National Bank For Agriculture And Rural Development Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Eprocure
Opening Date20 Jun 2020
Closing Date15 Jul 2020
Tender Amount₹ 5,63,10,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road.C

1656

-

4.84

... More
Road.E

876

-

4.84

... More
Road.G

756

-

4.84

... More
Construction of granular sub- base by providing close graded Material, mixing in a mechanical mix plantat OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (Specification Number as per MORTH Rev.V 111,112,401,900).

-

-

-

... More
Road.A

1384

-

2074.09

... More
Road.B

589

-

2074.09

... More
Road.C

949

-

2065.29

... More
Road.D

355

-

2052.09

... More
Road.E

274

-

2056.49

... More
Road.F

296

-

2047.69

... More
Road.G

355

-

2060.89

... More
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including pre mixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 (Specification Number as per MORTH Rev.V 111,112,406,900).

-

-

-

... More
Road.A

2307

-

2279.15

... More
Road.B

1472

-

2279.15

... More
Road.C

1898

-

2279.15

... More
Road.D

591

-

2279.15

... More
Road.E

685

-

2279.15

... More
Road.F

493

-

2279.15

... More
Road.G

591

-

2279.15

... More
Providing and laying of prime coat over WBM/WMM surface using 7 kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc, complete as per clause 502 of MORTH Rev.5 .(Specification Number as per MORTH Rev.V 111,112,502,900)

-

-

-

... More
Road.A

9225

-

53.5

... More
Road.B

5888

-

53.5

... More
Road.C

7590

-

53.5

... More
Road.D

2363

-

53.5

... More
Road.E

2738

-

53.5

... More
Road.F

1969

-

53.5

... More
Road.G

2363

-

53.5

... More
Providing and laying Tack Coat over WBM/WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion(RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5..(Specification Number as per MORTH Rev.V 111,112,503,900).

-

-

-

... More
Road.A

9225

-

10.96

... More
Road.B

5888

-

10.96

... More
Road.C

7590

-

10.96

... More
Road.D

2363

-

10.96

... More
Road.E

2738

-

10.96

... More
Road.F

1969

-

10.96

... More
Road.G

2363

-

10.96

... More
Providing and laying 50mm consolidated thick bituminous macadam using 0.2cum of 26.5-13.2mm, 0.43cum of 13.22-2.36mm and 0.08 cum of 2.36mm and blow size IRC metal with 37 kg of VG30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross section and consolidated by 8-10 tone vibrator roller to the require density etc including labour for attending the paver to site, etc including hire charges and fuel charges for 20-30 ton CMP with bitumen boiler, tipper trucks, paver finisher / vibrator roller and all other tools and plants required including fuel and all other incidental charges etc complete as per specification using CMP as per clause 504 of MORTH.Rev.5.(Specification Number as per MORTH Rev.V 111,112,505,900).

-

-

-

... More
Road.A

462

-

6057.2

... More
Road.B

295

-

6057.2

... More
Road.C

380

-

6057.2

... More
Road.D

119

-

6057.2

... More
Road.E

137

-

6057.2

... More
Road.F

99

-

6057.2

... More
Road.G

119

-

6057.2

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 30mm with mechanical paver finisher to the specified grades and cross sections and consolidatedby8-10tonne Vibratory/ Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/9m paver finisher, Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.(Specification Number as per MORTH Rev.V 111,112,507,900).

-

-

-

... More
Road.A

277

-

7374.55

... More
Road.B

177

-

7374.55

... More
Road.C

228

-

7374.55

... More
Road.D

71

-

7374.55

... More
Road.E

83

-

7374.55

... More
Road.F

60

-

7374.55

... More
Road.G

71

-

7374.55

... More
Carted earth with lead of 2/5 km including const of Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank with initial lead and lift and all other incidental charges including hire charges for tools and plant for cutting road edge to required depth as per SS20B.complete as per SS20B.complete as per MORT&H Specificaton No.304 & 305

-

-

-

... More
Road.A

2362

-

133

... More
Road.B

1351

-

165

... More
Road.C

1570

-

165

... More
Road.D

192

-

165

... More
Road.E

314

-

165

... More
Road.F

480

-

165

... More
Road.G

605

-

165

... More
Providing RCC M15 grade precast HM stone of standard design as per IRC 8-1980 and fixing in position including painting and printing etc complete (as per MORT&H specification No.804).

-

-

-

... More
Road.A

10

-

256

... More
Road.B

6

-

256

... More
Road.C

5

-

256

... More
Road.D

3

-

256

... More
Road.E

3

-

256

... More
Road.F

2

-

256

... More
Road.G

3

-

256

... More
Providing RCC M15 grade precast KM stone of standard design as per IRC 8-1980 and fixing in position including painting and printing etc complete (as per MORT&H specification No.804).

-

-

-

... More
Road.A

2

-

906

... More
Road.B

1

-

906

... More
Road.C

1

-

906

... More
Providing Scheme Board as per SI NO.3(2) BOE 2019 – 2020.

-

-

-

... More
Road.A

1

-

9057

... More
Road.B

1

-

9057

... More
Road.C

1

-

9057

... More
Road.D

1

-

9057

... More
Road.E

1

-

9057

... More
Road.F

1

-

9057

... More
Road.G

1

-

9057

... More
i) Sub Work

-

-

-

... More
Dismantling the existing Brick Masonry in Cement mortar walls upto 3m hight in the existing culvert and clearing away from the work site and carefully stacking the usefull materials for re-use on the road side as directed by the departmental officers including all labour and incidental charges etc., complete as per MORT&H Specificaton No.202

-

-

-

... More
A) Reconstruction of Single row RCC pipe culvert at km 0/4 and Construction of Single row RCC pipe culvert at km 1/2 of Kannapalayam to Sendrambakkam Road km 0/0 - 2/460

-

-

-

... More
At Ch : 0/4 (Reconstruction Single row pipe culvert)

10

-

193

... More
Earth work excavation in all classes of soils except soft disintegrated rock and hard roack and depositing on bank as per SS 20 B with all leads and lifts and all other incidental charges such as bailing out of water shoring strutting walling for levelling ground and their subsequent removal of all logs stump grubs and other deleterious matter and obstructions ,trimming bottom of excavation back filling and cleaning the site and disposal of all other surplus materilas etc., complete as per standard specification for Foundation of Body wall of Pipe culvert as per MORT&H Specificaton No.304 & 305

-

-

-

... More
A) Reconstruction of Single row RCC pipe culvert at km 0/4 and Construction of Single row RCC pipe culvert at km 1/2 of Kannapalayam to Sendrambakkam Road km 0/0 - 2/460

-

-

-

... More
At Ch : 0/4 (Reconstruction Single row pipe culvert)

35

-

213

... More
At Ch : 1/2 (New Single row pipe culvert)

50

-

213

... More
B) Construction of Single row RCC pipe culvert at km 0/2, km 0/4, km 0/6 and km 1/2 of Kannabalayam BG Road km 0/0 - 1/570

-

-

-

... More
At Ch : 0/2, 0/4 & 0/6 (New Single row pipe culvert)

150

-

213

... More
At Ch : 1/2 (New Single row pipe culvert)

50

-

213

... More
D) Construction of Single row RCC pipe culvert at km 0/6 of Grantlyon Anbu Illam Link Kanagaduraga Nagar Road km 0/0 - 0/630

-

-

-

... More
At Ch : 0/6 (New Construction )

50

-

213

... More
E) Construction of Single row RCC pipe culvert at km 0/2 and km 0/4 of Alinjivakkam Selva Vinayagar Road Link to Kanaga Durga Nagar km 0/0 - 0/730

-

-

-

... More
At Ch : 0/2 & 0/4 (New Construction)

100

-

213

... More
G) Construction of Single row RCC pipe culvert at km 0/2 of Vilangadupakkam Komathiamman Nagar Road km 0/0 - 0/630

-

-

-

... More
At Ch : 0/2 (New Construction )

50

-

213

... More
Stone Dust filling including cost and conveyance of Stone dust to worksite including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting, tamping, ramming under optimum moisture content to obtain the maximum density and all other incidental charges etc. complete as per standard specification as per MORT&H Specificaton No.1000

-

-

-

... More
A) Reconstruction of Single row RCC pipe culvert at km 0/4 and Construction of Single row RCC pipe culvert at km 1/2 of Kannapalayam to Sendrambakkam Road km 0/0 - 2/460

-

-

-

... More
At Ch : 0/4 (Reconstruction Single row pipe culvert)

12

-

512

... More
At Ch : 1/2 (New Single row pipe culvert)

12

-

516

... More
B) Construction of Single row RCC pipe culvert at km 0/2, km 0/4, km 0/6 and km 1/2 of Kannabalayam BG Road km 0/0 - 1/570

-

-

-

... More
At Ch : 0/2, 0/4 & 0/6 (New Single row pipe culvert)

36

-

516

... More
At Ch : 1/2 (New Single row pipe culvert)

12

-

521

... More
D) Construction of Single row RCC pipe culvert at km 0/6 of Grantlyon Anbu Illam Link Kanagaduraga Nagar Road km 0/0 - 0/630

-

-

-

... More
At Ch : 0/6 (New Construction )

12

-

503

... More
E) Construction of Single row RCC pipe culvert at km 0/2 and km 0/4 of Alinjivakkam Selva Vinayagar Road Link to Kanaga Durga Nagar km 0/0 - 0/730

-

-

-

... More
At Ch : 0/2 & 0/4 (New Construction)

24

-

503

... More
G) Construction of Single row RCC pipe culvert at km 0/2 of Vilangadupakkam Komathiamman Nagar Road km 0/0 - 0/630

-

-

-

... More
At Ch : 0/2 (New Construction )

12

-

512

... More
Vibrated cement concrete of grade M15 Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for LC for Foundation of Body wall of pipe culvert as per MORT&H Specificaton No.1000, 1500, 1700, 2200, 2300

-

-

-

... More
A) Reconstruction of Single row RCC pipe culvert at km 0/4 and Construction of Single row RCC pipe culvert at km 1/2 of Kannapalayam to Sendrambakkam Road km 0/0 - 2/460

-

-

-

... More
At Ch : 0/4 (Reconstruction Single row pipe culvert)

7

-

5865

... More
At Ch : 1/2 (New Single row pipe culvert)

7

-

5870

... More
B) Construction of Single row RCC pipe culvert at km 0/2, km 0/4, km 0/6 and km 1/2 of Kannabalayam BG Road km 0/0 - 1/570

-

-

-

... More
At Ch : 0/2, 0/4 & 0/6 (New Single row pipe culvert)

19

-

5870

... More
At Ch : 1/2 (New Single row pipe culvert)

7

-

5880

... More
D) Construction of Single row RCC pipe culvert at km 0/6 of Grantlyon Anbu Illam Link Kanagaduraga Nagar Road km 0/0 - 0/630

-

-

-

... More
At Ch : 0/6 (New Construction )

7

-

5841

... More
E) Construction of Single row RCC pipe culvert at km 0/2 and km 0/4 of Alinjivakkam Selva Vinayagar Road Link to Kanaga Durga Nagar km 0/0 - 0/730

-

-

-

... More
At Ch : 0/2 & 0/4 (New Construction)

13

-

5841

... More
G) Construction of Single row RCC pipe culvert at km 0/2 of Vilangadupakkam Komathiamman Nagar Road km 0/0 - 0/630

-

-

-

... More
At Ch : 0/2 (New Construction )

7

-

5861

... More
Vibrated cement concrete of grade M15 Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for Foundation of Body wall of pipe culvert as per MORT&H Specificaton No.1000, 1500, 1700, 2200, 2300

-

-

-

... More
A) Reconstruction of Single row RCC pipe culvert at km 0/4 and Construction of Single row RCC pipe culvert at km 1/2 of Kannapalayam to Sendrambakkam Road km 0/0 - 2/460

-

-

-

... More
At Ch : 0/4 (Reconstruction Single row pipe culvert)

14

-

7260

... More
At Ch : 1/2 (New Single row pipe culvert)

14

-

7270

... More
B) Construction of Single row RCC pipe culvert at km 0/2, km 0/4, km 0/6 and km 1/2 of Kannabalayam BG Road km 0/0 - 1/570

-

-

-

... More
At Ch : 0/2, 0/4 & 0/6 (New Single row pipe culvert)

42

-

7270

... More
At Ch : 1/2 (New Single row pipe culvert)

14

-

7280

... More
D) Construction of Single row RCC pipe culvert at km 0/6 of Grantlyon Anbu Illam Link Kanagaduraga Nagar Road km 0/0 - 0/630

-

-

-

... More
At Ch : 0/6 (New Construction )

14

-

7241

... More
E) Construction of Single row RCC pipe culvert at km 0/2 and km 0/4 of Alinjivakkam Selva Vinayagar Road Link to Kanaga Durga Nagar km 0/0 - 0/730

-

-

-

... More
At Ch : 0/2 & 0/4 (New Construction)

28

-

7241

... More
G) Construction of Single row RCC pipe culvert at km 0/2 of Vilangadupakkam Komathiamman Nagar Road km 0/0 - 0/630

-

-

-

... More
At Ch : 0/2 (New Construction )

14

-

7260

... More
Vibrated cement concrete of grade M15 Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for Body wall and parapet of pipe culvert as per MORT&H Specificaton No.1000, 1500, 1700, 2200, 2300

-

-

-

... More
A) Reconstruction of Single row RCC pipe culvert at km 0/4 and Construction of Single row RCC pipe culvert at km 1/2 of Kannapalayam to Sendrambakkam Road km 0/0 - 2/460

-

-

-

... More
At Ch : 0/4 (Reconstruction Single row pipe culvert)

15

-

8527

... More
At Ch : 1/2 (New Single row pipe culvert)

15

-

8536

... More
B) Construction of Single row RCC pipe culvert at km 0/2, km 0/4, km 0/6 and km 1/2 of Kannabalayam BG Road km 0/0 - 1/570

-

-

-

... More
At Ch : 0/2, 0/4 & 0/6 (New Single row pipe culvert)

44

-

8536

... More
At Ch : 1/2 (New Single row pipe culvert)

15

-

8546

... More
D) Construction of Single row RCC pipe culvert at km 0/6 of Grantlyon Anbu Illam Link Kanagaduraga Nagar Road km 0/0 - 0/630

-

-

-

... More
At Ch : 0/6 (New Construction )

15

-

8508

... More
E) Construction of Single row RCC pipe culvert at km 0/2 and km 0/4 of Alinjivakkam Selva Vinayagar Road Link to Kanaga Durga Nagar km 0/0 - 0/730

-

-

-

... More
At Ch : 0/2 & 0/4 (New Construction)

30

-

8507

... More
G) Construction of Single row RCC pipe culvert at km 0/2 of Vilangadupakkam Komathiamman Nagar Road km 0/0 - 0/630

-

-

-

... More
At Ch : 0/2 (New Construction )

15

-

8527

... More
Supply of 1000mm dia RCC NP3 class pipes confirming to IS 458 specification as directed by the departmental officers including cost and conveyance of pipes to the worksite and all other incidental charges etc., complete as per standard specification as per MORT&H Specificaton No.2600

-

-

-

... More
A) Reconstruction of Single row RCC pipe culvert at km 0/4 and Construction of Single row RCC pipe culvert at km 1/2 of Kannapalayam to Sendrambakkam Road km 0/0 - 2/460

-

-

-

... More
At Ch : 0/4 (Reconstruction Single row pipe culvert)

7.5

-

3700

... More
At Ch : 1/2 (New Single row pipe culvert)

7.5

-

3700

... More
B) Construction of Single row RCC pipe culvert at km 0/2, km 0/4, km 0/6 and km 1/2 of Kannabalayam BG Road km 0/0 - 1/570

-

-

-

... More
At Ch : 0/2, 0/4 & 0/6 (New Single row pipe culvert)

22.5

-

3700

... More
At Ch : 1/2 (New Single row pipe culvert)

7.5

-

3700

... More
D) Construction of Single row RCC pipe culvert at km 0/6 of Grantlyon Anbu Illam Link Kanagaduraga Nagar Road km 0/0 - 0/630

-

-

-

... More
At Ch : 0/6 (New Construction )

7.5

-

3700

... More
E) Construction of Single row RCC pipe culvert at km 0/2 and km 0/4 of Alinjivakkam Selva Vinayagar Road Link to Kanaga Durga Nagar km 0/0 - 0/730

-

-

-

... More
At Ch : 0/2 & 0/4 (New Construction)

15

-

3700

... More
G) Construction of Single row RCC pipe culvert at km 0/2 of Vilangadupakkam Komathiamman Nagar Road km 0/0 - 0/630

-

-

-

... More
At Ch : 0/2 (New Construction )

7.5

-

3700

... More
Laying and fixing 1000mm dia RCC NP3 pipe in position excluding cost of pipes but including conveyance to work spot and handling charges on both sides including labour charges for hoisting and placing the pipes in position and packing the joints and all other incidental charges etc., complete as per standard specification as per MORT&H Specificaton No.2600

-

-

-

... More
A) Reconstruction of Single row RCC pipe culvert at km 0/4 and Construction of Single row RCC pipe culvert at km 1/2 of Kannapalayam to Sendrambakkam Road km 0/0 - 2/460

-

-

-

... More
At Ch : 0/4 (Reconstruction Single row pipe culvert)

7.5

-

238

... More
At Ch : 1/2 (New Single row pipe culvert)

7.5

-

238

... More
B) Construction of Single row RCC pipe culvert at km 0/2, km 0/4, km 0/6 and km 1/2 of Kannabalayam BG Road km 0/0 - 1/570

-

-

-

... More
At Ch : 0/2, 0/4 & 0/6 (New Single row pipe culvert)

22.5

-

238

... More
At Ch : 1/2 (New Single row pipe culvert)

7.5

-

238

... More
D) Construction of Single row RCC pipe culvert at km 0/6 of Grantlyon Anbu Illam Link Kanagaduraga Nagar Road km 0/0 - 0/630

-

-

-

... More
At Ch : 0/6 (New Construction )

7.5

-

238

... More
E) Construction of Single row RCC pipe culvert at km 0/2 and km 0/4 of Alinjivakkam Selva Vinayagar Road Link to Kanaga Durga Nagar km 0/0 - 0/730

-

-

-

... More
At Ch : 0/2 & 0/4 (New Construction)

15

-

238

... More
G) Construction of Single row RCC pipe culvert at km 0/2 of Vilangadupakkam Komathiamman Nagar Road km 0/0 - 0/630

-

-

-

... More
At Ch : 0/2 (New Construction )

7.5

-

238

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items (excluding GST)

1

-

50274936.5

... More
GST 12% for above SubTotal Amount

1

-

6032992.38

... More
Total in Figures (SubTotal + GST)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.