Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
National Bank For Agriculture And Rural Development - NABARD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date31 Dec 2022
Closing Date31 Jan 2023
Tender Amount₹ 4,73,21,000
Costs
EMD
₹ 2,47,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_HWAY_277145_1Bid Award Id
ViewTender No
15 / 2022-2023 / SDOTender Authority
National Bank For Agriculture And Rural Development ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 (Specification Number as per MORT&H Rev.V 111,112,406,900)
5294
-
2136.64
Providing and laying Prime Coat over WBM/WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10sqm for pre paratory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 (Specification Number as per MORT&H Rev.V 111,112,502,900)
21173
-
77.68
Providing and laying Tack Coat over primed surface (treated with primer) using 2.50Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction overit including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 (Specification Number as per MORT&H Rev.V 111,112,503,900)
21173
-
18.4
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 (Specification Number as per MORT&H Rev.V 111,112,504,900)
1059
-
8914.78
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 (Specification Number as per MORT&H Rev.V 111,112,507,900)
636
-
11723.73
Carted earth with lead of 5 km including cost of Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance. (Specification Number as per MORT&H Rev.V 304,305)
3203
-
214.01
Providing RCC M15 Grade Precast HM stone of standard design as per IRC 8-1980 and fixing in position including painting and Lettering etc., complete (as per MORTH SPECIFICATION No.805)
16
-
256
Providing RCC M15 Grade Precast KM stone of standard design as per IRC 8-1980 and fixing in position including painting and Lettering ect., complete (as per MORTH SPECIFICATION No.805)
3
-
906
Providing and erecting of Direction and Place Identification Retro-reflectorised Sign made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 -09, specification and fixed over 2mm thickAluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro- reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012. (as per MORT&H Specification No.801) (For sign having area more than 0.9sq.m) Type-IV
1.08
-
11805
SUB ESTIMATE - Reconstruction of Single CELL Box Culvert of 1.50x1.50
Dismantling the the existing Plain Cement concrete in the existing damaged culvert and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.(Specification No.202.)
14
-
419
Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation of BOx Culvert (Specification No.304.)
-
-
-
At km 0/0
74
-
263
At km 1/8
74
-
263
At km 2/8
74
-
263
Plain Cement Concrete M15 grade (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants etc. Complete for Levelling Course for Box Culvert as per MORTH Rev. V Specification No. 1000,1500,1700,2200
-
-
-
At km 0/0
10
-
5508
At km 1/8
10
-
5539
At km 2/8
10
-
5554
Vibrated Reinforced Cement concrete in M25 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete for Base slab Side wall & Deck slab of CELL BOX as per MORTH Rev. V Specification No. 1000,1500,1700,2200,2300
-
-
-
At km 0/0
22
-
11331
At km 1/8
22
-
11362
At km 2/8
22
-
11377
Vibrated Reinforced Cement concrete in M25 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete for Approach slab as per MORTH Rev. V Specification No. 1000,1500,1700,2200,2300
-
-
-
At km 0/0
14
-
8190
At km 1/8
14
-
8221
At km 2/8
14
-
8237
Supply and fabrication of Tor steel grade Fe-500D steel required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and palcing the reinforcement in position as specified in the drawings including cost of binding wire, provision for spacing bars, cover blocks and all other incidental charges etc., complete as per per MORTH Rev. V specifications No.1600.
-
-
-
At km 0/0
3
-
93230
At km 1/8
3
-
93230
At km 2/8
3
-
93230
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, formwork, cost of premoulded expansion joints and fixing the same in position etc., excluding steel complete for wearing coat of 75mm uniform thickness over deck slab as per MORTH Rev. V Specification No.1000, 1500, 1700, 2702.
-
-
-
At km 0/0
60
-
664
At km 1/8
60
-
666.4
At km 2/8
60
-
667.5
Vibrated Cement Concrete M20 grade (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including all other incidental charges etc for Wing wall and Parapet Wall as per MORTH Rev. V Specification No.1000, 1500, 1700, 2200,2300
-
-
-
At km 0/0
28
-
8119
At km 1/8
28
-
8119
At km 2/8
28
-
8166
Providing and fixing PVC Seepage Pipes of 100mm dia at 1.0m c/c staggered of required lengths for abutments and return walls including cost and conveyance of all materials to work site and labour charges for fixing etc, complete to drain of the backfill as per MORTH Rev. V Specification No.2706
-
-
-
At km 0/0
6
-
177.5
At km 1/8
6
-
177.5
At km 2/8
6
-
177.5
Filling Gravel behind the abutments and return walls with clean gritty free drainage gravel including cost and drainage gravel having PHI value more than 35 conveyence of gravel to worksite laying, handling charges and filling in layers tamping under Optimum Moisture content to get the maximum density, including watering, with all leads and lifts for water and allother incidental charges, etc.., Complete as per Cl. 710.1.4 & Appendix 6 of IRC 78-2014
-
-
-
At km 0/0
10
-
172
At km 1/8
10
-
172
At km 2/8
10
-
196
Providing and fixing of G.I Drainage Spouts of 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing , including cost and conveyance of Galvanised iron pipes and flats and fixing them in position as per MORTH Rev. V Specification No.2705
-
-
-
At km 0/0
2
-
2271
At km 1/8
2
-
2271
At km 2/8
2
-
2271
Supplying and fixing of 12mm thick bitumenous pad for joints as directed by engineer-in-charge
-
-
-
At km 0/0
10
-
479
At km 1/8
10
-
479
At km 2/8
10
-
479
SUB ESTIMATE - Reconstruction of Single CELL Box Culvert of 2.00x2.00
Dismantling the the existing Plain Cement concrete in the existing damaged culvert and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.(Specification No.202.)
14
-
419
Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation of BOx Culvert (Specification No.304.)
-
-
-
At km 1/4(ii)
124
-
263
At km 3/2
124
-
263
Plain Cement Concrete M15 grade (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants etc. Complete for Levelling Course for Box Culvert as per MORTH Rev. V Specification No. 1000,1500,1700,2200
-
-
-
At km 1/4(ii)
12
-
5539
At km 3/2
12
-
5554
Vibrated Reinforced Cement concrete in M25 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete for Base slab Side wall & Deck slab of CELL BOX as per MORTH Rev. V Specification No. 1000,1500,1700,2200,2300
-
-
-
At km 1/4(ii)
34
-
10879
At km 3/2
34
-
10894
Vibrated Reinforced Cement concrete in M25 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete for Approach slab as per MORTH Rev. V Specification No. 1000,1500,1700,2200,2300
-
-
-
At km 1/4(ii)
14
-
8221
At km 3/2
14
-
8237
Supply and fabrication of Tor steel grade Fe-500D steel required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and palcing the reinforcement in position as specified in the drawings including cost of binding wire, provision for spacing bars, cover blocks and all other incidental charges etc., complete as per per MORTH Rev. V specifications No.1600.
-
-
-
At km 1/4(ii)
3.5
-
93230
At km 3/2
3.5
-
93230
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, formwork, cost of premoulded expansion joints and fixing the same in position etc., excluding steel complete for wearing coat of 75mm uniform thickness over deck slab as per MORTH Rev. V Specification No.1000, 1500, 1700, 2702.
-
-
-
At km 1/4(ii)
64
-
666.4
At km 3/2
64
-
667.5
Vibrated Cement Concrete M20 grade (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including all other incidental charges etc for Wing wall and Parapet Wall as per MORTH Rev. V Specification No.1000, 1500, 1700, 2200,2300
-
-
-
At km 1/4(ii)
38
-
7963
At km 3/2
38
-
7978
Providing and fixing PVC Seepage Pipes of 100mm dia at 1.0m c/c staggered of required lengths for abutments and return walls including cost and conveyance of all materials to work site and labour charges for fixing etc, complete to drain of the backfill as per MORTH Rev. V Specification No.2706
-
-
-
At km 1/4(ii)
6
-
177.5
At km 3/2
6
-
177.5
Filling Gravel behind the abutments and return walls with clean gritty free drainage gravel including cost and drainage gravel having PHI value more than 35 conveyence of gravel to worksite laying, handling charges and filling in layers tamping under Optimum Moisture content to get the maximum density, including watering, with all leads and lifts for water and allother incidental charges, etc.., Complete as per Cl. 710.1.4 & Appendix 6 of IRC 78-2014
-
-
-
At km 1/4(ii)
14
-
188
At km 3/2
14
-
196
Providing and fixing of G.I Drainage Spouts of 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing , including cost and conveyance of Galvanised iron pipes and flats and fixing them in position as per MORTH Rev. V Specification No.2705
-
-
-
At km 1/4(ii)
2
-
2271
At km 3/2
2
-
2271
Supplying and fixing of 12mm thick bitumenous pad for joints as directed by engineer-in-charge
-
-
-
At km 1/4(ii)
13
-
479
At km 3/2
13
-
479
Calculation of SubTotal, GST and Total carried out by system automatically
-
-
-
Sub Total Amount for above all items (excluding GST)
1
-
40102326.41
GST 18% for above SubTotal Amount
1
-
7218418.75
Total in Figures (SubTotal + GST)
-
-
-