National Bank For Agriculture And Rural Development Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date17 Oct 2024
Closing Date5 Nov 2024
Tender Amount₹ 6,20,80,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road C

4080

6

26275.2

... More
Picking the existing BT surface, leveling and sectioning in accordance with specifications and as directed by the Engineer. as per MORT & H 111, 112, 202, 303.4.3, 501

-

-

-

... More
Road B

1369.46

21

29909.01

... More
Providing and laying granular Sub-base as per table No.400-1/400-2 and Grading V of MORT&H Revision V with and any other Granular Material or a combination those of for required thick to give a CBR of 30 on prepared sub-grade in accordance with the requirements of the specification as per MORT&H Vth Revision 111, 112, 401, 900

-

-

-

... More
Road A

1239.55

2169

2689439.24

... More
Road B

262.5

2209

579938.63

... More
Road C

642.15

2222

1427171.95

... More
Providing and laying, spreading and compacting graded stone aggregate Wet mix macadam specification including pre-mixing the material with water at OMC in base mix plant (Pugmill) carriage of mixed material by tipper to site and laying in uniform layers in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MORT&H Vth Revision 111, 112, 406, 900

-

-

-

... More
Road A

2515.46

2277

5730066.95

... More
Road B

1684.85

2277

3837987.21

... More
Road C

1662.57

2277

3787234.71

... More
Providing and laying of Prime coat using Emulsion bitumen (SS1 ) at the rate of 7Kg/10 Sqm. over the WMM surface preparatory to another bituminous construction over it as per MORT&H Vth Revision 111, 112, 501, 502, 900

-

-

-

... More
Road A

10061.86

80

812998.29

... More
Road B

6739.37

80

544473.7

... More
Road C

6650.26

80

537607.02

... More
Providing and laying of tack coat using Emulsion bitumen (RS1 ) at the rate of 2.50 Kg./ 10 Sqm. over the Primed surface preparatory to another bituminous construction over it as per MORT&H Vth Revision 111, 112, 501, 503, 900

-

-

-

... More
Road A

10061.86

18

186144.41

... More
Road B

6739.37

18

124678.35

... More
Road C

6650.26

18

123096.31

... More
Bituminous macadam of 50mm thickness which work shall consist of construction, in a single course of compacted crushed aggregates premixed with bituminous binder 60/70 grade bulk (VG 30) bitumen which will be procurred by the Contractor at the rate of 3.5 percent by weight of the total mix, to serve as base / binder couse, in accordance with the requirement of the specifications and in conformity with the drawing or as directed by the Engineer using approved CMP and paver finisher as per MORTH Vth Revision 111, 112, 501, 504, 900

-

-

-

... More
Road A

503.1

8366

4209125.78

... More
Road B

336.97

8366

2819219.07

... More
Road C

332.52

8366

2781988.68

... More
Providing and laying 30 mm thick compacted Bituminous Concrete which shall consist of construction of a single course binder / wearing course on a previously prepared bituminous base to the requirements of the specification using 60/70 Grade bitumen (VG 30) as per MORT & H Vth Revision 111, 112, 501 507 900

-

-

-

... More
Road A

301.85

10506

3171477.58

... More
Road B

202.18

10506

2124264.82

... More
Road C

199.5

10506

2096106.6

... More
Collection and supply of carted earth including excavation, removal and satisfactory disposal of all materials necessary for the construction of road way in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for making up low berms as per MORT&H Vth Revision 111, 112, 202, 301, 302, 303, 305, 900

-

-

-

... More
Road A

4063.51

238

967237.29

... More
Road B

2410.39

238

573745.13

... More
Road C

2538.03

238

604127.28

... More
Supply and fixing of Kilometre stone of standard design and drawing as per IRC :8-1980 (Second revision), including painting and numbering etc., and all other incidental charges etc complete.

-

-

-

... More
Road A

2

2197

4394

... More
Road B

1

2197

2197

... More
Road C

1

2197

2197

... More
Supply and fixing of Hectometre stone of standard design and drawing as per IRC :26-1967 including painting and numbering etc., and all other incidental charges etc complete.

-

-

-

... More
Road A

11

574

6321.15

... More
Road B

7

574

4022.55

... More
Road C

7

574

4022.55

... More
Providing and erecting direction and place identification retro reflectorised sign made out of high intensity prismatic grade sheeting confirming to Type IV standards of IRC 67: 2012 and ASTM D 4956-09 specification and fixed over 2 mm thick aluminium sheet fixed over a back supporting frame of 25 mm x 25 mm x 3mm mild steel angle and supported on a mild steel angle post 75 x 75x 6 mm with clear height of not less than 2.10 m from the ground level to the bottom of sign board and 0.6 m below ground level. The sign post should be painted asper IRC 67-2012 and firmly fixed to the grond by meand of properly designed foundation with M15 grade CC 45 cmx45cmx60 cm size including cost and conveyance of all materials equipment,machinary andlabour with all leads and lifts ,loading charges necessary for satisfactory completion of the work as directed by the engineer in charge . High intensity retro reflectro sheet shall consist of minimum coefficent as per table 6.6 of IRC 67 2012. the retro reflective sheeting shall be covered under 7 years warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012 ( as per MORT&H specification No.801 (for sign having area more than 0.90 Sqm) Type - IV

-

-

-

... More
Road-A

2.16

11805

25499

... More
Road-B

2.16

11805

25499

... More
Road-C

2.16

11805

25499

... More
FOR CROSS DRAINAGE WORKS- BOX CULVERT

-

-

-

... More
Dismantling the existing Brick / Stone Masonry in cement Mortar under 3m height in the existing causeway / bridge ad clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officer including all labour and incidental charges etc., complete. as per MORT&H Vth Revision 111, 112, 202

-

-

-

... More
Road A

52.01

283

14726.11

... More
Road B

26.65

283

7545.68

... More
Road C

10.51

283

2975.8

... More
Dismantaling the existing RCC slab over culverts salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc., complete as per MORTH Vth Revision 111,112,202

-

-

-

... More
Road A

9.6

4308

41363.52

... More
Road B

3.6

4308

15511.32

... More
Dismantaling the existing cut stone slab over culverts salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc., complete as per MORTH Vth Revision 111,112,202

-

-

-

... More
Road C

14.25

512

7309.97

... More
Dismantling the existing RCC Pipes and removal and disposing of resulting materials and back filling the resulting trenches and pits etc. or as directed by the departmental officer including all labour and incidental charges etc., complete.

-

-

-

... More
Road A

67.5

100

6750

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank as per SS 20 B with all leads and lifts and all other incidental charges such as bailingout water shoring strutting, walling & forming protective bunds wherever necessary etc., complete as per relevant standard specification for DRESSING THE BED UPTO SILL LEVEL as per MORT&H Vth Revision 304.

-

-

-

... More
Road-A

44.06

123

5431

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges such as bailing out water, sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOUNDATION as per MORTH Vth Revision 304.

-

-

-

... More
Road A

641.45

246

158130.25

... More
Road B

140.12

246

34542.38

... More
Road C

66.92

246

16497.12

... More
Plain cement concrete M15 Grade (Nominal mix ) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for LEVELLING COURSE BELOW BOX CULVERT as per MORTH Vth Revision 1000, 1500, 1700, 2100.

-

-

-

... More
Road A

49.29

6446

317723.34

... More
Road B

9.32

6473

60328.36

... More
Road C

4.97

6495

32280.15

... More
Vibrated cement concrete M20 Grade (Nominal mix) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for FOUNDATION FOR RETURN WALL (BELOW SILL LEVEL) as per MORTH Vth Revision 1000, 1500, 1700, 2100.

-

-

-

... More
Road A

166.14

8689

1443590.46

... More
Road B

23.94

7952

190370.88

... More
Road C

15.84

8364

132488.93

... More
Vibrated Reinforced Cement Concrete M25 (Design mix) using 20mm and 12mm ISS HBG graded metal including cost and conveyance of all materials to work site,, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for BOX CULVERT, BASE SLAB, SIDE WALL & TOP SLAB as per MORTH Vth Revision 1000, 1500, 1700, 2100.

-

-

-

... More
Road A

281.59

11634

3276018.06

... More
Road B

65.54

11302

740733.08

... More
Road C

32.51

12141

394703.91

... More
Vibrated cement concrete M20 Grade (Nominal mix) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for RETURN WALL (ABOVE SILL LEVEL) as per MORTH Vth Revision 1000, 1500, 1700, 2100.

-

-

-

... More
Road A

149.56

9772

1461500.32

... More
Road B

33.69

9367

315574.23

... More
Road C

16.35

10205

166851.75

... More
Vibrated cement concrete M15 Grade (Nominal mix) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for Parapet as per MORTH Vth Revision 1000, 1500, 1700, 2100.

-

-

-

... More
Road A

9.66

11252

108694.32

... More
Road B

1.73

11154

19296.42

... More
Road C

0.95

11555

10977.25

... More
Supply and fabrication of steel grade Fe-500 required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening, cutting, bending, tying grills,hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges, etc., complete as per standard specification as per MORTH Vth Revision 1000, 1600.

-

-

-

... More
Road A

18.97

95609

1813994.68

... More
Road B

4.17

95609

398690.66

... More
Road C

2.28

95609

217989.14

... More
Vibrated Cement Concrete M30 (Design mix) with surface reinforcement using 20mm 12mm and 6mm ISS HBG graded metal including cost and conveyance of all materials to work site, but including cost and labour charges for form work cost of premoulded expansion joint and fixing the same in position and centering labour charges for compacting, curing, including all incidental charges etc., complete for wearing coat of 75mm uniform thickness over deck slab as per MORT&H Vth Revision 1500, 1600, 1700, 2702.2

-

-

-

... More
Road A

160.8

752

121064.71

... More
Road B

34.94

754

26376.21

... More
Road C

19.11

754

14410.28

... More
Granite rough stone dry packing for Launching Apron the specified thickness for apron using good size granite rough stone with proper wedging with quarry spalls including cost and conveyance of all materials to worksite and stacking the same to departmental gauge for premeasurement including labour charges for placing the stones in correct position and all incidental charges etc., complete as per MORT&H Vth Revision 2500

-

-

-

... More
Road A

19.12

2309

44152.67

... More
Grouting the aprons to 225mm deep with CC 1:2:4 using 20mm metal and pointing with CM 1:2 including cost and conveance of all materials to work site including cost and conveyance of cement to site including labour charges for mixing, transporting, laying and curing concrete working at heights, hire charges for tools and plants, including all other incidental charges etc., complete as per standard specification for GROUTING THE RIGID APRONS as per MORTH Vth Revision 2500

-

-

-

... More
Road A

63.7

718

45792.02

... More
Filling the trench with Carted earth including cost and conveyance of material to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete for Box culvert, Side wall Portion as per MORTH V Revision 304

-

-

-

... More
Road A

106.96

225

24072.42

... More
Road B

38.69

225

8707.57

... More
Road C

15.68

225

3528.94

... More
Collection and supply of carted earth including excavation, removal and satisfactory disposal of all materials necessary for the construction of road way in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for Diversion Road as per MORT&H Vth Revision 111, 112, 202, 301, 302, 303, 305, 900

-

-

-

... More
Road A

1106

238

263261.18

... More
Road B

177.5

238

42250.33

... More
Road C

120

238

28563.6

... More
FOR RECONSTRUCTION OF PIPE CULVERT

-

-

-

... More
Dismantaling the RCC Pipes and removal and disposing of resulting materials and back filling the resulting trenches and pits etc., complete as per direction of Engineer incharge.

-

-

-

... More
Road B

7.5

100

750

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges such as bailing out water, sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOUNDATION as per MORTH Vth Revision 304.

-

-

-

... More
Road B

33.62

246

8288

... More
Road C

33.62

246

8288

... More
Vibrated cement concrete M20 Grade (Nominal mix) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for Foundation of Body Wall (Below Sill Level). as per MORTH Vth Revision 1000, 1500, 1700, 2100.

-

-

-

... More
Road B

13.59

7908

107469.72

... More
Road C

13.59

7930

107768.7

... More
Vibrated cement concrete M20 Grade (Nominal mix ) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for Body Wall (Above Sill Level). as per MORTH Vth Revision 1000, 1500, 1700, 2100.

-

-

-

... More
Road B

14.26

10432

148760.32

... More
Road C

14.26

10454

149074.04

... More
Vibrated cement concrete M15 Grade (Nominal mix) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for PARAPET as per MORTH Vth Revision 1000, 1500, 1700, 2100.

-

-

-

... More
Road B

0.81

11719

9492.39

... More
Road C

0.81

8384

6791.04

... More
Supply of NP3 Class 1000mm dia R.C.C Pipes to suit the respective diametre of pipes confirming to IS Specifications 458 to various diametre of pipes including cost of Pipes inclusive of all taxes, loading, unloading conveyance and delivery at road site as directed by the departmental officers, including all other incidental charges etc, complete including Hoisting and Fixing the pipe in position as per MORTH Vth 2900

-

-

-

... More
Road B

7.5

4543

34072.5

... More
Road C

7.5

4543

34072.5

... More
Filling the trench with excavated earth including all cost, conveyance and filling charges and compacting below and around the hume pipes and all other incidental charges etc., complete as directed by the departmental officers complete as per MORTH Vth Revision 304

-

-

-

... More
Road B

10.17

42

435.79

... More
Road C

10.17

42

435.79

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items (excluding GST)

1

52600893

-

... More
GST 18% for above SubTotal Amount

1

9468160

9468160.75

... More
Total in Figures (SubTotal + GST)

-

-

62069053.78



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.