of Retaining wall at Km 0/2 & 1/6.

104.26

4467

42.85

... More
Earthwork excavation in soft disintegrated rock except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per clause 111, 112 & 304 of MORT&H V Revision for DRESSING THE BED UP TO SILL LEVEL.

-

-

-

... More
iii) Construction of Minor Bridge at Km 0/2.

112.9

13916

123.26

... More
Earthwork excavation in Soft disintegrated rock not requiring blasting except medium rock and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per clause 111, 112 & 304 of MORT&H V Revision for FOUNDATION OF ABUTMENTS, PIERS AND WINGS.

-

-

-

... More
iii) Construction of Minor Bridge at Km 0/2.

278.3

136069

488.93

... More
Cement Concrete of grade M10 (Nominal mix), using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for LEVELING COURSE UNDER FOOTINGS.

-

-

-

... More
iii) Construction of Minor Bridge at Km 0/2.

15.7

85468

5443.83

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for FOOTINGS OF ABUTMENT AND WINGS BELOW SILL LEVEL.

-

-

-

... More
iii) Construction of Minor Bridge at Km 0/2.

302.7

2109280

6968.22

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for SUBSTRUCTURE OF ABUTMENTS AND WINGS ABOVE SILL LEVEL.

-

-

-

... More
iii) Construction of Minor Bridge at Km 0/2.

151.9

1254308

8257.46

... More
Vibrated Reinforced Cement concrete grade M30 Design mix, using ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700,2100 & 2704 of MORT&H Specification (Fifth Revision) for DIRT WALL CUM BED BLOCK OVER ABUTMENTS.

-

-

-

... More
iii) Construction of Minor Bridge at Km 0/2.

6.5

82740

12729.37

... More
Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to work site, labour charges for fixing the same in the correct position and all other incidental charges et., complete.

-

-

-

... More
iii) Construction of Minor Bridge at Km 0/2.

11

1210

110

... More
Vibrated Reinforced Cement concrete grade M30 Design mix, using ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700,2100 & 2704 of MORT&H Specification (Fifth Revision) for DECK SLAB.

-

-

-

... More
iii) Construction of Minor Bridge at Km 0/2.

91.4

1092081

11948.37

... More
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges " Fifth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete.

-

-

-

... More
iii) Construction of Minor Bridge at Km 0/2.

66.1

88556

1339.74

... More
Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers including compacting with power roller to get the maximum density including watering and all other incidental charges etc, complete as per clause 305, 2907 of MORT&H Specification (Fifth Revision).

-

-

-

... More
iii) Construction of Minor Bridge at Km 0/2.

107.9

29349

272.01

... More
Providing and fixing PVC EXPANSION JOINT in between deck slabs over abutment and pier as shown in the drawing including cost and conveyance of expansion joints including shalimar pad and joint sealant etc, complete.

-

-

-

... More
iii) Construction of Minor Bridge at Km 0/2.

23

15028

653.4

... More
Supply and fabrication of Fe-240 grade Steel required for all RCC items of works involved in the schedule cost of steel at site and cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete as per section 1600 of MORT&H Specifications (Fifth Revision).

-

-

-

... More
iii) Construction of Minor Bridge at Km 0/2.

1.1

105170

95609.27

... More
Vibrated Cement concrete grade M15 Nominal Mix, using 40mm size ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700,2100 & 2704 of MORT&H Specification (Fifth Revision) for BASE COURSE BELOW APPROACH SLAB.

-

-

-

... More
iii) Construction of Minor Bridge at Km 0/2.

13

90299

6946.14

... More
Vibrated Reinforced Cement concrete grade M30 Design mix, using ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700,2100 & 2704 of MORT&H Specification (Fifth Revision) for APPROACH SLAB.

-

-

-

... More
iii) Construction of Minor Bridge at Km 0/2.

21.1

193892

9189.24

... More
Vibrated Cement concrete grade M30 Design mix, using ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700,2100 & 2704 of MORT&H Specification (Fifth Revision) for WEARING COAT OF 75MM UNIFORM THICKNESS OVER DECK SLAB AND APPROACH SLAB.

-

-

-

... More
iii) Construction of Minor Bridge at Km 0/2.

142.6

99834

700.1

... More
Vibrated Reinforced Cement concrete grade M40 Design mix, using ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700,2100 & 2704 of MORT&H Specification (Fifth Revision) for RCC CRASH BARRIERS OVER DECK SLAB.

-

-

-

... More
iii) Construction of Minor Bridge at Km 0/2.

6.9

111696

16187.85

... More
Providing and fixing of GI drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc, complete.

-

-

-

... More
iii) Construction of Minor Bridge at Km 0/2.

4

9992

2498.1

... More
Supply and fixing of High Quality of PVC pipes of 160mm dia including cost and conveyance of pipes to the site and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges etc complete., for proving utility services in footpaths.

-

-

-

... More
iii) Construction of Minor Bridge at Km 0/2.

76.1

31939

419.7

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items (excluding GST)

1

-

27661436

... More
GST 18% for above SubTotal Amount

1

4979058

4979058

... More
Total Value put to Tender

1

-

32640494

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 12% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 12% of GST

1

-

-

... More
Total in Figures (SubTotal + GST)

-

32640494

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.