National Bank For Agriculture And Rural Development Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Eprocure
Opening Date5 Nov 2019
Closing Date29 Nov 2019
Tender Amount₹ 7,07,07,623 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

10368

-

3.6

... More
Earthwork excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer using carted earth with an average lead of 5 km for 97% compaction

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

157.2

-

141.09

... More
Picking the existing BT surface as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc., complete as per standard specifications as per MORTH Rev. V

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

3721.75

-

12.99

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

3671

-

12.99

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

5153.25

-

12.99

... More
Granular Sub-base with Graded Material (Table:-400-1)-Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401)-for Grading V Material (Specification Number as per MORTH Rev.V 111,112,401,900).

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

568.12

-

1464.88

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

7.43

-

1451.68

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

93.26

-

1434.08

... More
Wet Mix Macadam (Table400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406) (Specification Number as per MORTH Rev.V 111,112,406,900).

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

2805.38

-

1587.01

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

2765.62

-

1587.01

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

4020.4

-

1587.01

... More
Prime coat (Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502) - over WMM/ WBM.(Specification Number as per MORTH Rev.V 111,112,502,900).

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

11221.5

-

62.7

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

11062.5

-

62.7

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

16081.5

-

62.71

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over granular surfaces treated with primer.(Specification Number as per MORTH Rev.V 111,112,503,900).

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

11221.5

-

12.43

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

11062.5

-

12.43

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

16081.5

-

12.43

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom as per clause 503 - Specification Number as per MORTH Rev.V 111,112,503,900).

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

50.16

-

14.12

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

569.75

-

14.13

... More
Bituminous Macadam - Providing and laying bituminous macadam 50mm compacted thick with Central Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 of MORTH Specification - Grading II

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

561.08

-

6335.64

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

515.62

-

6335.64

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

804.09

-

6335.64

... More
Bituminous Concrete 30mm thick (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading,premixed with bituminous binder (Viscosity Grade - 30) at percentage specified by JMF of mix and filer, transporting the hot mix to work site, laying wih a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No.507 complete in all respects) - Grading II.(Specification Number as per MORTH Rev.V 111,112,507,900).

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

336.64

-

8269.08

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

331.87

-

8269.08

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

482.44

-

8269.08

... More
Bituminous Concrete 50mm thick (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading,premixed with bituminous binder (Viscosity Grade - 30) at percentage specified by JMF of mix and filer, transporting the hot mix to work site, laying wih a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No.507 complete in all respects) - Grading I.(Specification Number as per MORTH Rev.V 111,112,507,900).

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

2.51

-

7977.9

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

28.5

-

7977.9

... More
Earthwork for subgrade, shoulders and back fills in accordance with the specifications, lines, grades and cross sections as shown in the drawings or as indicated by the Engineer as per SS20B for 97% Compaction for making up Berms using Carted Earth with an average lead of 1Km MORTH Rev. V

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

4238.6

-

141.09

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

3626.86

-

141.09

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

5073.87

-

141.09

... More
Providing RCC M 15 grade precast KM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

3

-

906

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

3

-

906

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

4

-

906

... More
Providing RCC M 15 grade precast HM stone of standard design as per IRC 8 - 1980 and fixing in position including painting, printing etc., complete

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

12

-

256

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

12

-

256

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

18

-

256

... More
Sub estimate for Pipe Culvert

-

-

-

... More
Dismantling the existing RR masonry and Salvaging and removal and disposal of resulting materials and back filling the resulting trenches etc., As per PWD SoR 2019 - 2020

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

48.64

-

168

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

39.66

-

168

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

79.62

-

168

... More
Dismantling the existing cut stone slab and Salvaging and removal and disposal of resulting materials and back filling the resulting trenches etc., As per PWD SoR 2019 - 2020

-

-

-

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

3.02

-

700

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

3.84

-

700

... More
Dismantling the existing RCC slab and Salvaging and removal and disposal of resulting materials and back filling the resulting trenches etc., As per PWD SoR 2019 - 2020

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

13.5

-

4390

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

3.02

-

4390

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

4.73

-

4390

... More
Earthwork excavationin all classes of soils depositing on bank, with all leads and lifts as per SS 20B, including cost of all labour, equipments and all other incidental charges such as shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifation for Foundation for Pipe culvert

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

126.12

-

146.2

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

96.96

-

146.2

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

124.41

-

146.2

... More
Earthwork excavationin Soft disintegrated rock / Kankar depositing on bank, with all leads and lifts as per SS 20B, including cost of all labour, equipments and all other incidental charges such as shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifation for Foundation for Pipe culvert

-

-

-

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

42.04

-

217.8

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

84.08

-

217.8

... More
Plain Cement concrete 1:2:4 (Nominal Mix) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site, including cost of cement at site and including soft water, labour charges for mixing, transporting, laying, curing and compacting concrete, hire charges for tools and plants and all other incidental charges etc., complete as per standard specification for FOUNDATION for Pipe culvert.

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

14.55

-

5065.11

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

16.04

-

5042.79

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

24.06

-

4998.05

... More
Vibrated Cement Concrete of 1:2:4 (Nominal Mix) using 40 mm ISS size HBG graded Metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charge for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for BODY WALL for Pipe culvert (below sill)

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

77.85

-

6188.99

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

87.8

-

6191.78

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

131.69

-

6148.71

... More
Vibrated Cement Concrete of 1:2:4 (Nominal Mix) using 40 mm ISS size HBG graded Metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charge for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for BODY WALL for Pipe culvert (above sill)

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

70.26

-

6992.37

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

79.19

-

7002.16

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

118.12

-

6969.45

... More
Supply and Hoisting of NP3 class RCC (1000mm dia) Pipes supplied by the Contractor at his own cost and risk specified below confirming to IS 458 / 2003 including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the departmental officers etc., complete, as per MORTH Specification.

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

90

-

3897

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

80

-

3897

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

120

-

3897

... More
Gravel Filling in between body wall with clean good gritty gravel including cost and conveyance to the site including labour charges for filling in layers, watering, tamping under optimum moisture content to get the maximum density and all other incidental charges etc. complete. for Pipe culvert

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

163.23

-

337.01

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

142.93

-

315.88

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

214.39

-

268.53

... More
Sub estimate for Construction of drainage

-

-

-

... More
Earthwork excavationin all classes of soils depositing on bank, with all leads and lifts as per SS 20B, including cost of all labour, equipments and all other incidental charges such as shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifation for Foundation for Drainage

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

15.6

-

146.2

... More
Plain Cement concrete 1:2:4 (Nominal Mix) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site, including cost of cement at site and including soft water, labour charges for mixing, transporting, laying, curing and compacting concrete, hire charges for tools and plants and all other incidental charges etc., complete as per standard specification for FOUNDATION for Drainage

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

3.6

-

5075.28

... More
Vibrated Cement Concrete of 1:2:4 (Nominal Mix) using 40 mm ISS size HBG graded Metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charge for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for BODY WALL for Drainage

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

5

-

5713.34

... More
Supply and Fabrication of steel at site Grade Fe-500 at site required for all RCC items of works involved in the schedule including cost of steel at site, cost of fabrication, labour charges for cleaning the bars, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of space bars, cover blocks and all other incidental charges etc., complete, for Drainage

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

0.28

-

69849.37

... More
Vibrated Cement Concrete of M20 (Nominal Mix) using 20 mm ISS size HBG graded Metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, working at depths, hire charge for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for Cover slab

-

-

-

... More
Upgradation of Koppampatti - Veppankulam road km 0/0-3/0

3.6

-

7371.37

... More
Sub estimate for Piped causeway

-

-

-

... More
Dismantling the existing Plain cement concrete and Salvaging and removal and disposal of resulting materials and back filling the resulting trenches etc., As per PWD SoR 2019 - 2020

-

-

-

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

56.25

-

289

... More
Dismantling the existing RR masonry and Salvaging and removal and disposal of resulting materials and back filling the resulting trenches etc., As per PWD SoR 2019 - 2020

-

-

-

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

22.5

-

168

... More
Earthwork excavation in Soft disintegrated rock / Kankar depositing on bank with all leads and lifts as per SS20B including cost of all labour, equipments and all incidental charges trimming bottom of excavation back filling, clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Providing Paver Block

-

-

-

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

294

-

217.8

... More
Vibrated Cement Concrete M15 (Nominal Mix) 1:2:4 using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site, including cost of cement at site, including cost of form work, soft water labour charges for mixing, transporting, laying and curing, concrete hire charges for all tools and plants and complete as per standard specification for footing of Piped causeway

-

-

-

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

73.5

-

4393.85

... More
Vibrated Cement Concrete M15 (Nominal Mix) 1:2:4 using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site, including cost of cement at site, including cost of form work, soft water labour charges for mixing, transporting, laying and curing, concrete hire charges for all tools and plants and complete as per standard specification for Piped causeway below sill

-

-

-

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

139.5

-

5955.39

... More
Vibrated Cement Concrete M15 (Nominal Mix) 1:2:4 using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site, including cost of cement at site, including cost of form work, soft water labour charges for mixing, transporting, laying and curing, concrete hire charges for all tools and plants and complete as per standard specification for Piped causeway above sill

-

-

-

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

80.93

-

7406.81

... More
Filling in between piped causeway as per Appendix 6 of IRC: 78-2014 with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under OMC to get the maximum density, including watering with all leads and lifts for water and all other incidental charges etc., complete.

-

-

-

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

235.63

-

306.9

... More
Plain Cement Concrete of M10 using 40 mm ISS size HBG Metal including cost and conveyance of all materials to site and including cost of cement at site, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charge for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for Piped causeway

-

-

-

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

49.5

-

4387.85

... More
Vibrated Cement Concrete M15 (Nominal Mix) 1:2:4 using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site, including cost of cement at site, including cost of form work, soft water labour charges for mixing, transporting, laying and curing, concrete hire charges for all tools and plants and complete as per standard specification Base course for Piped causeway

-

-

-

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

49.5

-

5090.4

... More
Vibrated Cement Concrete M30 using 25mm, 13.2mm and 6 mm IRC size HBG graded metal including cost and conveyance of all materials to site, including cost of cement at site, including cost of form work, soft water labour charges for mixing, transporting, laying and curing, concrete hire charges for all tools and plants and complete as per standard specification for Wearing coat for Piped causeway

-

-

-

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

330

-

572.18

... More
Supply and Hoisting of NP3 class RCC (1000mm dia) Pipes supplied by the Contractor at his own cost and risk specified below confirming to IS 458 / 2003 including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the departmental officers etc., complete, as per MORTH Specification.

-

-

-

... More
Upgradation of Puthupatti - Veppankulam road km 0/0-3/0

187.5

-

3897

... More
Sub estimate for Retaining Wall

-

-

-

... More
Earthwork excavationin all classes of soils depositing on bank, with all leads and lifts as per SS 20B, including cost of all labour, equipments and all other incidental charges such as shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifation for Foundation for Toe Wall

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

135

-

146.2

... More
Vibrated Cement concrete 1:2:4 (Nominal Mix) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site, including cost of cement at site and including soft water, labour charges for mixing, transporting, laying, curing and compacting concrete, hire charges for tools and plants and all other incidental charges etc., complete as per standard specification for FOUNDATION for Toe Wall

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

40.5

-

5046.41

... More
Vibrated Cement Concrete of 1:2:4 (Nominal Mix) using 40 mm ISS size HBG graded Metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charge for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for Toe Wall (below sill)

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

60.9

-

5952.87

... More
Vibrated Cement Concrete of 1:2:4 (Nominal Mix) using 40 mm ISS size HBG graded Metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charge for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for Toe Wall (above sill)

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

105.5

-

7030.54

... More
Providing and fixing SEEPAGE PIPES of 110mm dia PVC pipes of required length for Retaining Wall including cost and conveyance of all materials to worksite, cost and labour for 900mm dia. Semi-spherical back fill arrangements with 110mm size broken granite chips at the periphery and labour charges for fixing etc., to drain of the Backfill in the Retaining Wall

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

48

-

172.8

... More
Sub estimate for Minor Bridge

-

-

-

... More
Dismantling the existing RR masonry and Salvaging and removal and disposal of resulting materials and back filling the resulting trenches etc., As per PWD SoR 2019 - 2020

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

66.15

-

168

... More
Dismantling the existing Plain cement concrete and Salvaging and removal and disposal of resulting materials and back filling the resulting trenches etc., As per PWD SoR 2019 - 2020

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

78.75

-

289

... More
Earthwork excavation in all classes of soil and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UPTO SILL LEVEL

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

205.58

-

73.1

... More
Earthwork excavation in Soft disintegrated rock / Kankar depositing on bank with all leads and lifts as per SS20B and all over incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions,trimming bottom of excavation, backfilling and clearing the site and disposal of all surplus materials etc. complete as per relevant standards specification for FOUNDATION OF ABUTMENTS, WINGS AND PIERS

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

494.7

-

375.8

... More
Plain Cement Concrete of M10 using 40 mm ISS size HBG Metal including cost and conveyance of all materials to site and including cost of cement at site, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charge for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for LEVELLING COURSE OF ABUTMENT, PIERS AND WINGS

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

28.27

-

4493.39

... More
Vibrated Cement Concrete of M20 (Nominal Mix) using 40 mm ISS size HBG graded Metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, working at depths, hire charge for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for FOOTINGS OF ABUTMENT, WINGS AND PIERS BELOW SILL LEVEL

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

275.16

-

6020.42

... More
Vibrated Cement Concrete of grade M20 (Nominal Mix) using 40 mm ISS size HBG graded Metal including cost and conveyance of all materials to site and including cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, working on height, hire charge for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for SUBSTRUCTURE OF ABUTMENTS, WINGS, AND PIERS BELOW SILL LEVEL

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

134.29

-

7029.12

... More
Vibrated Reinforced Cement Concrete of M30 (Design Mix) using 20mm HBG graded Metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrications of steel at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, working on heights, hire charges for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for BED BLOCK CUM DIRT WALL OVER ABUTMENTS AND BED BLOCK OVER PIERS.

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

13.92

-

9382.76

... More
Providing and Fixing 110mm dia Class I PVC Seepage Pipes of required length for abutment and wings, including cost and conveyance of all materials to work site, cost and labour for 900mm dia semi-spherical backfill arrangements with 110mm size broken granite chips at the periphery and labour charges for fixing etc., to drain of the backfill IN THE ABUTMENTS AND WINGS

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

30

-

172.8

... More
Providing and Fixing KRAFT PAPER in full width of seating of Deck Slab and including cost and conveyance to work site, labour charges for fixing the same in the correct position and all other incidental charges etc. complete

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

43.49

-

100

... More
Vibrated Reinforced Cement Concrete of M30 (Design Mix) using 20mm HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrications of steel at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, working on heights,hire charges for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for DECK SLAB, KERB AND SAFETY KERB.

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

257.09

-

9933.18

... More
Providing FILTER MEDIA behind the Abutments and Wings with clean graded III material to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc. for filter media as per MORTH Revision vth Cl.309-3-2-2 and 305-4-4 etc., complete.∙

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

36.8

-

1130.05

... More
Filling behind Abutment and Returns as per Appendix 6 of IRC: 78-2014 with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under OMC to get the maximum density, including watering with all leads and lifts for water and all other incidental charges etc., complete.

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

80.41

-

286.5

... More
Providing and Fixing PVC Expansion Joint in between Deck Slabs over Abutment and Pier as shown in the drawing including cost and conveyance of expanions joints, including shalimar pad and joint sealent etc. complete.

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

59.7

-

550

... More
Supply and Fabrication of steel at site Grade Fe-500 at site required for all RCC items of works involved in the schedule including cost of steel at site, cost of fabrication, labour charges for cleaning the bars, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of space bars, cover blocks and all other incidental charges etc., complete,

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

23.74

-

69849.37

... More
Vibrated Cement Concrete of M15 (Nominal Mix ) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charges for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for Base course below approach slab

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

13

-

5514.18

... More
Vibrated Reinforced Cement Concrete of M30 (Design Mix ) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charges for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for Approach slab

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

18.27

-

7410.97

... More
Vibrated Reinforced Cement Concrete of M40 (Design Mix ) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charges for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for outer crash barrier

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

23.86

-

11926.13

... More
Vibrated Cement Concrete of M15 (Nominal Mix ) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charges for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for Parapet

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

6.07

-

8417.78

... More
Providing and Fixing of G.I. Drainage Spouts of 100mm dia as per GOI drawing No. SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spouts projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing including cost and conveyance of GI pipe and flats and fixing them in position etc. complete as per standard specification.

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

10

-

2100

... More
Supply and Fixing of High Quality PVC pipes of 150mm dia of required length including cost and conveyance of pipes to site and fixing in position to proper gradient and level including all labour charges for fixing and including all other incidental charges etc. complete for providing utilities service in Safety kerb

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

196.48

-

357

... More
Earthwork for sub grade, shoulders and backfills in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per SS 20B for making up embankments for fomation of Diversion road using carted earth with an average lead of 5 km for (95% compaction)

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

595

-

140.38

... More
Earthwork for sub grade, shoulders and backfills in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per SS 20B for making up embankments for fomation of Diversion road using carted earth with an average lead of 5 km (97% compaction)

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

464

-

141.09

... More
Gravel soling for making pavements in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Diversion road using Gravel from an approved quarry

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

78.75

-

286.5

... More
Earthwork excavationin all classes of soils depositing on bank, with all leads and lifts as per SS 20B, including cost of all labour, equipments and all other incidental charges such as shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifation for Foundation for Toe Wall

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

202.5

-

146.2

... More
Vibrated Cement concrete 1:2:4 (Nominal Mix) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site, including cost of cement at site and including soft water, labour charges for mixing, transporting, laying, curing and compacting concrete, hire charges for tools and plants and all other incidental charges etc., complete as per standard specification for FOUNDATION for Toe Wall

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

60.75

-

5059.95

... More
Vibrated Cement Concrete of 1:2:4 (Nominal Mix) using 40 mm ISS size HBG graded Metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charge for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for Toe Wall (below sill)

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

91.35

-

5966.41

... More
Vibrated Cement Concrete of 1:2:4 (Nominal Mix) using 40 mm ISS size HBG graded Metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charge for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for Toe Wall (above sill)

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

131.4

-

7043.51

... More
Providing and fixing SEEPAGE PIPES of 110mm dia PVC pipes of required length for Retaining Wall including cost and conveyance of all materials to worksite, cost and labour for 900mm dia. Semi-spherical back fill arrangements with 110mm size broken granite chips at the periphery and labour charges for fixing etc., to drain of the Backfill in the Retaining Wall

-

-

-

... More
Upgradation of Kadampur - EppothumVenran road to Puthupatti road km 0/0-4/320

88

-

172.8

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items (excluding GST)

1

-

-

... More
GST 12% for above SubTotal Amount

1

-

-

... More
Total in Figures (SubTotal + GST)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.