National Bank For Agriculture And Rural Development Tender

... More
The NABARD has issued a formal invitation for competitive bids for the National Bank For Agriculture And Rural Development project, for Upgradation Of Panchayat Union / Panchayat Roads To Other District Roads Slm-8 in Coimbatore, Tamil Nadu, with an estimated contract value of Rs. 4,81,50,000. The bid opening date for this tender is 11-04-2025 and the last date for bid submission is 28-04-2025. Interested bidders for National Bank For Agriculture And Rural Development tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

National Bank For Agriculture And Rural Development - NABARD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date11 Apr 2025
Closing Date28 Apr 2025
Tender Amount₹ 4,81,50,000 
Notes
Download

AI Insights

Class Of Bidder
Bid Capacity
... View More
The formula for bid capacity is: Assessed Available Bid Capacity = (A x N x 2)-B Where A is Maximum value of construction works executed in any one year during the last five years (updated to the current price level) B is Value at current price level of the existing commitments and ongoing works to be completed during the next 5 months N is Number of years prescribed for completion of the works for which the bids are invited.
Technical Capacity
... View More
The required prior work experience for technical personnel is as follows: 1. B.E. Civil Engineering (or) Equivalent degree holder with 1 year experience or retired SDO / AEE/ ADE. 2. Diploma in Civil Engineering with 5 years experience or retired Junior Engineer. The bidder is expected to have carried out satisfactorily work of similar size, nature, and complexity. The bidder should provide details of works carried out, including the value and percentage, if applicable. The bidder should have achieved an average annual turnover of at least 40% of the value of the contract applied for, over the last five years, which is Rs.192.60 Lakhs. The bidder should also have successfully completed at least one contract of similar nature with a value of at least 40% of the proposed contract in any one year within the last five years. Additionally, the bidder should demonstrate experience in similar nature of work, including quantities such as: - Earthwork: 4704.60 m3 (completed) and 1881.84 m3 (minimum required) - Gravel Soling, GSB: 324.50 m3 (completed) and 129.80 m3 (minimum required) - WMM, CRM: 4923.10 m3 (completed) and 1969.24 m3 (minimum required) - Prime coat, Tack coat: 39531.80 m2 (completed) and 15812.72 m2 (minimum required) - BM, DBM: 987.70 m3 (completed) and 395.08 m3 (minimum required) - BC, SDBC: 598.50 m3 (completed) and 239.40 m3 (minimum required) - CC, VCC, VRCC: 827.85 m3 (completed) and 331.14 m3 (minimum required) - Steel: 13.20 MT (completed) and 5.28 MT (minimum required)

Costs

Summary

Upgradation Of Panchayat Union / Panchayat Roads To Other District Roads Slm-8

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
A) Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

712.8

237

169632.14

... More
A) i). Construction of Box Culverts at Km 0/2, 0/4 for the work of Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

7.2

192

1386

... More
A) i). Construction of Box Culverts at Km 0/2, 0/4 for the work of Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

18.75

6239

116988.19

... More
B) Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

20

1220

24404.4

... More
Dismantling the existing RR Masonry in Cement Mortar in the existing bridge and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete as per clause 111, 112 & 202 of MORT&H specification (Fifth Revision) FOR BOX CULVERT.

-

-

-

... More
A) i). Construction of Box Culverts at Km 0/2, 0/4 for the work of Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

173.8

246

42845.18

... More
B) Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

3923.5

2276

8932318.57

... More
B) Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

3108.6

237

739784.63

... More
B) Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

786.6

9191

7230081.1

... More
A) i). Construction of Box Culverts at Km 0/2, 0/4 for the work of Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

8.8

5375

47307.04

... More
Vibrated Reinforced cement concrete of grade M-25 (Design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel including cost of form work, labour charges for mixing, transporting, laying, curing concrete, potable water, working at heights, hire charges for tools and plants, including all other incidental charges etc., complete as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for BASE SLAB SIDE AND TOP SLAB OF BOX CULVERT.

-

-

-

... More
Total Value put to Tender

1

48148896

-

... More
B) Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

5.8

11389

66059.8

... More
B) i). Construction of Box Culverts at Km 0/2, 1/8, 2/2, 2/4 & 3/4 for the work of Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

49.1

9297

456496.45

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for STEM OF WING WALL OF BOX CULVERT AND PROTECTIVE WORKS. (ABOVE SILL).

-

-

-

... More
A) Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

1296

6

8346.24

... More
B) i). Construction of Box Culverts at Km 0/2, 1/8, 2/2, 2/4 & 3/4 for the work of Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

35.1

6495

227984.33

... More
Negotiated Percentage

1

-

-

... More
A) Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

1.8

11389

20501.32

... More
B) Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

14

574

8045.1

... More
Picking the existing BT surface upto 50mm thick depth etc. complete as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and depositing the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed for the work and including all other incidental charges etc., complete as per as per clause 111, 112, 202, 203, 303, 403 & 501 of MORT&H Specification (Fifth Revision).

-

-

-

... More
Providing and laying 50mm thick Consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20mm 0.430cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below IRC metal with 37 kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plants required, including all other and incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 504 & 900 of MORTH Rev-5.

-

-

-

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50 - 2.36mm and 0.26 cum of 2.36mm and below with 50.30 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10t Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, Paver finisher, Vibratory roller and all other tools and plants required, including all other and incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 507 & 900 of MORTH Rev-5.

-

-

-

... More
A) i). Construction of Box Culverts at Km 0/2, 0/4 for the work of Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

82

37

3084.84

... More
A) Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

201.1

9191

1848422.72

... More
Vibrated Cement Concrete M15 grade Nominal Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specification, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) FOR PARAPET OVER BOX CULVERT AND PROTECTIVE WORKS.

-

-

-

... More
Clearing and grubbing by Cutting Light jungle removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness as rubbish including all other incidental charges etc., complete as per clause 111, 112, 201 of MORT&H Specification.

-

-

-

... More
A) i). Construction of Box Culverts at Km 0/2, 0/4 for the work of Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

14.7

283

4162.16

... More
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam of required thickness including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Rev-5.

-

-

-

... More
B) ii). Construction of Protective Works for the work of Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

54.3

11630

631557.87

... More
Total Value of Contract Including 12% of GST

1

-

-

... More
Dismantling the Reinforced cement concrete using deploying machineries in the existing culvert and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete as per clause 111, 112 & 202 of MORT&H specification (Fifth Revision) FOR BOX CULVERT.

-

-

-

... More
B) i). Construction of Box Culverts at Km 0/2, 1/8, 2/2, 2/4 & 3/4 for the work of Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

10.05

95609

960873.16

... More
A) Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

10

1220

12202.2

... More
B) ii). Construction of Protective Works for the work of Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

155.3

10945

1699847.02

... More
B) i). Construction of Box Culverts at Km 0/2, 1/8, 2/2, 2/4 & 3/4 for the work of Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

4

4308

17234.8

... More
B) Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

114.4

22

2578.58

... More
B) Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

182

2129

387634.52

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation backfilling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for Carted earth for making up berms with conveyance of 5 Km complete as directed by the departmental officers as per clause 111, 112, 301, 305 & 900 of MORT&H Specification (Fifth Revision)

-

-

-

... More
Providing RCC M15 grade precast HM stone of standard design as per IRC 26 -1967 and fixing in position including painting and printing etc., complete (as per MORTH & H specification no 804).

-

-

-

... More
B) i). Construction of Box Culverts at Km 0/2, 1/8, 2/2, 2/4 & 3/4 for the work of Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

35.4

11463

405796.22

... More
Refilling behind body wall with excavated earth including conveyance of all materials to work site including labour charges for filling in layers compacting by manual labour under optimum moisture content to get the maximum density as layer including all incidental charges etc,. complete FOR BOX CULVERT AND PROTECTIVE WORKS. (Labour Charges only).

-

-

-

... More
Providing and laying Tack Coat over Dry Lean cement concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 503 & 900 of MORTH Rev-5.

-

-

-

... More
Supply and fixing of R.C.C. GUIDE POSTS of size 1.2x0.2x0.2 m with reflective star stickers with tin M.S. Sheet with two side packing and top cover of 0.75 inches in R.C.C 1:2:4 mix using 20mm HBG metal with 10mm dia bars as vertical with 8mm dia stirrups including 8.25 inches x 4.25 feet mould with star shape of 5 inches and top Projection by Projection by 0.75 inches x 3 inches including cost and conveyance of materials to worksite etc., complete.

-

-

-

... More
A) i). Construction of Box Culverts at Km 0/2, 0/4 for the work of Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

26.9

8890

239142.08

... More
Sub Total Amount for above all items (excluding GST)

1

40804149

-

... More
Construction of Granular Sub-base by providing close graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Specification for grading-V Material.

-

-

-

... More
A) Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

999.6

2276

2275709.35

... More
A) i). Construction of Box Culverts at Km 0/2, 0/4 for the work of Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

18.9

11120

210177.83

... More
B) Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

4536

6

29211.84

... More
Plain Cement Concrete of grade M10 (Nominal mix), using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for LEVELING COURSE OF BOX CULVERT.

-

-

-

... More
B) ii). Construction of Protective Works for the work of Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

270.8

246

66757.62

... More
B) i). Construction of Box Culverts at Km 0/2, 1/8, 2/2, 2/4 & 3/4 for the work of Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

5.3

11237

59559.49

... More
Add GST at 12% of Final Negotiated Value

1

-

-

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for STEM OF WING WALL OF BOX CULVERT AND PROTECTIVE WORKS. (BELOW SILL).

-

-

-

... More
Providing and fixing PVC seepage pipes of 100mm dia. PVC pipes of requied lengths including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc., complete as per clause 2700 of MORT&H Specification (Fifth Revision) to drain of the backfill in THE ABUTMENTS AND WINGS FOR BOX CULVERT AND PROTECTIVE WORKS.

-

-

-

... More
A) Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

3998.1

19

79402.27

... More
Final Negotiated Value

1

-

-

... More
A) i). Construction of Box Culverts at Km 0/2, 0/4 for the work of Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

2.1

10981

23061.65

... More
B) ii). Construction of Protective Works for the work of Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

38.7

192

7449.75

... More
B) i). Construction of Box Culverts at Km 0/2, 1/8, 2/2, 2/4 & 3/4 for the work of Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

18

192

3465

... More
Providing RCC M15 grade precast KM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete (as per MORTH & H specification no 804).

-

-

-

... More
B) i). Construction of Box Culverts at Km 0/2, 1/8, 2/2, 2/4 & 3/4 for the work of Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

170.5

37

6414.21

... More
Providing and laying Bituminous Concrete to 50mm thick using 0.22cum of 26.50-13.20mm, 0.24cum of 13.20 - 2.36mm and 0.26 cum of 2.36mm and below IRC HBG metal with 62.40 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10t Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, Paver finisher, Vibratory roller and all other tools and plants required, including all other and incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 507 & 900 of MORTH Rev-5.

-

-

-

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for FOOTINGS OF WING WALL OF BOX CULVERT AND PROTECTIVE WORKS.

-

-

-

... More
B) Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

4987.1

21

108918.26

... More
B) Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

15693.4

19

311670.92

... More
B) i). Construction of Box Culverts at Km 0/2, 1/8, 2/2, 2/4 & 3/4 for the work of Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

149.5

11445

1711029

... More
B) i). Construction of Box Culverts at Km 0/2, 1/8, 2/2, 2/4 & 3/4 for the work of Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

28.2

5631

158808.02

... More
B) Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

3

2197

6591

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
A) Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

3998.1

84

337159.77

... More
B) i). Construction of Box Culverts at Km 0/2, 1/8, 2/2, 2/4 & 3/4 for the work of Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

438.6

246

108123.67

... More
A) i). Construction of Box Culverts at Km 0/2, 0/4 for the work of Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

3.15

95609

301169.2

... More
A) Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

4

574

2298.6

... More
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per Clause 111, 112, 304 of MORT&H (V Revision) for FOUNDATION OF BOX CULVERT AND PROTECTIVE WORKS.

-

-

-

... More
A) i). Construction of Box Culverts at Km 0/2, 0/4 for the work of Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

45.7

11264

514780.34

... More
A) Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

120

11900

1428042

... More
A) Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

142.5

2063

294100.05

... More
B) ii). Construction of Protective Works for the work of Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

126.8

8186

1038048.2

... More
B) i). Construction of Box Culverts at Km 0/2, 1/8, 2/2, 2/4 & 3/4 for the work of Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

52.6

283

14893.16

... More
A) Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

1117.8

21

24412.75

... More
A) Upgradation of Km 8/2 of Karamadai Tholampalayam Road to Kanuvaipalayam Road Km 0/0-0/990.

34.4

22

775.38

... More
GST 18% for above SubTotal Amount

1

7344747

7344747

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 503 & 900 of MORTH Rev-5.

-

-

-

... More
B) ii). Construction of Protective Works for the work of Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

292.3

37

10996.33

... More
B) Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

470.9

11900

5603874.82

... More
Total in Figures (SubTotal + GST)

-

-

48148896

... More
Supply and fabrication of Fe-500D grade Steel required for all RCC items of works involved in the schedule cost of steel at site and cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete as per clause 1600 of MORT&H Specifications (Fifth Revision) for BOX CULVERT.

-

-

-

... More
B) ii). Construction of Protective Works for the work of Upgradation of Periyakumarapalayam - Bhavani Sagar Limit Road Km.0/0-3/550.

67.7

6488

439264.68



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.