National Bank For Agriculture And Rural Development Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
National Bank For Agriculture And Rural Development - NABARD Tender
Civil And Construction
Building Construction
Eprocure
Opening Date12 Dec 2024
Closing Soon20 Dec 2024
Tender Amount₹ 2,56,75,000
Costs
EMD
₹ 1,39,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HWAY_510370_1Tender No
TN.No.32 /2024-2025 / SDO/Dated.09.12.2024Tender Authority
National Bank For Agriculture And Rural Development ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 502 & 900 of MORTH Rev-5.
8190.6
81
670646.33
... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 503 & 900 of MORTH Rev-5.
8190.6
18
154884.25
... More
Providing and laying Tack Coat over Dry Lean cement concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 503 & 900 of MORTH Rev-5.
40.6
21
869.25
... More
Providing and laying 50mm thick Consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20mm 0.430cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below IRC metal with 37 kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plants required, including all other and incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 504 & 900 of MORTH Rev-5.
409.6
8620
3530850.3
... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50 - 2.36mm and 0.26 cum of 2.36mm and below with 50.30 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10t Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, Paver finisher, Vibratory roller and all other tools and plants required, including all other and incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 507 & 900 of MORTH Rev-5.
247
10929
2699500.05
... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with vibratory soil compactor, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation backfilling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for Embankment / sub grade - 3 Km lead complete as directed by the departmental officers as per clause 111, 112, 301, 305 & 900 of MORT&H Specification (Fifth Revision)
8669.25
365
3172598.73
... More
Providing RCC M15 grade precast KM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete (as per MORTH & H specification no 804).
2
2197
4394
... More
Providing RCC M15 grade precast HM stone of standard design as per IRC 26 -1967 and fixing in position including painting and printing etc., complete (as per MORTH & H specification no 804).
9
574
5171.85
... More
Providing and erecting of Direction and Place Identification Retro-Reflectorized Sign made out of High Intensity Prismatic grade sheeting confirming to Type IV standards of IRC 67-2012 and ASTM D 4956-09 specification and fixed over 2mm thick aluminium sheet fixed over a back supporting frame of size 25mm x 25mm x 3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmx45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall he obtained as per IRC 67:2012. (as per MORT&H Specification No 801).
Rate per Sqm (For sign having area more than 0.9 sqm) Type-IV
1.8
11805
21249
... More
Dismantling the existing RR Masonry in Cement Mortar in the existing bridge and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete as per clause 111, 112 & 202 of MORT&H specification (Fifth Revision) FOR BOX CULVERT.
-
-
-
... More
i) Construction of Box Culvert at Km 0/2.
2.7
283
764.48
... More
Dismantling the exisiting RCC Slab and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete as per clause 111, 112 & 202 of MORT&H specification (Fifth Revision) FOR BOX CULVERT.
-
-
-
... More
i) Construction of Box Culvert at Km 0/2.
2.25
4308
9694.58
... More
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per Clause 111, 112, 304 of MORT&H (V Revision) for FOUNDATION OF BOX CULVERT.
-
-
-
... More
i) Construction of Box Culvert at Km 0/2.
32.1
246
7913.29
... More
Plain Cement Concrete of grade M10 (Nominal mix), using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for LEVELING COURSE OF BOX CULVERT.
-
-
-
... More
i) Construction of Box Culvert at Km 0/2.
8.1
5498
44535.99
... More
Vibrated Reinforced cement concrete of grade M25 (design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel including cost of form work, labour charges for mixing, transporting, laying, curing concrete, potable water, working at heights, hire charges for tools and plants, including all other incidental charges etc., complete as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for BASE SLAB, SIDE AND TOP SLAB OF BOX CULVERT.
-
-
-
... More
i) Construction of Box Culvert at Km 0/2.
83.9
10792
905510.89
... More
Supply and fabrication of Fe-500D grade Steel required for all RCC items of works involved in the schedule cost of steel at site and cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete as per clause 1600 of MORT&H Specifications (Fifth Revision) for BOX CULVERT.
-
-
-
... More
i) Construction of Box Culvert at Km 0/2.
5.44
95609
520114.43
... More
Vibrated Cement Concrete M15 grade Nominal Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specification, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) FOR PARAPET OVER BOX CULVERT.
-
-
-
... More
i) Construction of Box Culvert at Km 0/2.
2.5
10671
26678.9
... More
ii) Construction of Balancing Pipe Culvert at Km 0/2.
12.2
11613
141689.82
... More
Refilling behind retaining wall with excavated earth including conveyance of all materials to work site including labour charges for filling in layers compacting by manual labour under optimum moisture content to get the maximum density as layer including all incidental charges etc,. complete FOR BOX CULVERT. (Labour Charges only).
-
-
-
... More
i) Construction of Box Culvert at Km 0/2.
18
42
771.3
... More
Earthwork excavation in Hard rock measured in solid including blasting & stacking and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per Clause 111, 112, 304 of MORT&H (V Revision) for FOUNDATION OF PIPE CULVERT.
-
-
-
... More
ii) Construction of Balancing Pipe Culvert at Km 0/2.
105
871
91510.65
... More
Vibrated Cement Concrete of grade M20 Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for FOOTING OF PIPE CULVERT. (BELOW SILL).
-
-
-
... More
ii) Construction of Balancing Pipe Culvert at Km 0/2.
48
6361
305368.8
... More
Vibrated Cement Concrete of grade M20 Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for BODY WALL OF PIPE CULVERT. (BELOW SILL).
-
-
-
... More
ii) Construction of Balancing Pipe Culvert at Km 0/2.
37.4
7890
295087.87
... More
Vibrated Cement Concrete of grade M20 Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for BODY WALL OF PIPE CULVERT. (ABOVE SILL).
-
-
-
... More
ii) Construction of Balancing Pipe Culvert at Km 0/2.
163
8943
1457770.94
... More
Supply of NP 3 class RCC 900 mm dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458/ 1989 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the departmental officers etc., complete FOR PIPE CULVERT.
-
-
-
... More
ii) Construction of Balancing Pipe Culvert at Km 0/2.
30
3821
114642
... More
Hoising and Fixing of 900 mm dia. NP 3 pipes to proper gradient including all labour charges and all other incidental charges etc., complete FOR PIPE CULVERT.
-
-
-
... More
ii) Construction of Balancing Pipe Culvert at Km 0/2.
30
231
6930
... More
Filling behind Pipe Culvert with Carted earth including cost and conveyance of earth to worksite, laying, handling charges and filling in layers tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc,. complete FOR PIPE CULVERT.
-
-
-
... More
ii) Construction of Balancing Pipe Culvert at Km 0/2.
573.4
204
117529.8
... More
Calculation of SubTotal, GST and Total carried out by system automatically
-
-
-
... More
Sub Total Amount for above all items (excluding GST)
1
21756281
-
... More
GST 18% for above SubTotal Amount
1
3916131
3916131
... More
Total Value put to Tender
1
25672412
-
... More
Negotiated Percentage
1
-
-
... More
Final Negotiated Value
1
-
-
... More
Add GST at 12% of Final Negotiated Value
1
-
-
... More
Total Value of Contract Including 12% of GST
1
-
-
... More
Total in Figures (SubTotal + GST)
-
-
25672412
... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%