National Bank For Agriculture And Rural Development Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
National Bank For Agriculture And Rural Development - NABARD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date5 Mar 2022
Closing Date28 Mar 2022
Tender Amount₹ 5,70,60,000
Costs
EMD
₹ 2,96,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_HWAY_223861_2Bid Award Id
ViewTender No
TN.No.20/2021-2022/SDO/TRY-NRRTender Authority
National Bank For Agriculture And Rural Development ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying granular Sub-base as per table No.400-1/400-2 and Grading V of MORT&H Revision V with and any other Granular Material or a combination those of for required thick to give a CBR of 30 on prepared sub-grade in accordance with the requirements of the specification as per MORT&H Vth 111, 112, 401, 900
1713
-
1536.4
... More
Providing and laying, spreading and compacting graded stone aggregate Wet mix macadam specification including pre-mixing the material with water at OMC in base mix plant (Pugmill) carriage of mixed material by tipper to site and laying in uniform layers in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MORT&H Vth Revision 111, 112, 406, 900
2141.2
-
1771.21
... More
Providing and laying of Prime coat using Emulsion bitumen (SS1 Type) at the rate of 7Kg/10 Sqm. over the WMM surface preparatory to another bituminous construction over it as per MORT&H Vth Revision 111, 112, 501, 502, 900
8564.8
-
69.66
... More
Providing and laying of tack coat using Emulsion bitumen (RS1 Type) at the rate of 2.50 Kg./ 10 Sqm. over the Primed surface preparatory to another bituminous construction over it as per MORT&H Vth Revision 111, 112, 501, 503, 900
8564.8
-
16.36
... More
Bituminous macadam of 50mm thickness which work shall consist of construction, in a single course of compacted crushed aggregates premixed with bituminous binder 60/70 grade bulk bitumen which will be procurred by the Contractor at the rate of 3.5 percent by weight of the total mix, to serve as base / binder couse, in accordance with the requirement of the specifications and in conformity with the drawing or as directed by the Engineer using approved CMP and paver finisher as per MORTH Vth Revision 111, 112, 501, 504, 900
428.3
-
7958.3
... More
Providing and laying 30 mm thick compacted Bituminous Concrete which shall consist of construction of a single course binder / wearing course on a previously prepared bituminous base to the requirements of the specification using 60/70 Grade bitumen (VG 30) as per MORT & H Vth Revision 111, 112, 501 507 900
256.94
-
10347.58
... More
Collection and supply of carted earth including excavation, removal and satisfactory disposal of all materials necessary for the construction of road way in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for making up low berms as per MORT&H Vth Revision 111, 112, 202, 301, 302, 303, 305, 900
2395.6
-
198.63
... More
RECONSTRUCTION OF BRIDGE at Km. 2/4
-
-
-
... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for DRESSING THE BED UPTO SILL LEVEL AND LAUNCHING APRON as per MORT&H Vth Revision 304.
777.9
-
96.6
... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOUNDATION OF RAFT, CUT OFF WALLS AND TOE WALLS as per MORT&H Vth Revision 304.
1519.6
-
352
... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for BED PROTECTION AND LAUNCHING APRON as per MORT&H Vth Revision 304.
178.2
-
247
... More
Plain Cement Concrete M10 (Nominal mix 1:3:6) using HBG graded metal 40mm and below ISS size including cost and conveyance of all materials to work site, but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for LEVELLING COURSE BELOW RCC RAFT & RCC PROTECTIVE APRON (Below Sill Level).
86
-
5063
... More
Vibrated Reinforced Cement Concrete M30 (Design Mix) using HBG graded metal 20mm and 12mm ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for FOUNDATION OF CUT OFF WALL (Below sill level) as per MORT&H Vth Revision 1500, 1600, 1700, 2200
97
-
13324
... More
Vibrated cement concrete M20 Grade (Nominal mix 1:1:.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for FOUNDATION OF TOE WALL FOR BED PROTECTION (RIGID APRON) AND LAUNCHING APRON (Below Sill level) as per MORT&H Vth Revision 1000, 1500, 1700, 2100
91.82
-
9372
... More
Filling inside the Raft with compacted M.Sand (Crushed stone sand) including cost and conveyance of M-sand to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete as per MORT&H 304.
836.6
-
1680
... More
Vibrated Reinforced Cement Concrete M30 (Design Mix) using HBG graded metal 20mm and 12mm ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for RCC RAFT as per MORT&H Vth Revision 1500, 1600, 1700, 2200
379
-
8130
... More
Vibrated cement concrete M20 Grade (Nominal mix 1:1:.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for SUBSTRUCTURE OF ABUTMENTS, WINGS & PIER (Above Sill level) as per MORT&H Vth Revision 1000, 1500, 1700, 2100
306
-
7665
... More
Providing and fixing 100mm dia PVC SEEPAGE PIPES of required length for abutment and returns including cost and conveyance of all materials to worksite, cost and labour for semisperical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., to drain of the backfill as per MORT&H Vth Revision 2700
90
-
169.1
... More
Vibrated Reinforced Cement Concrete M30 (Design Mix) using HBG graded metal 20mm and 12mm ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for BED BLOCK cum DIRT WALL OVER ABUTMENTS & PIERS as per MORT&H Vth Revision 1500, 1600, 1700, 2200
14
-
10489
... More
Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to worksite labour for fixing the same in correct position and all other incidental charges etc., complete. as per MORT&H 2600
44
-
100
... More
Vibrated Reinforced Cement Concrete M30 (Design Mix) using HBG graded metal 20mm and 12mm ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for RCC DECK SLAB, KERB & SAFETY KERB as per MORT&H Vth Revision 1500, 1600, 1700, 2300
208
-
11654
... More
PROVIDING AND FIXING 20mm thick PVC EXPANSION JOINTS including cost and conveyance of expansion joints, Shalimar pad and joint sealants and fixing them in position etc., complete. as per MORT&H Vth Revision 2600
59.7
-
580
... More
Supply and fixing of PVC water tight joint between cutt off wall and raft including cost and conveyance to the site and fixing in position including labour charges for fixing and including all other incidental charges complete and as directed by Engineer in charge
127
-
285.6
... More
Providing filter media behind the abutments and wings using 53mm - 5.60mm metal to 600 mm thick and well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance to worksite including all other incidental charges in accordance with the technical specification and as directed by the departmental officers etc., complete. as per MORT&H Vth Revision 2504 Cl.710.1.4 & Appendix-6 of IRC: 78-2014
52
-
1326
... More
Filling behind Abutments and Wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete for FILLING BEHIND ABUTMENT AND WINGS as per Cl.710.1.4 & Appendix-6 of IRC: 78-2014
89
-
337
... More
Supply and fabrication of Steel Grade Fe- 500 required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges as per standard specification etc., complete as per MORT&H Vth Revision 1000, 1600
41.29
-
83689
... More
Supply and fabrication of Steel Grade Fe-240 required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges as per standard specification etc., complete. as per MORT&H Vth Revision 1000, 1600
2.3
-
83689
... More
Vibrated cement concrete M15 Grade Nominal mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for BASE COURSE BELOW APPROACH SLAB as per MORT&H Vth Revision 1500, 1700, 2704
14
-
6376
... More
Vibrated Reinforced Cement Concrete M30 (Design Mix) using HBG graded metal 20mm and 12mm ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for APPROACH SLAB as per MORT&H Vth Revision 1500, 1700, 2704
19
-
8353
... More
Vibrated Cement Concrete M30 (Design mix) using HBG graded of size metal 20mm, 12mm & 6mm ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work cost of premoulded expansion joint and fixing the same in position and centering labour charges for compacting, curing, including all incidental charges etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab as per MORT&H Vth Revision 1500, 1600, 1700, 2702.2
330
-
671.57
... More
Vibrated Reinforced Cement Concrete M40 (Design Mix) using HBG graded metal 20mm and 12mm ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for CRASH BARRIER 1500, 1600, 1700, 2703.3
21.1
-
14562
... More
Vibrated cement concrete M15 Grade Nominal mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for CRASH BARRIER TYPE PARAPET as per MORT&H Vth Revision 1500, 1700, 2704
7
-
10320
... More
PROVIDING AND FIXING OF GI DRAINAGE SPOUTS OF 100mm dia as per G.O.I drawing No.SD/205 with gratting arrangements at top as shown in the drawing using 12mm X 25mm flats for gratting arrangements and 100mm dia drainage spouts projecting atleast 300mm beyond the bottom of the deck slab including cost and conveyance of all materials to site and fixing them in position as directed by the departmental officers etc., complete as per MORT&H Vth Revision 2705
10
-
2216
... More
Granite rough stone dry packing for Launching Apron the specified thickness for apron using good size granite rough stone with proper wedging with quarry spalls including cost and conveyance of all materials to worksite and stacking the same to departmental gauge for premeasurement including labour charges for placing the stones in correct position and all incidental charges etc., complete as per MORT&H Vth Revision 2500
209.47
-
1948.7
... More
Supply and fixing of High quality of PVC Duct pipes of 160 mm dia 4 Kg/cm2 including cost and conveyance of pipes to the sie and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges complete for providing utility services in footpaths.
176
-
399.8
... More
FORMATION OF APPROACH ROAD
-
-
-
... More
Collection and supply of carted earth with an average lead of 5 KM including excavation, removal and satisfactory disposal of all materials necessary for the construction of road way in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for formation of embankment with 95% compaction as per MORT&H Vth Revision 111, 112, 202, 301, 302, 303, 305, 900
3569
-
293.38
... More
Collection and supply of carted earth with an average lead of 5 KM including excavation, removal and satisfactory disposal of all materials necessary for the construction of road way in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for formation of embankment with 97% compaction as per MORT&H Vth Revision 111, 112, 202, 301, 302, 303, 305, 900
2170
-
337.83
... More
Providing and laying granular Sub-base as per table No.400-1/400-2 and Grading V of MORT&H Revision V with and any other Granular Material or a combination those of for required thick to give a CBR of 30 on prepared sub-grade in accordance with the requirements of the specification as per MORT&H Vth 111, 112, 401, 900
224
-
1536.4
... More
Providing and laying, spreading and compacting graded stone aggreegate to Wet mix macadam specification including pre-mixing the materials with water at OMC in base mix plant (pug mill ) carriage of mixed materials by tipper to site and laying in uniform layers in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MORT&H Vth Revision 111, 112, 406, 900
281
-
1771.21
... More
Providing and laying of Prime coat using Emulsion bitumen at the rate of 7Kg/10 Sqm. over the WMM surface preparatory to another bituminous construction over it as per MORT&H Vth Revision 111, 112, 501, 502, 900
1120
-
69.66
... More
Providing and laying of tack coat using Emulsion bitumen at the rate of 2.50 /10Sqm over the Prime coat surface preparatory to another bituminous construction over it as per MORT&H Vth Revision 111, 112, 501, 503, 900
1120
-
16.36
... More
Bituminous macadam of 50mm thickness which work shall consist of construction, in a single course of compacted crushed aggregates premixed with bituminous binder 60/70 grade bulk bitumen which will be procurred by the Contractor at the rate of 3.5 percent by weight of the total mix, to serve as base / binder couse, in accordance with the requirement of the specifications and in conformity with the drawing or as directed by the Engineer using approved CMP and paver finisher as per MORT&H Vth 111, 112, 501, 504, 900
57
-
7958.3
... More
Providing and laying 30mm thick compacted Bituminous Concrete which shall consist of construction of a single course binder / wearing course on a previously prepared bituminous base to the requirements of the specification using 60/70 Grade bitumen using approved CMP and paver finisher. as per MORT&H Vth Revision 111, 112, 501, 507, 509
34
-
10347.58
... More
FOR CONSTRUCTION OF PIPE CULVERT at Km. 0/2, 0/4, 0/8, 1/2 (I), 1/2 (II), 1/4, 1/8, 2/0 & 2/2
-
-
-
... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges such as bailing out water, sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for as per MORTH Vth Revision 304.
400.02
-
193.2
... More
Vibrated cement concrete M20 Grade (Nominal mix 1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for (Below Sill Level). as per MORTH Vth Revision 1000, 1500, 1700, 2100.
85.86
-
5836.56
... More
Vibrated cement concrete M20 Grade (Nominal mix 1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for (Above Sill Level). as per MORTH Vth Revision 1000, 1500, 1700, 2100.
126.45
-
8723.56
... More
Supply of NP3 Class 1000mm dia R.C.C Pipes to suit the respective diametre of pipes confirming to IS Specifications 458 to various diametre of pipes including cost of Pipes inclusive of all taxes, loading, unloading conveyance and delivery at road site as directed by the departmental officers, including all other incidental charges etc, complete including Hoisting and Fixing the pipe in position as per MORTH Vth 2900
90
-
4034
... More
Refilling the excavated earth complying with the standard specification for filling in the foundation trench including labour charges etc., complete as per MORT&H Vth Revision 2904, 2907.
120.45
-
33.6
... More
CONSTRUCTION OF RETAINING WALL FOR BRIDGE
-
-
-
... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOUNDATION OF PCC RETAINING WALL as per MORT H Vth Revision 304
241
-
193.2
... More
Plain Cement Concrete M15 (Nominal mix 1:2:4) using HBG graded metal 40mm and below ISS size including cost and conveyance of all materials to work site, but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for BASE SLAB OF PCC RETAINING WALL
60.12
-
5737
... More
Vibrated cement concrete M20 Grade Nominal mix (1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for STEM OF RETAINING WALLS (Below Sill level) as per MORTH V 1000, 1500, 1700, 2100.
127.55
-
6967.01
... More
Vibrated cement concrete M20 Grade Nominal mix (1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for STEM OF RETAINING WALLS (Above Sill level) as per MORTH V 1000, 1500, 1700, 2100.
237.26
-
8425.88
... More
Providing and fixing 100mm dia PVC SEEPAGE PIPES of required length for abutment and returns including cost and conveyance of all materials to worksite, cost and labour for semisperical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., to drain of the backfill as per MORTH V 2700
84
-
169.1
... More
CONSTRUCTION OF PCC RETAINING WALL FOR ROAD
-
-
-
... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOUNDATION OF PCC RETAINING WALL as per MORT H Vth Revision 304
476
-
193.2
... More
Plain Cement Concrete M15 (Nominal mix 1:2:4) using HBG graded metal 40mm and below ISS size including cost and conveyance of all materials to work site, but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for BASE SLAB OF PCC RETAINING WALL
118.8
-
5726
... More
Vibrated cement concrete M20 Grade Nominal mix (1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for STEM OF RETAINING WALLS (Below Sill level) as per MORTH V 1000, 1500, 1700, 2100.
244.62
-
6984
... More
Vibrated cement concrete M20 Grade Nominal mix (1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for STEM OF RETAINING WALLS (Above Sill level) as per MORTH V 1000, 1500, 1700, 2100.
376.7
-
8347
... More
Providing and fixing 100mm dia PVC SEEPAGE PIPES of required length for abutment and returns including cost and conveyance of all materials to worksite, cost and labour for semisperical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., to drain of the backfill as per MORTH V 2700
180
-
169.1
... More
Refilling the Excavated earth complying with the standard specification for filling in the foundation trench including labour charges etc complete as per MORTH V 304
682.65
-
33.6
... More
Calculation of SubTotal, GST and Total carried out by system automatically
-
-
-
... More
Sub Total Amount for above all items (excluding GST)
1
-
50933915.28
... More
GST 12% for above SubTotal Amount
1
-
6112069.83
... More
Total in Figures (SubTotal + GST)
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements