National Bank For Agriculture And Rural Development Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date9 Sep 2024
Closing Date24 Sep 2024
Tender Amount₹ 1,79,20,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying of Prime coat using Emulsion bitumen (SS1 ) at the rate of 7Kg/10 Sqm. over the WMM surface preparatory to another bituminous construction over it as per MORT&H Vth Revision 111, 112, 501, 502, 900

5020.83

409850

81.63

... More
Providing and laying of tack coat using Emulsion bitumen (RS1 ) at the rate of 2.50 Kg./ 10 Sqm. over the Primed surface preparatory to another bituminous construction over it as per MORT&H Vth Revision 111, 112, 501, 503, 900

5020.83

94492

18.82

... More
Bituminous macadam of 50mm thickness which work shall consist of construction, in a single course of compacted crushed aggregates premixed with bituminous binder 60/70 grade bulk (VG 30) bitumen which will be procurred by the Contractor at the rate of 3.5 percent by weight of the total mix, to serve as base / binder couse, in accordance with the requirement of the specifications and in conformity with the drawing or as directed by the Engineer using approved CMP and paver finisher as per MORTH Vth Revision 111, 112, 501, 504, 900

251.06

2219581

8840.84

... More
Providing and laying 30 mm thick compacted Bituminous Concrete which shall consist of construction of a single course binder / wearing course on a previously prepared bituminous base to the requirements of the specification using 60/70 Grade bitumen (VG 30) as per MORT & H Vth Revision 111, 112, 501 507 900

150.63

1678693

11144.48

... More
Collection and supply of carted earth including excavation, removal and satisfactory disposal of all materials necessary for the construction of road way in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for making up low berms as per MORT&H Vth Revision 111, 112, 202, 301, 302, 303, 305, 900

864.6

236347

273.36

... More
Providing and erecting direction and place identification retro reflectorised sign made out of high intensity prismatic grade sheeting confirming to Type IV standards of IRC 67: 2012 and ASTM D 4956-09 specification and fixed over 2 mm thick aluminium sheet fixed over a back supporting frame of 25 mm x 25 mm x 3mm mild steel angle and supported on a mild steel angle post 75 x 75x 6 mm with clear height of not less than 2.10 m from the ground level to the bottom of sign board and 0.6 m below ground level. The sign post should be painted asper IRC 67-2012 and firmly fixed to the grond by meand of properly designed foundation with M15 grade CC 45 cmx45cmx60 cm size including cost and conveyance of all materials equipment,machinary andlabour with all leads and lifts ,loading charges necessary for satisfactory completion of the work as directed by the engineer in charge . High intensity retro reflectro sheet shall consist of minimum coefficent as per table 6.6 of IRC 67 2012. the retro reflective sheeting shall be covered under 7 years warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012 ( as per MORT&H specification No.801 (for sign having area more than 0.90 Sqm) Type - IV

2.16

25498

11805

... More
Providing R.C.C M15 grade Precast HM stone of standard design as per IRC 8-1980 and fixing in position including painting and printing etc complete as per MORT&H Vth Revision No.804

6

3447

574.65

... More
Providing R.C.C M15 grade Precast KM stone of standard design as per IRC 8-1980 and fixing in position including painting and printing etc complete as per MORT&H Vth Revision No.804

1

2197

2197

... More
FOR CROSS DRAINAGE WORKS- BOX CULVERT

-

-

-

... More
Dismantling the existing Brick / Stone Masonry in cement Mortar under 3m height in the existing causeway / bridge ad clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officer including all labour and incidental charges etc., complete. as per MORT&H Vth Revision 111, 112, 202

15.9

4501

283.14

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank as per SS 20 B with all leads and lifts and all other incidental charges such as bailingout water shoring strutting, walling & forming protective bunds wherever necessary etc., complete as per relevant standard specification for DRESSING THE BED UPTO SILL LEVEL as per MORT&H Vth Revision 304.

16.83

2074

123.26

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges such as bailing out water, sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOUNDATION as per MORTH Vth Revision 304.

21.88

5393

246.52

... More
Plain cement concrete M15 Grade (Nominal mix) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for LEVELLING COURSE BELOW FOUNDATION as per MORTH Vth Revision 1000, 1500, 1700, 2100.

5.05

30900

6119

... More
Vibrated Reinforced Cement Concrete M25 (Design mix) using 20mm and 12mm ISS HBG graded metal including cost and conveyance of all materials to work site,, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for BOX CULVERT BASE SLAB, SIDE WALLS AND TOP SLAB as per MORTH Vth Revision 1000, 1500, 1700, 2100.

26.53

303741

11449

... More
Supply and fabrication of steel grade Fe-500 required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening, cutting, bending, tying grills,hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges, etc., complete as per standard specification as per MORTH Vth Revision 1000, 1600.

2

191600

95609.27

... More
Vibrated Cement Concrete M30 (Design mix) with surface reinforcement using 20mm 12mm and 6mm ISS HBG graded metal including cost and conveyance of all materials to work site, but including cost and labour charges for form work cost of premoulded expansion joint and fixing the same in position and centering labour charges for compacting, curing, including all incidental charges etc., complete for wearing coat of 75mm uniform thickness over deck slab as per MORT&H Vth Revision 1500, 1600, 1700, 2702.2

19.11

13910

727.9

... More
Vibrated cement concrete M15 Grade (Nominal mix ) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for PARAPET as per MORTH Vth Revision 1000, 1500, 1700, 2100.

0.95

10621

11181

... More
Filling the trench with Carted earth including cost and conveyance of material to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete for Box culvert, Side wall as per MORTH V Revision 304

13.68

3078

225.06

... More
Collection and supply of carted earth including excavation, removal and satisfactory disposal of all materials necessary for the construction of road way in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for Diversion Road as per MORT&H Vth Revision 111, 112, 202, 301, 302, 303, 305, 900

292.5

79957

273.36

... More
FOR CROSS DRAINAGE WORKS- LOAD BEARING DRAIN

-

-

-

... More
Dismantling the existing Brick / Stone Masonry in cement Mortar under 3m height in the existing causeway / bridge ad clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officer including all labour and incidental charges etc., complete. as per MORT&H Vth Revision 111, 112, 202

15.12

4281

283.14

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges such as bailing out water, sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOUNDATION as per MORTH Vth Revision 304.

30.18

7439

246.52

... More
Plain cement concrete M15 Grade (Nominal mix) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for LEVELLING COURSE BELOW FOUNDATION as per MORTH Vth Revision 1000, 1500, 1700, 2100.

4.65

28473

6123.33

... More
Vibrated Reinforced Cement Concrete M25 (Design mix) using 20mm and 12mm ISS HBG graded metal including cost and conveyance of all materials to work site,, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for LOAD BEARING DRAIN BASE SLAB, SIDE WALLS AND TOP SLAB as per MORTH Vth Revision 1000, 1500, 1700, 2100.

25.2

364904

14480.33

... More
Supply and fabrication of steel grade Fe-500 required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening, cutting, bending, tying grills,hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges, etc., complete as per standard specification as per MORTH Vth Revision 1000, 1600.

1.59

152018

95609.27

... More
Vibrated cement concrete M15 Grade (Nominal mix ) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for PARAPET as per MORTH Vth Revision 1000, 1500, 1700, 2100.

2.03

23441

11547.69

... More
Collection and supply of carted earth including excavation, removal and satisfactory disposal of all materials necessary for the construction of road way in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for Diversion Road as per MORT&H Vth Revision 111, 112, 202, 301, 302, 303, 305, 900

540

147614

273.36

... More
FOR CROSS DRAINAGE WORKS- THREE CELL BOX CULVERT

-

-

-

... More
Dismantling the existing Brick / Stone Masonry in cement Mortar under 3m height in the existing causeway / bridge ad clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officer including all labour and incidental charges etc., complete. as per MORT&H Vth Revision 111, 112, 202

34

9626

283.14

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank as per SS 20 B with all leads and lifts and all other incidental charges such as bailingout water shoring strutting, walling & forming protective bunds wherever necessary etc., complete as per relevant standard specification for DRESSING THE BED UPTO SILL LEVEL as per MORT&H Vth Revision 304.

32.42

3996

123.26

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges such as bailing out water, sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOUNDATION as per MORTH Vth Revision 304.

129

31801

246.52

... More
Plain cement concrete M15 Grade (Nominal mix ) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for LEVELLING COURSE BELOW FOUNDATION as per MORTH Vth Revision 1000, 1500, 1700, 2100.

17.69

108245

6119

... More
Vibrated cement concrete of grade M15, (Nominal Mix) using 40mm ISS HBG metal, including cost and conveyance of all materials to site and cost of cement at site, including all labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants, with all leads for potable water, including all other incidental charges etc; complete as per relevant standard specifications, for APRON CURTAIN WALL as per Sections 1500 & 1700 of MORT&H

20.16

215490

10689

... More
Vibrated cement concrete of grade M15, (Nominal Mix) using 20mm ISS HBG metal, including cost and conveyance of all materials to site and cost of cement at site, including all labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants, with all leads for potable water, including all other incidental charges etc; complete as per relevant standard specifications, for APRON FLOORING as per Sections 1500 & 1700 of MORT&H

7.48

46346

6196

... More
Cement concrete of Grade M 10 (Nominal mix) using 40mm ISS HBG metal, including cost and conveyance of all materials to site and cost of cement at site including potable water, labour charges for mixing, transporting, laying compacting,curing concrete, working at depths , Tools and Plants and incidential charges such as bailing out water, maintaining protective bunds cofferdams, shoring, strutting etc; complete as per relevant standard specification , for LEVELLING COURE BELOW APRON FLOORING As per Sections 2100 of MORT&H Specifications (Fifth Revision).

2.41

13120

5444

... More
Vibrated Reinforced Cement Concrete M25 (Design mix) using 20mm and 12mm ISS HBG graded metal including cost and conveyance of all materials to work site,, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for BOX CULVERT BASE SLAB, SIDE WALLS AND TOP SLAB as per MORTH Vth Revision 1000, 1500, 1700, 2100.

101.12

1118791

11064

... More
Supply and fabrication of steel grade Fe-500 required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening, cutting, bending, tying grills,hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges, etc., complete as per standard specification as per MORTH Vth Revision 1000, 1600.

10.53

1006287

95609.27

... More
Vibrated Cement Concrete M30 (Design mix) with surface reinforcement using 20mm 12mm and 6mm ISS HBG graded metal including cost and conveyance of all materials to work site, but including cost and labour charges for form work cost of premoulded expansion joint and fixing the same in position and centering labour charges for compacting, curing, including all incidental charges etc., complete for wearing coat of 75mm uniform thickness over deck slab as per MORT&H Vth Revision 1500, 1600, 1700, 2702.2

107.55

78285

727.9

... More
Filling the trench with Carted earth including cost and conveyance of material to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete for Box culvert, Side wall as per MORTH V Revision 304

2.44

549

225.06

... More
Vibrated cement concrete M15 Grade (Nominal mix ) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for PARAPET as per MORTH Vth Revision 1000, 1500, 1700, 2100.

6.45

69092

10712

... More
Vibrated cement concrete M20 Grade (Nominal mix ) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for FOUNDATION OF RETURN WALL (BELOW SILL LEVEL) as per MORTH Vth Revision 1000, 1500, 1700, 2100.

32.21

233747

7257

... More
Vibrated cement concrete M20 Grade (Nominal mix) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for RETURN WALL (ABOVE SILL LEVEL) as per MORTH Vth Revision 1000, 1500, 1700, 2100.

34.74

303801

8745

... More
Providing and fixing 100mm dia PVC SEEPAGE PIPES of required length for abutment and returns including cost and conveyance of all materials to worksite, cost and labour for semisperical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., to drain of the backfill as per MORT&H Vth Revision 2700

24

4620

192.5

... More
Collection and supply of carted earth including excavation, removal and satisfactory disposal of all materials necessary for the construction of road way in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for Diversion Road as per MORT&H Vth Revision 111, 112, 202, 301, 302, 303, 305, 900

438.75

119936

273.36

... More
CONSTRUCTION OF TOE WALL

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges such as bailing out water, sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOUNDATION as per MORTH Vth Revision 304.

262.8

64785

246.52

... More
Vibrated cement concrete M20 Grade (Nominal mix) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for BASE SLAB AND BODY WALL (Below Sill Level). as per MORTH Vth Revision 1000, 1500, 1700, 2100.

203.67

1492086

7326

... More
Vibrated cement concrete M20 Grade (Nominal mix ) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete for BODY WALL (Above Sill Level). as per MORTH Vth Revision 1000, 1500, 1700, 2100.

117.17

1200172

10243

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items (excluding GST)

1

-

15182253.01

... More
GST 18% for above SubTotal Amount

1

2732805

2732805.54

... More
Total in Figures (SubTotal + GST)

-

17915058

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.